Preliminary Gold & Northwest Corridors Service Plan 1.

Slides:



Advertisements
Similar presentations
County of Fairfax, Virginia Department of Transportation Fairfax Connector Bus Service Plans HOT Lanes and Dulles Rail Phase I Fairfax County Board of.
Advertisements

National Utility Contractors Association of Colorado Wings Over the Rockies Air and Space Museum March 19, 2015.
RTD FasTracks Overview ColoRail Winter Meeting
Northwest Rail Update Nadine Lee, Northwest Rail Project Manager Regional Transportation District March 21, 2012.
Colorado Rail Passenger Association Spring Meeting June 1, 2013.
Chicago Transit AuthorityJune, 2007 Chicago Transit Authority Regional South Metro Transportation Summit June 16, 2007 Matteson, Illinois.
I-35W and 46 th Street Station Concept Service Plan Planning for the Future – BRT 46 th St Station Concept Plan Public Input.
Short Range Transit Improvement Plan CITY OF HIGH POINT Sounding Board/Steering Committee Meeting Service Recommendations January 13, 2015.
SR 50/UCF Connector Alternatives Analysis Orange County Board of County Commissioners January 13, 2015.
Twin Cities Case Study: Northstar Corridor. ●By 2030, region expected to grow by nearly 1 million, with 91% to 95% of new growth forecast to be located.
Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study Steering Committee Meeting Presented to Montgomery County Department.
I-35W and 46 th Street Station Concept Service Plan and Construction John Dillery & Mac Sweidan Kingfield Neighborhood Association June 2010.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
MTF Rail Development Forum
1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development.
Short Range Transit Improvement Plan CITY OF HIGHPOINT Sounding Board Meeting Service Recommendations September 9, 2014.
Functional Classification Maranda Obray, Transportation Planner Idaho Transportation Department.
North Metro Rail Line FasTracks Citizens Advisory Committee September 18, 2013.
I-35W and 46 th Street Station Concept Service Plan Planning for the Future – BRT 46 th St Station Concept Plan Public Input.
1 Welcome! West Valley-Taylorsville Transit Corridor Draft Environmental Impact Statement Public Open House/Hearing July 19, 2006.
FasTracks Moving Forward: Regional Transportation Plan (RTP) Amendment Staff Recommendation Phillip A. Washington and Team August 7, 2012.
Helena Inclusive Transit Planning Grant Round 2 Service Improvement Planning -Recommended Local Transit Service Improvement October 21, 2014 Presented.
1 Presentation to TAC June 17, 2009 Overview of Rapid Bus Measures and Effectiveness And Case Studies.
COTA Major Initiatives Ohio Planning Conference July 16, 2014.
Polk Transportation Planning Organization 2035 Mobility Vision Plan June 2010 Steering Committee - January 28, 2010 Polk Transportation Planning Organization.
North Metro Rail Line Request for Proposals (RFP) Commerce City Council August 19, 2013.
Public Transportation Committee Meeting September 26, 2013.
South/West Corridor Transit Improvements PRIMO & ENHANCED AMENITIES PLANNING PHASE September 9, 2014 Planning & Project Development Committee August 11,
I-35W and 46 th Street Final Service Restructuring Plan.
UPDATING TRANSIT Lake County, Illinois Lake Co. is changing fast Learn how we modified the transit network to meet changing demand Seth Morgan, Senior.
Citizens Advisory Committee Quarterly Update Bill Van Meter, Assistant General Manager, Planning September 19, 2012.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 16, 2009.
Jacksboro Highway Walmart Supercenter Opening Fall 2014.
Streetcar Feasibility Study – San Antonio Alamo Plaza.
OPEN HOUSE #4 JUNE AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment.
INTERREGIONAL EXPRESS BUS SERVICE Presentation to NATA – May 22, 2014.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 15, 2009.
1 AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment cards PRESENTATION 6:30 PM.
00 Metropolitan Transit System Transit Serving Point Loma September 23, 2008.
Downtown Shuttle (D-Link) Interlocal Agreement Transportation and Trinity River Project Committee October 26, 2015.
County of Fairfax, Virginia Fairfax County Comprehensive Transit Plan and Transit Development Plan Board Transportation Committee December 1, 2015 Randy.
I-15 Express Lanes Project January 2012 I-15 Express Lanes Project January 2012.
US 36 Commuting Solutions Northwest Rail Westminster Segment/Eagle P3 Oct. 14, 2014.
Transit Choices BaltimoreLink Ad-hoc Committee Meeting January 12, 2016.
Gastonia Transit Expansion Study City Council/Planning Commission Joint Transportation Workshop September 13, 2007.
Board of Supervisors Transportation Committee June 25, 2013 (6/18 presentation draft) Proposed High Quality Transit Network Concept 1.
Regional Transit System Level of Service FY 2017 Growth Management Jeffrey Hays, AICP.
1 Update on Transit in West Kelowna District of West Kelowna - November 12, 2013 Matthew Boyd – Senior Transit Planner Steve Harvard – Senior Regional.
Service Guidelines and Standards Capital Metropolitan Transportation Authority Board of Directors Meeting September 2015 capmetro.org |1.
Service Development Process 1. Our mission: To meet our constituents’ present and future public transit needs by offering safe, clean, reliable, courteous,
Public Transportation Committee Meeting January 21, 2014.
BUS RAPID TRANSIT (BRT) PLANNING EFFORTS STATUS 1 Planning & Development Committee April 5, 2016.
1 Eagle P3 Project Update FasTracks Monitoring Committee September 1, 2015.
Southeast Rail Extension Update RTD Board of Directors FasTracks Monitoring Committee March 3, 2015.
Multi Agency Exchange May 16, 2017.
I-66 OUTSIDE THE BELTWAY Shrevecrest HOA JUNE 21, Susan Shaw, P. E
Northwest Area Mobility Study FasTracks Monitoring Committee
Comprehensive Route Network Analysis
Four Winds Condominium Association August 2, 2017
East & I-225 Rail Corridors Preliminary Service Plan
Operations and Service Concept
US 36 BRT/ Flatiron Flyer Proposed Service Plan
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
The Oakton Condominium Association September 12, 2017
Free MetroRide Travel Time and Reliability Improvements
Propose March 2018 Service Improvements
FY 2019 Recommended Wake Transit Work Plan
D Line Project Overview
Draft Fiscal Year Bus Service Plan
HRT Workshop: Transit Strategic Plan and Aug-Dec working items
Presentation transcript:

