Jorgen Christiansen, CERN PH-ESE 1.  EPIX ITN proposal did not get requested EU funding ◦ CERN based proposals did very bad this time. ◦ I better not.

Slides:



Advertisements
Similar presentations
Phase 2 pixel challenges  ATLAS and CMS phase 2 pixel upgrades very challenging  Very high particle rates: 500MHz/cm 2  Hit rates: 1-2 GHz/cm 2 (factor.
Advertisements

Report on INFN activities CHIPIX65 - project
Token Bit Manager for the CMS Pixel Readout
Chip Developments of the Bonn Group Hans Krüger, Bonn University -1-
Jorgen Christiansen on behalf of RD53
Status of 65nm foundry access for Aida June 2013 A. Marchioro CERN/PH-ESE.
ATLAS/CMS/LCD RD53 collaboration: Pixel readout integrated circuits for extreme rate and radiation LHCC status and outlook report June Jorgen Christiansen.
R. Kluit Electronics Department Nikhef, Amsterdam. Integrated Circuit Design.
The Preparatory Phase Proposal a first draft to be discussed.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Michał Bochenek Work Package 3: On-Detector Power.
ATLAS – CMS RD collaboration: Pixel readout integrated circuits for extreme rate and radiation The “pixel 65” collaboration 1.
Phase-1 Padring. i PHC Phase 1 Padring 2 03/04/2008 Padring Overview µm Several Blocs :  JTAG pads  Digital Control.
Pierpaolo Valerio.  CLICpix is a hybrid pixel detector to be used as the CLIC vertex detector  Main features: ◦ small pixel pitch (25 μm), ◦ Simultaneous.
EUDET Report - MICELEC Activities Design Tools Status.
CHIPIX65/RD53 collaboration
TALENT Status and Future 16/07/14H.Pernegger, M.Capeans1.
Development of DC-DC converter ASICs S.Michelis 1,3, B.Allongue 1, G.Blanchot 1, F.Faccio 1, C.Fuentes 1,2, S.Orlandi 1, S.Saggini 4 1 CERN – PH-ESE 2.
FF-LYNX (*): Fast and Flexible protocols and interfaces for data transmission and distribution of clock, trigger and control signals (*) project funded.
A.Marchioro - CERN/PH1 Accessing 130 nm CMOS Tech for ILC (Public Version) Oct 2006, Munich A. Marchioro CERN, Div. PH 1211 Geneva 23, Switzerland.
Work Package 3 On-detector Power Management Schemes ESR Michal Bochenek ACEOLE Twelve Month Meeting 1st October 2009 WPL Jan Kaplon.
Background Physicist in Particle Physics. Data Acquisition and Triggering systems. Specialising in Embedded and Real-Time Software. Since 2000 Project.
Advanced Semiconductor Technologies for SLHC A. Marchioro / PH-ESE.
Common ATLAS/CMS Electronics Workshop March, 2007 W. Dabrowski Atlas ABCNext/SiGe W. Dabrowski Faculty of Physics and Applied Computer Science AGH.
Jorgen Christiansen, CERN PH-ESE 1.  Spokes persons and Institute chair elected ◦ SP’s: ATLAS: Maurice Garcia-Sciveres, LBNL CMS: Jorgen Christiansen,
ASIC technology support and foundry services at CERN
AMS HVCMOS status Raimon Casanova Mohr 14/05/2015.
M. Letheren, LECC 1 June 2001; Status of RD49 and COTS; objectives of one day review1 Status of RD49 and COTS and objectives of a one-day review RD49 -
Valerio Re, Massimo Manghisoni Università di Bergamo and INFN, Pavia, Italy Jim Hoff, Abderrezak Mekkaoui, Raymond Yarema Fermi National Accelerator Laboratory.
RD53 Status Report – July 2014 L. Demaria - Report on RD53 - CMSTK week
RD53 IP WG 1 Jorgen Christiansen / PH-ESE. IP WG agenda General Issues IP block matrix (no recent changes) General schedule Specifications of IP blocks.
Common electronics projects-solutions across experiments and sub-systems
