City of New Brighton Department of Public Works City Services Task Force Presentation April 17, 2003.

Slides:



Advertisements
Similar presentations
NPDES Phase II Permit City of St. Louis Park Annual Storm Water Informational Meeting April 16, 2009 Scott Anderson Superintendent of Utilities.
Advertisements

Stormwater Management Program Training Presented By FAU Environmental Health & Safety Phone: Fax: Web:
THE STATE OF THE CITY Presented to The League City Chamber of Commerce and Business Association February 13, 2004.
Winter Storm ” Snowfall 20 Days of Freezing Rain.
4/27/2015 Licking County Engineer’s Office MCM#6 Training MCM#6 – Pollution Prevention/Good Housekeeping for Municipal Operations Licking County & Partners.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
INDIAN VALLEY COMMUNITY SERVICES DISTRICT. It is my goal to present to the Board, and Community, not only clear justification for this proposed acquisition,
Water Services Department Arizona Mexico Commission Bi-National Meeting March 9-11, 2008 David Cavazos Deputy City Manager Water Services Department Arizona.
STORMWATER PERMITTING Requirements for the Solid Waste Industry in Colorado 5/04.
FISCAL YEAR BUDGET MONROE METROPOLITAN POLLUTION CONTROL SYSTEM BUDGET 1 Presented by Barry S. LaRoy, P.E. Director of Water & Wastewater Utilities.
Capital Improvement Plan May 8 th, 2013 Presented by City Administration: Public Works Department Finance Department.
Public Works Jack Petkus, Director Informational Overview.
Pavement Evaluation Survey Results and Understanding Condition Values PCI February 19, 2014.
PUBLIC WORKS OPERATIONS: TRANSPORTATION Steve Hansen, PE Director of Public Works – Liberty, MO APWA PW Institute April 8, 2014.
Regulatory Refresher The Municipal Regional Permit Kristin Kerr, P.E., QSD EOA, Inc. Municipal Maintenance Training Workshop May 23, 2013.
City of Dayton Water Supply and Treatment Division.
Capital Planning The (sort of) Definitive Guide (in some ways… possibly)
MONROE METROPOLITAN POLLUTION CONTROL SYSTEM BUDGET 1 FISCAL YEAR BUDGET Presented by Barry S. LaRoy, P.E. Director of Water & Wastewater Utilities.
Water Research Foundation Workshop: Benchmarking April 23, 2015.
2016 BUDGET OVERVIEW SANGER, TEXAS. BUDGET PHYLOSOPHY Conservative revenue estimates based on history. Expenditures based on history and anticipated cost.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
The Corporation of the Town of Amherstburg Public Works Department March 21, CAPITAL BUDGET.
City Manager’s Proposed Budget for Fiscal Years 2010 and 2011 City of Palo Alto Finance Committee May 19, 2009 Public Works Department- Enterprise Funds.
1 State of the City Address State of the City Address March 4 th, 2011 Glen P. Stewart, Mayor.
The Corporation of the Town of Amherstburg Public Works Department 2013 CAPITAL BUDGET Presented to: The Heavy Construction Association March 20, 2013.
Presented by Barry S. LaRoy, P.E. Director of Water and Wastewater Utilities March 31, 2014 Monroe City Hall 1.
What does PWD do for our City?. Administrative Services Engineering Operations.
Creation of MS4 Regulations Green / Tradewater River Basin Team Henderson, Kentucky Prepared by Henderson Water Utility April 22, 2008.
1 Public Works Operations March 11, Streets – Street Sweeper Warranty repair in February resulted in about 5 weeks of downtime Streets are Dirty.
Introduction to MS4 Stormwater Requirements (2009)
Department of Public WorksDepartment of Public Works Performance Measures 2010.
1 Department of Public Works and Engineering FY11 Budget Presentation.
Barb Loida, Carolyn Adamson, Dave Bauer MECA 2014.
State of Connecticut Department of Transportation Stormwater Management Plan CONNECTICUT DEPARTMENT OF TRANSPORTATION Bureau of Policy and Planning Cynthia.
Page 1 Town of Williamston Water Rates. Page 2 Page 3 Major New Costs Incurred Due to MCRWASA Plant Coming On Line Extra staff time: $10,000 (estimated)
MCM#6 Pollution Prevention/Good Housekeeping Part 1 Municipal Facility Management.
City of Springfield Office of Public Works Street & Sewer Infrastructure Analysis 1 Mayor J. Michael Houston Mark Mahoney, Director.
DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.
March 3, 2016 Discovery Sewer/RWQCB LSM Vallecitos Water District Regional Water Quality Control Board (RWQCB) Lake San Marcos February 10, 2010.
Town of Oro Valley Oro Valley Stormwater Utility Commission Overview.
March 21, BUDGET PRESENTATION- ROADS CAPITAL PROJECTS WATER WASTEWATER.
Public Works/City Hall City Council Workshop Monday, December 23 rd 5:30 p.m. 1.
Strategic Plan for Public Works Services and Operations.
2016 PROPOSED BUDGET: PUBLIC WORKS OCTOBER 06, 2015 STEVE LENISZEWSKI, PE, PUBLIC WORKS DIRECTOR.
City of Joliet 2016 Proposed Budget November 30, 2015.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
Public Works/Municipal Utilities Department FY City Council Budget Workshop June 15, 2015 Presented By: Glen W. C. Kau, PE Director of Public Works/Municipal.
Safety...Teamwork...Excellence...Innov ation...Stewardship...Sustainability...Int egrity East Campus Landscaping and Infrastructure.
P UBLIC W ORKS D EPARTMENT Total Proposed Budget $52,121,714 Funded Full Time Equivalent Positions (FTEs) = 238 Budget page Budgets shown in Millions.
City Council April 1, Capital Improvement Plan 1/14/2014Budget staff sent CIP forms and instructions to divisions 1/28/2014Projects submitted.
2014 Budget Expenditures City of Knoxville, Iowa Presentation by Harold Stewart, City Manager Monday, February 11, 2013.
PUBLIC WORKS FY 2012 Proposed Budget May 24, 2012.
Arturo Cervantes, P.E., Director of Public Works/City Engineer June 7, 2016.
Public Works July 1, 2016 through June 30, 2017 Budget Workshop
Pueblo West Metro District Proposed 2016 Budget. Revenue Sources SourceFund Property TaxesGeneral Fund Highway User TaxesGeneral Fund Franchise FeesGeneral.
Why the Need for Increased Stormwater Funding? Citizens expect a higher level of protection from flooding Increased development.
2015 Annual Financial Report December 31, Total Revenue $13,068,887Total Expenditure $14,006,870 Revenue Budget $14,957,884Expenditure Budget $15,669,564.
FY 2017 BudgetHearing September 8, 2016 Mike Loftin, Assistant City Manager - Finance 1.
Tehama County Public Works Department “ National Public Works Week” Board of Supervisors Presentation May 10, 2016 Gary B. Antone, PE, PLS Director.
PUBLIC WORKS 2017 PRELIMINARY BUDGET
Asset Management and Stormwater? Please Explain!
Environmental Services
PUBLIC WORKS DEPARTMENT
Public works 2019 budget review.
Common Sense Steps Towards Strong Financial Planning
City of Clarksville Fleet Maintenance Division City Garage
City of Valdosta Utilities Department.
MS4 OVERVIEW 2015.
Public Works 2020 Budget and CIP Review.
Presentation transcript:

City of New Brighton Department of Public Works City Services Task Force Presentation April 17, 2003

SERVICE DESCRIPTION Public Works provides the traditional City services that are essential for suburban communities: streets and sidewalks, water supply, sanitary sewer, storm water drainage, fleet maintenance, and engineering. Streets and sidewalks, fleet maintenance, and engineering are paid for through general fund taxes whereas water supply, sanitary sewer, and storm water are enterprise funds and paid for through user fees.

PUBLIC WORKS PERSONNEL Full Time & 2.5 FTE Seasonal Public Works Director Senior Eng. Tech/Supervisor Civil Engineer I Engineering Aid IV Part Time Seasonal 1 at 0.75 FTE Superintendent Streets & Sewers Office Assistant City Mechanic 2 Maintenance Worker 10 Part Time Seasonal 7 at 0.25 FTE Superintendent Water & Garage

PUBLIC WORKS DIVISIONS and 2003 Operating Budgets ENGINEERING $384,600 STREETS $465,800 CITY GARAGE (Fleet Maintenance) $389,000 WATER (Including Treatment Plants) $2,723,400 SANITARY SEWER $2,093,500 STORM WATER $335,200 TOTAL $6,391,500

ENGINEERING Tasks and Services Neighborhood area street and utility rehabilitation, approx. 3 miles per year. Annual contract maintenance: sealcoating, mill and overlay, sidewalk and curb repair, centerline striping. R/W Management, Street cut permits, and load limit permits. Neighborhood area street rehabilitation

ENGINEERING, Continued Tasks and Services Miscellaneous utility, park and drainage projects and studies. Traffic counting and traffic studies for traffic sign requests. Maintenance of street and utility systems maps and records. Provide PW information to residents I694 Sedimentation Basin

ENGINEERING Revenues The City of New Brighton has historically charge an engineering fee on public improvement projects. The engineer fee is included as part of the project cost and is paid into the City’s general fund to reduce taxes. ENGINEERING REVENUES PROJECTS $305,647 $308,580 $375,768 $331,694 $269,604 WTP #1 ADMIN FEE $105,500 $107,400 $110,800 $115,500 $119,802 TOTALS $411,147 $415,980 $486,568 $447,194 $389,406

STREETS Tasks and Services Snowplowing streets, alleys, and City lots, average 12 times per season. Snowplowing sidewalks, average 12 times per season. Pothole patching, posting Spring load limits. Tandem axle dumptruck w. front plow, wing plow, under body plow, and sander.

