Work Package 3 FixO3 “label” FixO3 General Assembly 14 -16 October 2014, Heraklion-CRETE Jean-Francois Rolin, George Petihakis IFREMER, HCMR.

Slides:



Advertisements
Similar presentations
ERA-LEARN Supporting the ERA-NET Learning Platform by creating a toolbox for the ERA-NET community Roland Brandenburg, FFG.
Advertisements

DS-01 Disaster Risk Reduction and Early Warning Definition
New Technologies for Tuberculosis Control: Programme Perspective Draft Definitions Retooling Task Force Meeting Geneva, Switzerland January 2008.
nd MonGOOS, Madrid, 2-4 October 2013 Second MonGOOS meeting The JERICO Consortium.
Portable and Predictable Performance on Heterogeneous Embedded Manycores (ARTEMIS ) ARTEMIS Project Review October 2014 WP1 “Management and IPR”
JERICO KICK OFF MEETINGPARIS – Maison de la recherche - 24 & 25 May 2011 WP4 HARMONIZING OPERATION AND MAINTENANCE METHODS Hellenic Centre for Marine Research.
Work Package 3 PROCEDURAL HARMONISATION FixO3 General Assembly 14 – 16 October 2014, Heraklion-CRETE George Petihakis, HCMR.
JERICO KICK OFF MEETINGPARIS – Maison de la recherche - 24 & 25 May 2011 WP1: A Common Strategy Pascal Morin (INSU) Ingrid Puillat (Ifremer) Dominique.
Work Package 2 / 3 TECHNOLOGIAL & PROCEDURAL HARMONISATION FixO3 General Assembly 14 th to the 16 th October 2014, Heraklion-CRETE ANTARES, CNRS, D.Lefevre,
Speaker I Organism I adresse mail , June 18/19th I UPMC I Paris JERICO MID TERM REVIEW Wp 11 Management.
Work Package 2 / 3 TECHNOLOGIAL & PROCEDURAL HARMONISATION FixO3 General Assembly 14 th to the 16 th October 2014, Heraklion-CRETE Marc Nogueras, Universitat.
1 Plans for the European contribution to OceanSITES. FixO 3 Richard Lampitt National Oceanography Centre Southampton UK.
One year into multidisciplinary observations Sofia Alexiou, Project Manager National Oceanography Centre, Southampton FixO³ First Year – EuroGOOS 2014,
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
Wilhelm PetersenI HZGI 2013, June 18/19th I UPMC I Paris JERICO MID TERM REVIEW WP 3 Harmonizing technological.
Work Package 2 / 3 TECHNOLOGIAL & PROCEDURAL HARMONISATION FixO3 General Assembly 14 th to the 16 th October 2014, Heraklion-CRETE
Jo Foden I Cefas I 5 to / Oslo / Norway WP6: OUTREACH Jo Foden (Cefas) David Mills, Simon Keeble, Aldo.
Project Integration Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project.
Work Package 6 Interface with policy and intergovernmental bodies Peter M Haugan, Geophysical Institute, University of Bergen.
Work Package 2 / 3 TECHNOLOGICAL & PROCEDURAL HARMONISATION FixO3 General Assembly 14 th to the 16 th October 2014, Heraklion-CRETE ESTOC, PLOCAN,
Work Package 9 TRANSNATIONAL ACCESS First TNA Call FixO3 General Assembly 14 th to the 16 th October 2014, Heraklion-CRETE Marimar Villagarcía, Eric Delory.
Work Package 2 / 3 TECHNOLOGIAL & PROCEDURAL HARMONISATION FixO3 General Assembly 14 th to the 16 th October 2014, Heraklion-CRETE Jérôme Blandin, IFREMER.
Work Package 2 / 3 TECHNOLOGIAL & PROCEDURAL HARMONISATION FixO3 General Assembly 14 th to the 16 th October 2014, Heraklion-CRETE E2M3A, OGS Italy [P.I.
Work Package 3 PROCEDURAL HARMONISATION Task 3.1: Assessment of procedures FixO3 General Assembly 14 th to the 16 th October 2014, Heraklion-CRETE Pericles.
JERICO A Joint European Research Infrastructure network for Coastal Observatories Glenn Nolan, Henning Wehde, Patrick Farcy, Stefania Sparnocchia and George.
Work Package 2 / 3 TECHNOLOGIAL & PROCEDURAL HARMONISATION FixO3 General Assembly 14 th to the 16 th October 2014, Heraklion-CRETE Maureen Pagnani, BODC/NOC,
Final General Assembly – Paris, France – September 19, 2014 FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011.
Work Package 2 / 3 TECHNOLOGIAL & PROCEDURAL HARMONISATION FixO3 General Assembly 14 th to the 16 th October 2014, Heraklion-CRETE Observatory 1 - FRAM.
Patrick FARCY I Ifremer I 5 to / Oslo / Norway 2 nd General Assembly – NIVA HQ MANAGEMENT REPORTING (WP11)
Work Package 7 International and European networking of fixed-point observatories Bénédicte FerréJérôme Blandin.