Development of Pixel Phase 2 chip. Goals New Pixel Chip needed to go beyond the Phase 1 baseline chip – Should be the solution for Phase 2 pixel – Should.
INFN Activities on Pixel Phase 2 Electronics L. Demaria on behalf of INFN institutes: Bari, Padova, Pavia/Bergamo, Perugia, Pisa, Torino 1/28/2014 L.Demaria:
65 nm technology for HEP: status and perspectives Pierpaolo Valerio, CERN on behalf of the RD53 collaboration.
Microelectronics User Group Meeting TWEPP 2013, Perugia, IT 26/9/2013.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Links from experiments to DAQ systems Jorgen Christiansen PH-ESE 1.
Motivation for 65nm CMOS technology
Round Table discussion We prepared single slides covering –Power –Control/links –Tracker Architectures –Technologies –Trigger/DAQ –Design Libraries –Frameworks.
ASIC Building Blocks for Tracker Upgrade A. Marchioro / CERN-PH-ESE October, 2009.
WP3 Microelectronics and interconnection technology
Electronics Preparatory Group 6 June Events which happened  Meeting of all the conveners of working groups 
May 2007DC-DC --- US ATLAS Upgrade R&D --- Garcia-Sciveres1 DC-DC converter R&D US ATLAS Upgrade UCSC May 2007.
Ken Wyllie, CERN Tracker ASIC, 5th July Overview of LHCb Upgrade Electronics Thanks for the invitation to Krakow!
Microelectronics User Group Meeting TWEPP 2015, Lisbon, Portugal 1/10/2015.
Standard electronics for CLIC module. Sébastien Vilalte CTC
MUX-2010 DISCUSSION : W HAT DO WE NEED NEXT IN HEP.
Jorgen Christiansen, CERN PH-ESE 1.  Finally officially part of CERN grey book: Recognized experiments  Spokes persons and Institute chair elected 
Microelectronics for HEP A. Marchioro / CERN-PH-ESE.
RD53 1.  Full/large demonstrator chip submission ◦ When: 2016 A.Early 2016: If chip must have been fully demonstrated in test beams for TDRs to be made.
LPNHE - Serial links for Control in 65nm CMOS technology - 65nm CMOS - Higher density, less material, less power - Enhanced radiation hardness regular.
Elia Conti on behalf of the RD53 Collaboration RD53: status and main activities for 2016 ACES 2016 – Fifth Common ATLAS CMS Workshop for LHC Upgrades –
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 ASIC Building Blocks for SLHC ACEOLE Mid Term.
An·ec·dote /ˈanikˌdōt/ Noun A short and amusing or interesting story about a real incident or person LBL - May 31,2013Support for uT at CERN - A. Marchioro1.
Verification Environment for a Simple Pixel Chip Model Pixel Phase 2 Electronics Meeting during TK Week – E. Conti *, P. Placidi *, S. Marconi.
RD53 status and plans. Pixel readout integrated circuits for extreme rate and radiation 4th LHCC status report Jorgen Christiansen and Maurice Garcia-Sciveres.
Possible contribution of Pisa on pixel electronics R&D
The Silicon-on-Sapphire Technology:
Design of the 64-channel ASIC: status
FF-LYNX (*): Fast and Flexible Electrical Links for Data Acquisition and Distribution of timing, trigger and control signals in future High Energy Physics.
Meeting at CERN March 2011.
WP microelectronics and interconnections
Access to 65nm Technology through CERN
Peripheral IP blocks per chip “Superstrip”
Valerio Re (INFN-Pavia) on behalf of the RD53 collaboratios
3D interconnection in the DevDET FP7 proposal
DARE180U Platform Improvements in Release 5.6
Work Package 5 IC Technologies
Perugia SuperB Workshop June 16-19, 2009
Presentation transcript:

