Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT24 Update To:DCIT24 Plenary From: Matt Maki Date: 06.13.2013.

Slides:



Advertisements
Similar presentations
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 20th MEETING OF WORKING.
Advertisements

Federal Aviation Administration Performance Based Communication and Surveillance (PBCS) Data Link Operational Authorization Process Date:13-14 May 2013.
Federal Aviation Administration Data Communications Program DCIT Update MEM ATCT DCL Trials To:DCIT Plenary From: Matt Maki Date:
FAA Presentation to CAR/SAM ATN/GNSS Seminar, Varadero, Cuba, May 2002 Current Status of FAA Controller-Pilot Data Link Communication (CPDLC) - Build 1,
Presented January 20, 2011 by: John Allen Director, Flight Standards Service (AFS-1) Federal Aviation Administration Public Aircraft Operations Forum.
General Authority of Civil Aviation 1 Air Carriers & Operators In Saudi Arabia Saudi Arabia has made a decision to liberalize the Civil Aviation Market.
By: Date: FAA Overview Freely Associated States Jim Spillane, Sr. FAA Rep., Pacific Rim April 5, 2013.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status / Overview DCIT #26 Plenary From: Matt Maki / DCL Trials Lead.
Federal Aviation Administration Data Communications Program DCL Trials DCIT Update MEM ATCT To:DCIT Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Implementation Team (DCIT) Departure Clearance Trials (DCL) Test Status DCIT Meeting # 22 Washington,
Federal Aviation Administration Data Communications Implementation Team (DCIT) Trials Activities/DTAP Update Schedule Timelines Matt Maki.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: AOC WG From: Data Comm Production Sub-Team Date: 07/11/12.
AVS Repair, Alteration and Fabrication Team (RAFT) Results
Federal Aviation Administration Data Communications Program DCL Trials DCIT Update MEM ATCT To:DCIT Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Integration Team (DCIT) DCL Trials test activities Presented to:DCIT # 15 By:Peter Muraca FAA Date:May.
Presented to: DCIT #12 Plenary By: Andy Fry, Thane Inc. Date: January 12, 2012 Federal Aviation Administration Data Communications DCIT Update Flight Deck.
Data Link Communications
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #25 Agenda 07/17-07/18/2013 Harris Corp – Washington, D.C.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT23 Update To:DCIT23 Plenary From: Matt Maki Date:
Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig & Pete Muraca.
Presented to: DCIT FDWG Breakout Session By: Andy Fry, Thane Inc. Date: July 11, 2012 Federal Aviation Administration Data Communications DCIT #16 Flight.
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
Federal Aviation Administration Data Communications Program Departure Clearance (DCL) Trials DCIT17 To:DCIT Plenary From: Matt Maki, Trials Lead Date:
Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT25 Update To:DCIT25 Plenary From: Matt Maki Date:
By: Nan Shellabarger Date: February 28, 2006 Federal Aviation Administration FAA Forecast.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #33 Agenda 6/4/2014 Harris – Washington, DC.
EWR DCL Flight Tests Capt Gregg Kastman MD-11 Flt Trng Sup.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #24 Agenda 06/12-06/13/2013 Boeing – Arlington, VA.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #21 Plenary 02/01/2013 To: DCIT By: Gregg Anderson.
EWR DCL Trial Update Capt Gregg Kastman MD-11 Flt Trng Sup.
Presented to: By: Date: Federal Aviation Administration DCIT 41 Plenary Mark Patterson, FAA, AFS June 2015 Flight Standards Update.
Presented to: By: Date: Federal Aviation Administration DCIT 40 Plenary Mark Patterson, FAA, AFS April 2015 Flight Standards Update.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT Meeting 08/24/2011.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #23 Plenary 05/09/2013 To: DCIT By: Gregg Anderson.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT Update To:DCIT Plenary From: Matt Maki Date:
Presented to: By: Date: Federal Aviation Administration DCIT 44 Mark Patterson, FAA, AFS Nov 2015 Flight Standards Update.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Data Communications Implementation Team (DCIT) DCIT #44 Plenary DCL Trials.
Presented to: DCIT By: Andy Fry, Thane Inc. Date: September 26, 2013 Federal Aviation Administration Data Communications DCIT FDWG Climb Via Discussion.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status / Overview DCIT #27 Plenary From: Matt Maki / DCL Trials Lead.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT 37 Plenary Agenda December 10, 2014 Harris Corp Washington, DC.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #15 Plenary 05/31/2011 To: DCIT By: Gregg Anderson.
| 1 harris.com Matt Maki DCL Trials Lead DCL Trials Decommissioning Plan 29 Sep 2015.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: AOC WG From: Data Comm Production Sub-Team Date: 08/22/12.
Presented to: By: Date: Federal Aviation Administration FAA/Delta Airlines EDR Proof of Concept Demo Friends/Partners of Aviation Weather (FPAW) Meeting,
Federal Aviation Administration Presented To: IPACG/39 Presented By: Dennis Addison, FAA Date: February 5-6, 2014 IP06: ADS-B In-trail- Procedure (ITP)
Federal Aviation Administration Data Communications Implementation Team (DCIT) Data Communications Implementation Team (DCIT) DCIT #31 PLENARY DCL Trials.
Presented to: By: Date: Federal Aviation Administration Runway Safety Nextgen Initiatives Capstone 3 Industry Day Paul S. Erway, AJS-4SW, Runway Safety.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status Updates To:DCIT21 Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Program Final Investment Decision (FID) – Update on May 30, 2012 Presented to:SC-214/WG-78 Plenary.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #9 Meeting 09/21/2011 To: DCIT By: Gregg Anderson.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCL Trials ”T e s t S t a t u s” Presented to:DCIT, Meeting #18 Presented.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #22 Plenary 03/14/2013 To: DCIT By: Gregg Anderson.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #16 Plenary 05/31/2011 To: DCIT By: Gregg Anderson.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #25 Agenda 07/17-07/18/2013 Harris Corp – Washington, D.C.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Data Communications Implementation Team (DCIT) DCIT #32 PLENARY DCL Trials.
DCIT Document Hierarchy End-to-End Procedures and operational system features effecting multiple organizations Systems Integration Document Detailed system.
Presented to: DCIT Flight Deck Working Group By: Andy Fry, Thane Inc. Date: October 12, 2011 Federal Aviation Administration Data Communications DCIT #10.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #12 Plenary 01/12/2011 To: DCIT By: Gregg Anderson.
International Civil Aviation Organization
EWR DCL Flight Tests Capt Gregg Kastman MD-11 Flt Trng Sup
Ops Metrics.
Data Communications Implementation Team (DCIT)
Data Communications Implementation Team (DCIT)
Flight Standards Update
Data Communications Implementation Team (DCIT)
Data Communications Program
Presentation transcript:

Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT24 Update To:DCIT24 Plenary From: Matt Maki Date:

Federal Aviation Administration Agenda Patch 4 Testing Status / MEM-EWR Installs MEM / EWR Operational Trials Status/Results Patch 5 / Build 7 Status MEM Test NCP Extension: JW925-FDIO-1001 / T

Federal Aviation Administration Current DTAP Patch 4 Outlook 6/4:Factory Acceptance Testing Thales 6/5:Patch 4 Installed at the WJHTC 6/6-14:Patch 4 Testing at the WJHTC 6/17:EWR Install 6/18-20:EWR Pre-SAT Testing 6/24:MEM Install (Includes UPS upgrade) 6/25-27:MEM Pre-SAT Testing along with proposed 6/27 MGT demo - 24x7 Checkpoint 3

Federal Aviation Administration MEM Trials Current Status Continued FDX Limited Ops (As of 6/13): -35 to 50 DCL ops ‘shakeout’ period (20 MD-11, 15 B777 ops minimums) -36 successful CAF DCL issued since April 17 start (28 MD-11, 8 B777) -34 CAF, 2 UM80 Initial DCLs Issued -5 UM79, 3 UM80 Revisions issued -Additional ops up to 6/23 planned MD-11 UM79 Revisions stopped after May 3 Op due to FDX FD observed en-route FMS Map ‘To Point’ Magenta Line re-draw (back to original route): -Boeing/Honeywell identified and can reproduce issue -Procedural Work around being presented to Flight Deck Working Group at Boeing/Long Beach -EWR/UPS MD-11 to try to duplicate issue -MEM 24x7 Trials Ops ‘Go’ Date pending FDX work around acceptance 4

Federal Aviation Administration EWR Trials Current Status Continued Limited Ops (As of 6/13): -6 successful CAF DCL issued since May 16 start (3 MD-11, 2 B777, 1 A340) -6 CAF DCLs Issued -2 UM79, 1 UM80 Revisions issued -Additional ops up to 6/14 planned -Limited Trials Ops can resume 6/21 -Additional ATC DTAP support expected after 6/21 or Refresher Training Domestic and International Participation: UPS BAW SAS -FDX (pending first Revenue operation) -DLH, DLH Cargo, Swiss Air (pending initial testing) 5

Federal Aviation Administration DTAP Patch 5 and Build 7 Status DTAP Patch 5 Requirements / Delivery Status: -EWR ATC Requirements (4 Total) -Thales cost/schedule proposal currently undergoing Gov evaluation -Dual Contact / Drop Down Remarks proposal for a summer delivery -Remaining Requirements delivery proposal moved to late Fall -Combine remaining reqs with pending Build 7 proposal/estimate Thales to Scope Build 7 Requirements for Scope, Schedule Cost: -FAA options to select specific functionality based on schedule/cost consideration -Build Contract Acceptance and Delivery to FAA currently TBD 6

Federal Aviation Administration MEM/EWR Test NCP Status MEM Test NCPs: JW925-HNL-1004 / T34840 ZME HADDS Connection (EXTENSION) NAS CCB Approved – 5/2/2013 JW925-FDIO-1001 / T34501 MEM DTAP FDIO/PCRCU Echo Port Connection NCP Issuance Date - 8/25/2012 EWR Test NCPs: JW925-HNL-1003 / T34752 ZNY HADDS Connection NAS CCB Approved – 5/2/2013 JW925-FDIO-1002 / T34753 EWR DTAP FDIO/PCRCU Echo Port Connection NAS CCB Approved – 5/2/2013 JW925-ATCT-1002 / T34759 EWR DTAP Equipment Space ESA Approved – 3/4/2013 7

Federal Aviation Administration Questions ? KUSA