Update on WP4 and Tsunami Use Case CoopEUS annual meeting, Helsinki, September 29 – October 3, 2014 L. Beranzoli (INGV/EMSO Interim Office) M.M.R. Best.
Speaker I Organism I adresse mail 5 to / Oslo / Norway 2 nd General Assembly – NIVA HQ WP5: DATA MANAGEMENT AND DISTRIBUTION.
MARINERA Marine ERAnet European Research Area Identify research infrastructures Promote exchange between research teams in and outside Europe Organise.
MyOcean2 First Annual Meeting – April 2013 WP 15 THEMATIC & ASSEMBLY CENTRE for In Situ MyOcean2 First Annual Meeting – Cork /16-17 April 2013.
Work Package 8 Outreach & Training Simon Keeble Blue Lobster.
MRI Expert Group JERICO A Joint European Research Infrastructure network for Coastal Observatories.
1 The IMAGE project I ndicators for fisheries MA naGement in E urope A specific targeted research project under the European Commission 6 th framework.
24 marine institutes, universities, foundations and SMEs, + 1 associated partner - from 16 European countries - agree to propose together their research.
WP5: DATA MANAGEMENT AND DISTRIBUTION Overview and Status: months Caterina Fanara 1, Loic Petit De La.
1 USPS/MTAC Work Group MOVE Update Initiative November 6, 2002 Angelo Wider and Joel Thomas.
Nadia PinardiI CMCCI Via A.Moro 44, Bologna 5 to / Oslo / Norway 2 nd General Assembly WP9- NEW METHODS TO ASSESS THE IMPACT.
EuroGOOS Annual Meeting 2009/10/ /10/08 2b: Contribution of open ocean observatories to GEO Data Core – Biodiversity, Ecosystems and Health Richard.
JERICO KICK OFF MEETINGPARIS – Maison de la recherche - 24 & 25 May 2011 WP 7 SERVICES AND DATA ACCESS.
P. Morin I CNRS/INSU I 5 to / Oslo / Norway 2 nd General Assembly – NIVA HQ WP1 A Common Strategy P. Morin,
EuroGOOS Annual Meeting 2009/10/ /10/08 ESONET All Regions Workshop 2009, October 5-7 th, Paris Integrating and Enhancing the European capacity for.
JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP3: Harmonizing technological aspects Wilhelm Petersen Helmholtz-Zentrum.
Speaker I Organism I adresse mail Date I City I Land Future Strategy for Coastal Observatories From National programme to a pan European.
Heidelberg, 3 March1998 PNOs-Suppliers Technical Interfaces P619 IMPROVEMENTS OF PNO-SUPPLIER TECHNICAL INTERFACES Ola Espvik.
Work Package 2 / 3 TECHNOLOGIAL & PROCEDURAL HARMONISATION FixO3 General Assembly 14 th to the 16 th October 2014, Heraklion-CRETE Alicia Lavín, IEO Santander,
Speaker I Organism I adresse mail GA & BPW I Heraklion I Crete – Greece WP 1: A common stategy P. Morin, D. Durand, P. Farcy and.
WP3 Harmonization & Integration J. Lauterjung & WP 3 Group.
WP4 – Legal and Governance Framework for TCS and ICS Implementation Elisabeth Kohler & Helle Pedersen (CNRS), Annakaisa Korja & Pirjo Kontkanen (UH), Florian.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
ERA-PLANET KoM, Brussels February 2016 WP4- Follow-up and monitoring of projects Dr. Joan Masó Center of Research in Ecology and Forestry Application.
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
Sensor Web Enablement (SWE) developments for fixed monitoring platforms and research vessels By Dick M.A. Schaap – SeaDataNet Technical Coordinator with.
Session 6 Observatories optimization and development Ute Schuster, University of Exeter, UK Jean-Francois Rolin, Ifremer, France.
JERICO KICK OFF MEETINGPARIS – Maison de la recherche - 24 & 25 May 2011 JERICO Overall WP presentation.
WP2 Technological Harmonization
Task 2.6 Eric Delory PLOCAN
WP 10 - Service activities: Access to data products and knowledge
Work Package 2 TECHNOLOGICAL HARMONISATION Reporting period
MERMAID Innovative multi-purpose offshore platforms: planning, Design and operation MERMAID.
FP7-Infra : Design studies for European Research Infrastrutures
Workshop on freight train derailments - Introduction -
Simon Claus Flanders Marine Institute (VLIZ)
O3YellowPages “Open Ocean Observatories Yellow Pages – O3YP”-
Patrick Farcy, Simon Keeble, Aldo Drago
* WP07 Strengthening of Young Scientists Qualification
Animal-Borne Instrument Task Team ABI TT Terms of Reference
Presentation transcript:

Work Package 3 FixO3 “label” FixO3 General Assembly October 2014, Heraklion-CRETE Jean-Francois Rolin, George Petihakis IFREMER, HCMR

Task 3.3: FixO3 “label” IFREMER (Lead); NERC, OGS, UAzores, (M0 – M48) This task will define the FixO3 label for offshore platforms in compliance with other normative efforts (EU projects SeaDataNet & MyOcean, EU initiative EMODNet) COPERNICUS from 2014). It will develop a list of FixO3 label requirements in terms of variables measured, the frequency of measurement, quality control of data as well as assured sustainability. It will ensure a wide publicity by using the tools offered in WP8 (Outreach and Training), in order to reach the fixed- point observatory community outside FixO3. WP3 – Procedural Harmonisation Task 3.3: FixO3 “label”

WP3 – Procedural Harmonisation Task 3.3: FixO3 “label”

A synthesis but not only Label definition Rules Applied Nomination Protection Update Mitigating measures Environmental impact Recommendations – coastal buoys – Life cycle and tests – Metrology, calibration Label definition Rules Applied Nomination Protection Update Mitigating measures Environmental impact Recommendations – coastal buoys – Life cycle and tests – Metrology, calibration Life cycle and tests Deep sea stations – Communication – Interoperability – Corrosion assessment Life cycle and tests Deep sea stations – Communication – Interoperability – Corrosion assessment JERICO LABEL ESONET LABEL Data management policy (WP4 and coordination) Deep sea mooring according to TNA experience Sensor interfaces (WP4) Data management policy (WP4 and coordination) Deep sea mooring according to TNA experience Sensor interfaces (WP4) New Issues FixO3 LABEL

Timeline First version M16 Task 7.3 (Ensure interface with ESONET-EMSO label consortium) Deliverable M18 EMSO ERIC may use FixO3 label as rules for mandatory items Specification for common procurement Task 7.3 (Ensure interface with ESONET-EMSO label consortium) Deliverable M18 EMSO ERIC may use FixO3 label as rules for mandatory items Specification for common procurement FixO3 must test the recommendations Final version M36