Pinole Valley High School (PVHS) Project Status 1 Facilities Subcommittee Meeting March 15, 2016.

Slides:



Advertisements
Similar presentations
FAA Project - Bidding Phase FAA Recommends.. Consider how you would like to bid the project early on in the design. Due to possible budget constraints.
Advertisements

Delivering Successful Facility Projects It Starts and Ends with You!
Program Controls Systems & Processes Board of Trustees Workshop October 11, 2005.
Lessons Learned: CM at Risk & Design Build
Construction Cost$81,145,453 Notice of Completion04/01/ /15/2014 FSC Meeting.
Bond Program Planning Imperatives Study Session October 12, 2004.
ENGINEERING AND TECHNOLOGY Northwest Public Works Institute Liz Moorhead, PE Senior Engineer, City of Portland.
WCCUSD Bond Program Project Status Report
Bids ranged from $992,264 to $1,999,305 JO-SH General Engineering was apparent low bidder Lash Construction 2 nd $1,156,453 Construction to start.
Additive Alternates on ODOT let Projects -A discussion- Joe Anthony Supervisor, Construction Cost Section Office of Estimating.
PINOLE VALLEY HIGH SCHOOL FACILITIES SUBCOMMITTEE MEETING December 13, 2011.
With the Genesee County Road Commission By Fred Peivandi, P.E. And Ken Johnson, P.E. Local Road Funding.
Elementary School #33. Board approval in 2006 Funding 2002 Bond 2005 Bond Location Camino A Lago Meadows.
Design/Build/Financing of Privately Operated Detention Facilities Allison, Bass & Associates, LLP A.O. Watson House 402 West 12 th Street, Austin, Texas.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Eddie Choy Asst. Dir. System Contracts Introduction of System Contracts Unit Policy Changes future and past Legislative review System wide contracts Linda.
SPORT MANAGEMENT 302 (a) B. FLAHERTY Questions/Comments?? Quiz next week, Chapters 1-6 Complete Chapter 7 “Funding and the Bid Process” Chapter 8 “Constructing.
1. Review of RFP Project Goals RFP Time Line Project Schedule RFP Type Project Budget 2. Questions? 3. Tour of New Site 4. Tour of Existing Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
Pinole Valley High School (PVHS) Project Status
January 24, …a delivery method which entails a commitment by the Construction Manager to deliver the project within a Guaranteed Maximum Price (GMP).
Project Title: CONSTRUCTION OF SCIENCE & TECHNOLOGY BLDG. (Ph. 1) Approved Budget for the Contract (ABC): Php 26,102, (Ph. 1) Source of Funds:Fund.
FAMILY LIFE CENTER Building Committee Update November 23, 2014.
The Projects Side Steve Berezansky OSFC Chief of Projects.
 Electric service = 600 kilowatts  Facility demand = 560 kilowatts  Generator capacity = 180 kilowatts  Emergency generator is only capable of powering.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
MOORESTOWN TOWNSHIP MUNICIPAL COMPLEX 3/22/10 Update.
Construction Notes Amer Bata, Area Construction Manager.
2 Preliminary  Pre-Design & Design  Prior to Bid Letting  For funding allocation and bid comparison Final  Construction  Post Award  For contractor.
1 NOAA Center for Weather and Climate Prediction (NCWCP) June 17, 2005 Briefing for Dr. David A. Sampson Deputy Secretary of Commerce.
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
ESPLOST Update Savannah-Chatham County Public Schools May 7, 2008.
Pinole Valley High School (PVHS) Project Status 1 Facilities Subcommittee Meeting February 10, 2015.
Professional Engineering Procurement Services Division Solicitation No. 15-5RFP5004 Donella Drive Improvements Project Status Presented By: Kyle Gass,
HEARTLAND COMMUNITY COLLEGE COLLEGE DEVELOPMENT PLAN PHASE II PROJECT SCHEDULE August 26, 2009.
David M. Maroney, AIA/NCARB. 2 BuildingAddition RoadCourse.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
Presented By: Lisa LeBlanc, Associate Superintendent Recommendation on Valley View ES Facilities Subcommittee – January 6, 2014.
© The Concept Factory © Science Link | 2© Science Link 2013  Three calls during Results:  66 applications, companies from 8 countries.
OTC Pres: Bid & Award Phase 4 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Eryca McCartin, Office.
CIP2 DESIGN-BUILD PROJECT PRE-PROPOSAL CONFERENCE June 28, 2007.
ESPLOST Update Savannah-Chatham County Public Schools January 9, 2008.
Project Budget Review _ Control Developed by: Daniel J. Renna 3/16/20161.
Construction Management At Risk Process
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Regional Water Reclamation Facility 23-MGD Expansion Project Joe Mouawad, P.E. Senior Director.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
Hurricane Ike Recovery CITY OF GALVESTON March 26, 2015.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
Wastewater Treatment Plant No. 2 Construction Contract City Council Workshop February 9, 2016.
District of Columbia Public Schools | 1200 First Street, NE | Washington, DC | T | F | dcps.dc.gov Ron Brown Modernization.
Merritt College Proposed New Science Complex PCCD Board of Trustee Meeting May 20, 2008 Presented By Dr. Sadiq B. Ikharo, Vice Chancellor Department of.
The Intricacies of the Beginning and the End of a Project CM Leadership Manual Presented by: Todd Scholtz, LEED AP Carlos Sanchez, LEED AP BD+C.
ESPLOST Update Savannah-Chatham County Public Schools March 5, 2008.
1 EASTERN MUNICIPAL WATER DISTRICT Public Access Areas Renovation Project Debbie Hoffman, PE Civil Engineer II, Project Engineer July 1, 2015.
Savannah-Chatham County Public Schools April 2, 2008
Light Rail Transit Project
CM at Risk v. Design-Bid-Build
Pinole Valley High School (PVHS) Project Status
Pre-Construction Services
9/18/2018 Bids CONTRACTING Khamis…..
Designers’ Manual Overview and Chapter Contents
Designers’ Manual Appendix Contents
Fleet Turnover Transitioning Your Contract With a Healthy Fleet Health.
Classroom Enclosure – Phase II Bonnie Beard Agriculture Center
Design-Bid-Build (Ch. 149) vs. Construction Manager at Risk (Ch. 149A)
El Cerrito High School Stadium Project Status
Coronado Elementary School Project Status
CONVENTIONAL FACILITIES LCLS Office Space Procurement
Commission Agenda Item #2
Presentation transcript:

Pinole Valley High School (PVHS) Project Status 1 Facilities Subcommittee Meeting March 15, 2016

PVHS Anticipated Timeline Project Bid PeriodNov – Mar st AddendumDecember 7, nd AddendumDecember 23, rd AddendumJanuary 8, th AddendumFebruary 1, th AddendumFebruary 12, th AddendumFebruary 22, th AddendumMarch 4, th AddendumMarch 10, 2016 Receive Blind Bids (Target)March 15, 2016 BOE Bid Approval (Target)April 13, Facilities Subcommittee – March 8, 2016

PVHS Budget Considerations BOE Approved Project Budget$181,900,000 Completed Supporting Costs & Construction Projects($36,200,000) Remaining Phases (Budgeted): Temp Housing Demo, Sports Fields/Courts (Supporting & Hard Costs) ($18,500,000) Remaining Project Budget$127,200,000 Supporting Costs (During New Campus Construction)$20,100,000 BidderAB Base Bid (No Unit Costs)$127,377,880$137,250,000 Alternate #1 (Contractor Insurance)$2,516,122$4,241,422 Total (Base Bid + Alternate #1)$129,894,002$141,491,422 Additional Budget Required (w/o C.O.’s)$28,394,002$39,991,422 C.O. Range (3% - 7%)($ M)($4.2 – 9.9M) OCIP Costs (Not Selected)$5,040,474$5,484,576 Alternate #2 – 36 month Schedule (Not Selected)$388,574$0 3Facilities Subcommittee – March 15, 2016

PVHS New Campus – Supporting Costs Consultants Design & Bid Support Fees (Remaining) – Contracted$875,000 Services During ConstructionProjected AOR Construction Admin. & Close Out – Contracted$3,838,904 Other Consultants (Construction Admin.) – Proposed600,000 Construction Management / Inspector of Record 5,100,000 Testing & Inspection 900,000 Waterproofing Consultant (Construction Admin.)150,000 SWPPP Consultant100,000 Commissioning Consultant – Contracted 107,443 Photo-documentation – Proposed 150,000 Temporary Housing (Lease) – Contracted3,700,000 Technology1,800,000 Fixtures, Furniture, & Equipment (FF&E)2,300,000 Moving Services750,000 TOTAL (Inclusive of Design & Bid Support Remaining Fees)$20,100,000 Facilities Subcommittee – March 15, 2016

PVHS Status & Next Steps 5 Bids Received, Apparent Lowest Responsible Responsive Bidder Identified 03/15/16 Receive CM Services Proposals03/18/16 Bid Protest Period – 3 Business Days 5 Day Bid Withdrawal Period Post-bid Conferences03/21/16 – 03/25/16 BOE Bid Award04/13/16 Notice to Proceed (Target)05/02/16 Project Completion (Target)11/02/18 Facilities Subcommittee – March 15, 2016