Presentation is loading. Please wait.

Presentation is loading. Please wait.

Department of Public WorksDepartment of Public Works Performance Measures 2010.

Similar presentations


Presentation on theme: "Department of Public WorksDepartment of Public Works Performance Measures 2010."— Presentation transcript:

1 Department of Public WorksDepartment of Public Works Performance Measures 2010

2 Roads and SidewalksRoads and Sidewalks

3 Bridges, Dams and CulvertsBridges, Dams and Culverts

4 Storm Drains and Catch BasinsStorm Drains and Catch Basins

5 Sanitary SewersSanitary Sewers

6 Traffic Signs, Signals and MarkingsTraffic Signs, Signals and Markings

7 Municipal Parking LotsMunicipal Parking Lots

8 Buildings and GroundsBuildings and Grounds

9 Solid Waste and RecyclingSolid Waste and Recycling

10 Snow and Ice ControlSnow and Ice Control

11 DPW Responsibilities cont’dDPW Responsibilities cont’d  Parking Enforcement  Equipment Maintenance  Construction

12 Assistant Director Supervisor of Highways Senior Equip Operator Mason/Equip Operator Laborer Driver II Parking Crew Leader Parking Ranger Scaleman Recycling Attendant Supervisor of Facilities & Equipment Head Custodian Custodians Sewer System Foreman Sewer System Mechanic Sewer System Operator Mechanic II Maintainer (P.T) Engineering Aid Administrative SecretarySewer Services Clerk

13 Historical Service RequestsHistorical Service Requests

14 Work Requests By Type FY 09

15 Cleaning Catch Basins Street SweepingCleaning Catch Basins Street Sweeping Total number of CB’s- 1175 Total Curb Miles – 162 Objectives: Objective: Inspect and clean all CB’s as needed.yearly. Sweep all streets by May 15 Inspect and clean all CB’s as needed.yearly. Sweep all streets by May 15 Inspect and clean CB’s in flood-prone Inspect and clean CB’s in flood-prone areas before each major rainfall Note: FY 09 is thru 12/31/08

16 Street ResurfacingStreet Resurfacing  FY 2006 -2.5 miles at $111,000 per mile  FY 2007 -2.2 miles at $130,000 per mile  FY 2008 3.4 miles in at a cost of $135,000 per mile  FY 2009 2.9 miles in at a cost of $194,000 per mile  FY 2010 1.9 miles in at a cost of $188,000 per mile

17 Total Miles ResurfacedTotal Miles Resurfaced

18 Historical Asphalt PricesHistorical Asphalt Prices

19 Value of Construction Projects thousands of dollars Value of Construction Projects thousands of dollars

20 Sanitary Sewer CustomersSanitary Sewer Customers

21 Sewer Operating Results Note: FY 10 projected

22 Paid to Stamford/Operating Revenue Note: FY 10 estimated

23 Parking Tickets IssuedParking Tickets Issued

24 Parking Ticket RevenueParking Ticket Revenue

25 Solid Waste and RecyclingSolid Waste and Recycling

26 Darien MSWDarien MSW

27 HHW Day ParticipantsHHW Day Participants

28 Cost of Household Hazardous Waste DisposalCost of Household Hazardous Waste Disposal

29 tIhe rest of your Saturday I’m done. Try to enjoy the rest of the day.

30 Department of Public WorksDepartment of Public Works Performance Measures 2010


Download ppt "Department of Public WorksDepartment of Public Works Performance Measures 2010."

Similar presentations


Ads by Google