Agenda ComCam Team Brief ComCam Description Review division of responsibilities between Camera and T&S Review Schedule Camera Project T&S Project Interfaces Message box example for short highlighted messages.

3 ComCam Description The LSST Commissioning Camera (ComCam) is a single raft 9-CCD instrument that will be used during the Project’s 6-month Early Integration and Test period

4 Message box example for short highlighted messages.
ComCam Team Camera Kevin Reil LSST Camera Commissioning lead Travis Lange Lead engineer on the Camera I&T team Scott Newbry Mechanical engineer on the Camera I&T team Justine Haupt Mechanical engineer from BNL Tony Johnson Manager of the Camera Control System subsystem Mike Huffer Manager of the Camera DAQ Margaux Lopez T&S James Howard ComCam CAM, Mechanical engineer Sandrine Thomas T&S Subsystem Scientist Gary Poczulp Optical Shop Supervisor Ming Liang Optical Engineer Paul Lotz Software Engineer Te-Wei Tsai Oliver Wiecha Electrical Engineer Message box example for short highlighted messages.

5 ComCam Responsibilities
Telescope & Site Camera Commissioning ComCam Integrating Structure Utility Box Refrigeration Pathfinder Volume Message box example for short highlighted messages. Corrector Optics, Shutter and Filter Changer Cryostat Stage Assy

6 ComCam Responsibilities
Telescope & Site Camera Commissioning ComCam Integrating Structure Front End Assy L1-L2 Assy Filter Changer Shutter Alignment Fiducials Cryostat Raft Tower Cryotel Coolers Ion Pump Turbo Pump Roughing Pump Vacuum Quality Monitor L3 & Cryostat Front End Flange Utility Box Filter Control HCU Raft Power OTM Power Utility Box Thermal Control Ion Pump Pwr Turbo Pump Controller Refrigeration HCU HCU (FT) AC → DC Control Network Switch (Fiber→ Eth) Dynalene Coolant Distribution MCM Shutter Control & HCU Filter Control & Refrigeration Pathfinder Test Dewar Heat Exchanger (x2) Thermal Load (x2) L3 & Cryostat Front End Flange Message box example for short highlighted messages. Filter Control

7 ComCam Responsibilities - Software
Telescope & Site Camera AOS w/ ComCam WFS Guiding Camera Control System CCS-Shutter CCS-Filter Changer CCS-Raft CCS-Telemetry CCS-MCM-OCS Message box example for short highlighted messages.

8 Message box example for short highlighted messages.
ComCam Schedule Key Dates/Milestones schedules Ship Shutter to SLAC: 6/14/ √ Ship Filter Changer and Controller to SLAC: 2/1/2018 Ship L3 cell to SLAC: 7/1/2018 Preship review from SLAC to Tucson Ship Cryostat, Utility Box, support equipment to Tucson: 2/4/2019 (earlier if possible) CCS and DAQ installed in Tucson (?) All software ready: 2/4/2019 (?) Ship Cryostat to Tucson: 2/5/2019 I&T in Tucson 2/5/2019-4/28/2019 Preship review: ComCam to Chile: 4/29/2019 Ship ComCam to Chile: 5/4/2019 ComCam ready for onsite tests: 7/29/2019 Message box example for short highlighted messages.

9 I&T in Tucson: Planning
Develop integration plan Develop test plan Ensure appropriate knowledge transfer between SLAC & Telescope & Site

10 I&T in Tucson: Preparation
Procure Lab Procure space in computer room Procure required utilities (comms, power, glycol) Test utilities Install DAQ in computer room Develop handling plan Develop power and grounding plan Develop safety plan Review safety, handling, power and ground plans Design handling & test fixtures Acquire/build handling & test fixtures Lab readiness review

11 Integration & Test Set-up SLAC equipment in lab Receive cryostat Unpack and setup cryostat in lab Post-shipment cryostat testing Integrate Cryostat with L1-L2, L3, Filter Changer, and Shutter Integrate filter changer controller with Utility Box Comprehensive test (scope?) Integrate ComCam and Utility Box with ComCam Integrating Structure (possibly in flex rig room)

12 Packing and Shipping Determine level of disassembly necessary Develop packing plan Develop shipping plan Procure packaging Disassemble Pack Ship

13 Message box example for short highlighted messages.
ComCam Schedule Camera Project ComCam Schedule T&S Project ComCam Schedule Message box example for short highlighted messages.

14 Interfaces

15 Interface and Collaboration Diagram
ICDs between components are listed: LSE-67: ICD between TCS and CCS LSE-68: Camera Data Acquisition Interface LSE-69: ICD between CCS and DM LSE-71: ICD between OCS and CCS LSE-72: ICD between OCS and DM LSE-73: ICD between TCS and OCS LSE-75: ICD between TCS and DM LSE-73 LSE-71 LSE-75 LSE-72 LSE-67 LSE-75 LSE-68 LSE-69

16 Backup Slides

17 Questions Reviews: What reviews do we need? Should we have a dedicated annual ComCam All Hands Meeting? Who is in charge of writing the comprehensive test plan in Tucson? Who will be in Tucson to perform the ComCam tests?

18 Ownership <-> CCIS and cable wrap

19 Utilities

20 What interface details are needed for the DOE Comcam PDR?

21 Integration and Test in Tucson

22 Integration and Test in Tucson

23 Mounted to the Integrating Structure

24 Section View

25 Mounted to the Integrating Structure

26 ComCam Shutter -Received from Bonn Shutter June 2017 -Semi-custom moving slit type with 236 mm aperture -Minimum exposure < 1ms -Programmable blade trajectory

27 Detector Raft & FOV Field of View Single raft

28 ComCam Optical Design


Download ppt "ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15."

Similar presentations


Ads by Google