Tim Abbott & Brenna Flaugher, CTIO Integration Meeting 1 The DECam Project Closeout, Action Items Hexapod Optical Lenses CCD Readout Filters Shutter 2008.

Slides:



Advertisements
Similar presentations
Brenna Flaugher Sept. 26, The Dark Energy Survey Camera: DECam 1.1 Management 1.2 Focal Plane Detectors 1.3 Front End Electronics 1.4 Optics 1.5.
Advertisements

1 FGS Guider CDR – April 19, 2007 © Copyright 2007 Her Majesty the Queen in Right of Canada Subject to Controlled Goods Regulations of Canada FGS Guider.
ISIM Integration & Test Mike Drury JWST-PRES
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
Cost, Schedule & Funding Closeout Jan Joint DOE/NSF CD2/3a Review 1 DOE/NSF Review of the Dark Energy Survey (DES) Project SC 6/7 Cost, Schedule.
Design the Moving and Handling Fixture for the DECAM Imager Edward Chi Fermilab November 17, 2008.
1 Progress for August 3, 2011 The boat shipment with the prime focus cage, cage cart, imager handling system etc … arrived on the mountain top this morning.
Compressor ReVamp and Fabrication PO9452. Update Revised Concept Generation Selected some concepts Scheduled Conference call with Dresser Rand Schedules.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
Cryo Capture Cavity II Progress Mike McGee April 6, 2005.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Integration and Test 14 October 2008 Martin Nordby.
Release & Deployment ITIL Version 3
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
The STAR HFT PXL system is designed to be inserted in situ. Is housed in 2 large frame aligned with rails inside Inner Detector Support. Inserted from.
Construction of the Dark Energy Camera Brenna Flaugher, DECam Project Manager CTIO Nov John Peoples (1 st DES Director ) Symmetry Magazine.
1 B. Flaugher P5 April 2006 The Dark Energy Survey From Scientific Goals to Science Quality Data Brenna Flaugher Fermilab April 2006 P5 Meeting.
Magellan F/5 System Status A.Szentgyorgyi/SAO/30 Apr 2005.
DECam Logbook CTIO uses an electronic logbook for DECam – Proper Use will result in better procedures.
Electrical and Optical Cables Installation at P5 What When How H. Breuker
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
7/26/2006 Wyatt Merritt 1 DECam Preparations for Critical Decision 2/3a Preparations for CD2 Preparations for CD3a DECam MOUs.
Telescope Integration and Tests Tuesday Afternoon.
Brenna Flaugher DES presentation to the Fermilab PAC Nov. 12, 2004 Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 1 DES Technical Progress, Cost and.
3.1 Optomechanical systems (1) Scientific and engineering resources are available to carry out the optomechanical work on DECam. The highly distributed.
AP-1 5. Project Management. AP-2 Software Failure Software fails at a significant rate What is failure? Not delivering it on time is an estimation failure.
7/26/2006 Wyatt Merritt 1 DECam CD1 Documentation DOE Critical Decision Process Documentation Requirements.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
3.1.1 Optics, Optical Corrector, Mechanical Systems M. Johns, C. Claver.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
Oct 17, 2001SALT PFIS Preliminary Design Review1 Southern African Large Telescope Prime Focus Imaging Spectrograph Mechanical Mechanism Design Michael.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
1 DECam in Chile Intro to Dark Energy Survey & DECam Project Status of arrivals in Chile Instrument checkout in Chile Schedule for first light.
Brenna Flaugher October 30, 2007 Preliminary Directors Review 1 Outline This talk will describe progress on DECam since the joint NSF/DOE CD-1 review in.
Brenna Flaugher July 6, DECam Project Summary Outline –WBS 1.1 Management –WBS 1.2 Focal Plan Detectors –WBS 1.3 Front End Electronics –WBS 1.4.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
Brenna Flaugher for the DES Collaboration; DPF Meeting August 27, 2004 Riverside,CA Fermilab, U Illinois, U Chicago, LBNL, CTIO/NOAO 1 Dark Energy and.
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
Brenna Flaugher, PMG, April 6, 2007 DECam Funding Need Profile (Dec 06) (then yr $, Overhead included) This gave a technically driven schedule resulting.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
Thomas Jefferson National Accelerator Facility Page 1 FNAL/JLab weekly meeting, April 23, 2014 Agenda  Path Forward  Status at FNAL  Status at JLab.
SPHENIX MECHANICAL D. Lynch & R. Ruggiero July 31, /29/2014sPHENIX Mechanical Design.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
1 Progress for July 18, 2011 Morning Safety Meeting was held in the Control Room today. Tom & Herman worked with Jim Hughes (remotely) and made a temporary.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
SC2004 Exhibit Status. Proposed Schedule Exhibit ships from SLAC 7/22 Arrive Fermilab 7/29 Fermilab Quantum Universe display opens 10/1 Ship date to SC2004.
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
Adaptive Software Development Process Framework. Version / 21 / 2001Page Project Initiation 2.0 Adaptive Cycle Planning 5.0 Final Q/A and.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
1 Progress for July 19, 2011 Preparations for Fill. –4 protection valves were attached: 2 on Z-shaped tubes, 2 on the tank –Herman’s new CTIO engineering.
DECam in Overview Alistair Walker Version 3 December Ver 4 Updates Jan
Commissioning Alistair Walker NOAO/CTIO 9/30/ DES Collaboration Meeting October
S A Griffiths CM42 June 2015 Electrical & Control.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
Technical resources schedule
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
Agenda ComCam planning and scheduling (James & Jacques) CCS & CCS-TCS Interface (Tony) Software to use ComCam Software to get data out of ComCam (Mike)
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Alistair Walker Version 3 December
Mechanics: (Tim).
DECam Filter/Shutter Installation and Filters Installation
COSMOS Status David Sprayberry, Sean Points & Jay Elias
(Preliminary) WIYN 0.9 Meter Collimation Procedure
Electron Beam Systems ETC and Methodology
Limited Streamer Tube Project Summary
Presentation transcript:

Tim Abbott & Brenna Flaugher, CTIO Integration Meeting 1 The DECam Project Closeout, Action Items Hexapod Optical Lenses CCD Readout Filters Shutter 2008 Nov 20

Tim Abbott & Brenna Flaugher, CTIO Integration Meeting 2 Action Items 1.CTIO to generate plan for training for CTIO staff – who should be trained, what should they be trained on, and when are they available OPEN –Telescope simulator –Reassembly at CTIO –When stuff is packed in crates at UCL and Fermilab 2.Fermilab: Develop full list of pre-shipping tests and assumptions. OPEN. 3.Fermilab needs drawings of the NW service platform and F/8 handling fixtures. NOT Complete. –Fermilab to request from Tucson again with support from CTIO 2008 Nov 20

Tim Abbott & Brenna Flaugher, CTIO Integration Meeting 3 Action Items 4.Decide if extra size of shipping container/rotation box for imager is in fact a problem. OPEN- to be checked again when shipping container are designed 5.Fermilab and CTIO to agree on final specifications for clean room and Coudé room layout, including the cranes/gantries in both areas and the cabling/cooling plan. OPEN – When does CTIO make the decision on cleanroom layout? 6.DECam team to provide a complete list of equipment required in the Coudé room for DECam assembly and testing OPEN 2008 Nov 20

Tim Abbott & Brenna Flaugher, CTIO Integration Meeting 4 Action Items 7.CTIO & DECam team to perform ODH analysis & emergency procedures if cryo system fails.. OPEN 8.Specify needs for cube/tee dewars at CTIO; how many, where, funding, maintainer, readout systems, etc. OPEN 9.Determine setup time estimate for SISPI at CTIO. Determine whether shipping + setup for SISPI < shipping + unpacking for imager. If not, consider further doubling of hardware as mitigating schedule risk (currently only enough doubling to check TCS/DTS interfaces). OPEN 2008 Nov 20

Tim Abbott & Brenna Flaugher, CTIO Integration Meeting 5 Action Items 7.Send layout of optical tests required at CTIO. DONE 11/18/08, –David and Roberto to stay in contact. 8.Develop the list of different mass configurations for which telescope balance will need to be maintained; use this to plan the various counterweights which will be required. OPEN 9.Make a video of Ken Schultz installing a DECam science package in the MCCDTV, using the proposed DECam installation procedure and provide to CTIO. DONE - will repeat with final design 2008 Nov 20

Tim Abbott & Brenna Flaugher, CTIO Integration Meeting 6 Action Items 10.Sign off on conceptual design of F/8 handling CLOSED ANL will proceed with detail design of concept as presented at this meeting –Remaining open issues: a)Interference with existing platform – resolved? b)People access c)How to hold the inner ring at 125 deg. flip position d)Counterweight retraction is horizontal, not along the optical axis (4-7 deg diff), requiring compliance. e)Compliance on engaging kinematic mount. (Horizontal wraps - see cable section). f)CTIO to figure out how to reverse flip direction Nov 20

Tim Abbott & Brenna Flaugher, CTIO Integration Meeting 7 Action Items 11.Cables: OPEN a)Steve, Dave and Gale to determine if the cables be continuous from the Coude Room control racks and computers to the PF cage or should they have breaks to make installation easier (possible?) If so where? b)CTIO to document how will the cables be handled. Agree with Fermilab on a date for a review to determine the cables will not be damaged during the installation and how they will be tested after installation. c)CTIO to determine which if any can be installed and tested Before the shutdown for DECam installation? 2008 Nov 20