Jorgen Christiansen, CERN PH-ESE 1

 EPIX ITN proposal did not get requested EU funding ◦ CERN based proposals did very bad this time. ◦ I better not comment on the reviewer comments ◦ We “lost” funding for ~8 PHD students for ATLAS/CMS phase 2 pixels.  New collaborators/ contributers ◦ Bari: We will visit Bari in ~2weeks time ◦ Bergamo: Shows first signs of interest (superB cancelled) ◦ Desy ?. ◦ PSI ? (obviously 200% busy with Phase1) ◦ Other ?  65nm tech. ◦ TSMC – IMEC formally chosen for CERN frame contract (5 year contract) ◦ Development of design kit/flow already started  Subcontracted to Cadence – Similar to 130nm design kit  First version to be tested by CERN before summer ◦ Fine details of contract & NDA in negotiation. ◦ Extended radiation tests in the planning  Modifications to CERN X-ray machine enables to get to ~1Grad in a ~week  E.g. new ~1Grad results from CPPM in the pipeline.  Pixel phase 2 RD collaboration ◦ Rad tolerant IP’s to be subcontracted (by CERN to IP companies):  SRAM generator  Slow ADC  CMOS IO pads (with core transistors because of radiation tolerance)  PLL  Bandgap  These may not be compliant with 1GRad/10 16 neu/cm 2 ! ( others: ~100Mrad) 2

 Formal CMS support from tracker. ◦ Focussed on Phase 2.  ATLAS: Formal support coming, Informal support clearly there.  First draft version of RD collaboration document end this week. ◦ ~20 pages ◦ 6 ATLAS institutes, 6 CMS institutes, 1 CLIC (CERN) ◦ 100% hybrid pixel chips in 65nm ◦ Institute board ◦ Spokesperson(s) ◦ Work packages with coordinators  Discussion meeting ~end next week ◦ Document ◦ Work packages ◦ Collaborators from each institute ◦ Etc.  Final version ~June 1 st.  LHCC presentation June 12/13  First IB meeting during/after summer ◦ Spokespersons, work package coordinators, “detailed” work program ◦ MOU:  Conditions for sharing (known to be non trivial)  Common fund ? (no)  Etc.  Next (first formal) RD collaboration workshop this autumn 3

4 WP165nm technology and radiation hardness Coordinated Test and qualification for 1Grad TID and10 16 neu/cm 2 Extensive radiation tests and report. Transistor simulation model after radiation Expertise on radiation effects in 65nm Other ? WP2Design methodology for large scale mixed signal Pixel ASIC Integration of analog in large digital design Design and verification methodology for very large chips. Design methodology for low power design/synthesis. Clock distribution and optimization. Other ? WP3Pixel architecture optimization and simulation/verification platform System Verilog simulation and Verification framework Optimization of global architecture/pixel regions/pixel cells WP4Readout and Control interface Definition and standardization of readout and control interfaces (e.g use of LPGBT) Definition of control and monitoring functions Implementation of readout and control interfaces in EOC. Include safety system and features for this ? (independent projects ?) Other ?. WP5Analog pixel front-end with charge digitization? (make part of building blocks WP ?) Define detailed requirements to analog front-end and digitization Evaluate different approaches Make analog front-end block(s) available to collaboration

WP665nm radiation hard building blocks Definition of required building blocks: PLL, references,, Distribute design work Coordinate implementation and test/verification work Make cells available to collaboration WP7Power distribution/conversion/conditioning? (part of building blocks WP ?) Define and evaluate different power approaches: DC/DC & serial power Coordinate implementation and test/verification of power blocks Make power blocks available to collaboration Other ? WP8Pixel system/chip specification and requirements? (General RD collaboration ?) Define general requirements to pixel system/ASIC. Other ?. WP9Trigger contribution and impact on system/ASIC ? (global RD collaboration ? or part of architecture optimization WP ?) Evaluate of pixel contributing to trigger (Physics) Evaluate consequences for pixel system/chip architecture and implementation Define clear requirements to pixel chip Perform detailed simulations (together with WP3) WP10Prototypes coordination and verification ? Coordination of common MPW submissions Coordination of test an verification of test chips/circuits Coordination of test reports on test chips Other ? WPXOther ? ? 5