STREETS, Continued Tasks and Services Sweeping streets and sidewalks. Repair plow damage to mail boxes and boulevard sod. Sidewalk inspection survey. Street patching and crack sealing. Cleaning and sealing cracks

STREETS, Continued Tasks and Services Mix salt/sand and mount snowplows. Maintenance and repair of traffic control and street name signs. Management of City owned street lighting systems. 24/7 emergency response duty person. Stripe parking lots and crosswalks. Assistance with Stockyard Days setup and tear down. Respond to requests for service (Work Orders), approx. 500 per year

STREETS, Continued Public Works Department Work Orders

STREETS Infrastructure 70 miles of City streets, 7 snowplowing districts 21 miles of City sidewalk, 2 snowplowing districts 2.6 miles of public alley and numerous parking lots Numerous cross walks, traffic control signs, and street name signs. City owned street lighting systems on Silver Lake Road, 5 th Avenue NW, Old Highway 8, and 10 th Street NW.

CITY GARAGE (Fleet Maintenance) Tasks and Services Vehicle and equipment preventive maintenance. Vehicle and equipment maintenance and repair at garage, fire station and in field. Maintenance of fleet record system. Order fuel, lubricants, parts, and inventory control. Hazardous waste management, waste oil, filters, batteries, bulbs, etc. MnDot annual inspection of vehicles over 26,000 GVW. City mechanics assist with snowplowing, weekend duty, welding/metal fabrication, and public works emergencies such as watermain break repairs.

CITY GARAGE (Fleet Maintenance) City Fleet Information The 2003 replacement cost of the City fleet of vehicles and equipment is $5,236, heavy equipment units, i.e. fire trucks, dump trucks, street sweepers, motor grader, tractor backhoes, wheel loader. 37 Squad cars, staff cars, vans, and pickups trucks. 23 larger riding mowers, sidewalk snowplows, generator sets, asphalt pavers, asphalt rollers, etc. Numerous trailers, specialty equipment, hand mowers, trimmers, chain saws, pumps, tampers, etc.

WATER (Including Treatment Plants) Tasks and Services Operation and maintenance of 5 treatment plants and 12 wells, inspect 365 days per year. Water system operations and maintenance. Water sampling 30 per month. Biennial lead and copper testing. Carbon changeout at WTP #1, twice annually. 5 th Street SW 1MG Water Tower

WATER (Continued) Tasks and Services Watermain break repairs, average 25 per year. Hydrant flushing to control rusty water. Water meter installation, repairs, and miscellaneous reading. Gopher State utility locating. Water treatment plant chemical procurement. Fall hydrant flushing

WATER (Continued)

WATER (Including Treatment Plants) Infrastructure 12 water supply wells 5 water treatment plants 92 miles of water distribution pipeline 750 fire hydrants 5,700 water service connections (water customers) 950 watermain valves 4 water storage tanks with combined storage capacity of 2.75 million gallons 2002 water production – billion gallons 2001 revenues derived from operation of WTP #1 & Fridley interconnection = $206,102.54

SANITARY SEWER Tasks and Services Operation and maintenance of 5 lift stations, inspect 365 day per year. Clean 1/3 of sanitary sewer system annually, including jetting and root cutting. Televise and inspect 20% of sewer system annually. Perform annual contract maintenance for root treating, joint sealing, and shortliners.

SANITARY SEWER Infrastructure 5 Lift stations 74 miles of sanitary sewer 1700 manholes 5,700 sewer service connections (sewer customers) Lift Station No. 1

STORM WATER Tasks and Services Public education on minimum control measures. Inspect 20% of storm sewer outfalls annually. Clean sediment basins, repair weirs, skimmers, etc. Illicit discharge detection and elimination. Pollution prevention/good housekeeping for municipal operations. Post stormwater pollution prevention. E-Z Mini Storage Pond

STORM WATER Infrastructure 47 Lakes, ponds, wetlands, and man made water treatment facilities. 33 miles of storm sewer storm water catch basins. 217 storm water outfalls. 438 storm water manholes. 140 miles of concrete curb and gutter.