Tim Abbott & Brenna Flaugher, CTIO Integration Meeting 8 Action Items 11.Cables continued: OPEN d)CTIO to specify all cables that will go into cage for F/8 and any monitoring that is not part of DECam. Fermilab (Steve) is the keeper of the complete list of all cables going to the PF cage. OPEN e)Fermilab and CTIO to agree on how 3-phase is delivered to cage when in Coudé room and at top end CLOSED some work to be done in April 2009 shutdown, Gale & Steve have it sorted out. Will be discussed at monthly installation meetings. (Gale needs consumption estimates.) f)CTIO to specify all cables that will go into cage for F/8 and any monitoring that is not part of DECam. Fermilab (Steve) is the keeper of the complete list of all cables going to the cage. OPEN 2008 Nov 20

Tim Abbott & Brenna Flaugher, CTIO Integration Meeting 9 Action Items 12.Cooling Tubes: Fermilab and CTIO to agree on cooling tube route and where (if anywhere) will be hard pipe. OPEN –Move LN2 path to west side of telescope, design wrap & protection for DEC encoders. 13.Fermilab to design horizontal wrap for partial flip. OPEN 14.CTIO and DECam team to determine full list of what can be installed and tested BEFORE DECam arrives at CTIO in Dec OPEN 2008 Nov 20

Tim Abbott & Brenna Flaugher, CTIO Integration Meeting 10 Action Items 15.Barrel handling –Fermilab to determine if we need two sets of fixtures: OPEN - One for Fermilab and the Telescope Simulator test, one for UCL 16.Fermilab to determine assembly plan for cage, hexapod and barrel OPEN 17.CTIO to define plan for installation of DECam on the Blanco and keep DECam informed during the generation of the plans – OPEN Set-up regular meetings every four weeks to discuss progress –CTIO to decide what is needed - who will design and build required gear (e.g. handling cart, lifting fixture)? –Agree on a date with Fermilab for a design review –Agree on alignment reference surfaces 2008 Nov 20

Tim Abbott & Brenna Flaugher, CTIO Integration Meeting 11 Action Items 18.Scaffolding for work at zenith when the cage is being installed on the spiders. –CTIO to design & build scaffolding –What, if anything, should be replicated at the telescope simulator? OPEN 19.CTIO and Fermilab to agree on conceptual plan for removing and installing the imager at the NW station OPEN 20.CTIO to define measurements required to align cage to telescope and specify (if needed) fiducials to be added to PF cage OPEN – must be complete SOON before completion of cage DESIGN. April 09 cage fabrication begins Nov 20

Tim Abbott & Brenna Flaugher, CTIO Integration Meeting 12 Action Items 21.Develop a plan for standby mode for DECam when F/8 is being used. Closed 11/18/08: everything should stay on. 22.CTIO to compare PF cage drawings to cage currently on the Blanco and provide information to Fermilab on where attachments to the spiders should be in the DECam Prime Focus cage. OPEN 23.Filter handling – produce a conceptual design for filter changing & operational plan for removal/reinstallation of FCM. OPEN Nov 20

Tim Abbott & Brenna Flaugher, CTIO Integration Meeting 13 DRAFT Agenda for Dec. 10 Integration meeting Brooke - Clean Room and Coude room Update –Schedule for building it, physical layout, cables, services… Gale and Steve: –update on electrical power distribution for DECam and plans for electrical shutdown during the April 09 shutdown Andy, Steve, Gale: Confirmation of cooling and cable routes CTIO: Status of plans for installation of DECam on the Blanco –Status of plans for alignment of DECam to primary mirror –Update on scaffolding and access ideas at Zenith for DECam installation. –What, if anything, should be replicated at the telescope simulator? –What could be installed before DECam arrives –Fermilab: list of different mass configurations for which telescope balance will need to be maintained. CTIO will use this to plan the various counterweights which will be required. Status of plans for training CTIO staff –when do we need to determine who should be trained on which parts of the project Status of detail drawing collection on the NW station. Topics for future meetings: –Barrel handling and cage assembly in the Coude room –Update on imager installation plans at NW station –Filter changer and filter installation plans 2008 Nov 20

Tim Abbott & Brenna Flaugher, CTIO Integration Meeting 14 Extras Sparing and maintenance –Monsoon, RS to analyze failure scenario & sparing needs CTIO must find out what NEWFIRM needs by way of cabling & cryo. Collaborate on cryo feed & cable design & fab Collaborate on alignment mask design 2008 Nov 20

Andy says… Aw, Crap…. Tim Abbott & Brenna Flaugher, CTIO Integration Meeting Nov 20