Preliminary Gold & Northwest Corridors Service Plan 1

EXISTING SERVICES 2

Gold Corridor Bus Routes Service ClassRoutes CBD Local Urban Local Suburban Local Express55X-72X Service ClassRoutes Urban Local31 Suburban Local Express31X-40X-80X-86X Northwest Corridor Bus Routes

Existing Conditions - Productivity

Existing Conditions – Service Frequency Gold Line Corridor peak frequency for local service ranges from 15 to 30 minutes The Gold Line corridor is also served by two Express routes, which provide 15 to 30 minute frequencies during the peak periods Midday and Saturday service frequency is most commonly 30 minutes Sunday/Holiday service frequency is most commonly offered every 60 minutes The Northwest Corridor is served predominately by Suburban Local routes and Express routes. Express routes operating on US Highway 36 and Interstate 25 provide peak-only service to and from downtown Denver Suburban Local routes in this corridor typically operate at frequencies of 30 or 60 minutes throughout the day.

Existing Conditions - Service Span CBD Local and Urban Local routes typically begin weekday service between 4:00 AM to 5:00 AM, however, end of service varies greatly, ranging from 8:00 PM to 2:00 AM. Suburban Local routes typically begin weekday service between 5:00 AM and 6:00 AM with service ending between 7:00 PM and 11:00 PM. Express routes provide peak-only service typically between 6:00 AM and 9:00 AM and again at 3:00 PM to 7:00 PM to meet the demand of commuters traveling to and from large employment centers.

PROPOSED SERVICE PLAN 9

G-Line Alignment 11.2-mile commuter rail line 8 stations including DUS travel time between DUS and the Wheat Ridge/Ward terminal station will be approximately 25 minutes

G – Line Planned Operations

B Line Alignment 6.2-mile segment from DUS to south Westminster Two stations including Denver Union Station and Westminster/71st Ave Estimated travel time between Westminster and Downtown is approximately 11 minutes

B-Line Planned Operations

Network Design Principles Leverage the Rail Investment –Fast and frequent rail service –Realignment of bus service to serve new rail stations –Eliminate duplicative bus service Strengthen Bus Service (levels and coverage) –Reinvest bus hours saved Increased frequencies, service span and area coverage Route Spacing and Prioritization –Consolidate parallel bus service and increase service levels 14

Service Plan Recommended Network

Routes replaced by Gold Line Route 55X – Olde Town Arvada Express Route 72X - Ward Road Express Note: no route services are replaced by the B –Line

New Bus Routes Route 53 – replaces Route 51 north of US 36 & Sheridan Station Route 55 – new service proposed to operate between Olde Town Arvada Station and Arvada Ridge Station Route 95 – replaces Route 31 branch between Westminster (Rail) Station and US36 & Sheridan Station Route 99 – replaces alignment previously served by Route 100 south of Federal Center Station

Gold and Northwest Resource Impacts

Timeline Preliminary Gold & Northwest Corridors Service Plan – June 29, 2015 Stakeholder meetings to review preliminary service plan – June 29 – July 24, 2015 Revise Proposed Gold & Northwest Corridors Service Plan – August 4, 2015 Proposed Gold & Northwest Corridors Service Plan to RTD Board Operations Committee – August 11, 2015 Conduct public meetings on Proposed Gold & Northwest Corridors Service Plan – October 2015 Revise Proposed Service Plan based on input – November 30, 2015 Board approval of Final Gold & Northwest Corridors Service Plan – December 15, 2015 Implement service plan – Summer 2016 (Northwest Line) and Fall 2016 (Gold Line) 19