ALICE 5 o’clock meeting Wk 2 - 2011. INDICO You’ll find this meeting here: –http://indico.cern.ch/categoryDisplay.py?categId=2957 The full shutdown planning.

Slides:



Advertisements
Similar presentations
TC meeting /11/14TC meeting2 ALICE LS1 plan from now till MarchWeeks Install TRD infrastructure46 TRD4&5 (and counterweights removal)47.
Advertisements

LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 Status of the TRD at CERN as of July 2007 TRD Group Physikalisches Institut Universität.
LS1 planning meeting Activities weeks 13, 14 & 15 22/3/13LS1 planning meeting - A.Tauro2.
ALICE planning meeting /12/10 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
ALICE planning meeting /12/10 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
ALICE planning meeting /1/11 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
TC meeting P2 planning wks 7&8 A.Tauro
André Augustinus 16 September 2002 Safety issues.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
winter shutdown preparatory meeting A.Tauro /1/12ALICE winter shutdown schedule - A.Tauro 1.
winter shutdown planning A.Tauro
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
LS1 reference slides LS1 plans Detector’s plans Services and central systems availability 8/2/13LS1 planning meeting - A.Tauro1.
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
LS1 planning meeting Comments on LS1 schedule Schedule reviewed last week with Yann + TC…  sequence after OD looked too squeezed  therefore.
ALICE 5 o’clock meeting Wk 49
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
P2 status, LS1 planning A.Tauro - W.Riegler. Outline TS2 activities Detector activities during LS1 Proposal for ALICE recommissionig plan in 2014 Conclusions.
TS4 preparatory meeting TS4 – weeks Underground access possible in week 51 – as from Monday morning 9:30 –Ulli and Philippe will start.
winter shutdown preparatory meeting A.Tauro /12/11ALICE winter shutdown schedule - A.Tauro 1.
ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.
Claudio Bortolin. Drilling: – tungsten carbide tip welded on twisted ss cable – drill to operate the rotation – counter-flow at 200 mbar w/manometer to.
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
EN-CV interventions during YETS
ALICE TC meeting – Plans for the next technical stop A. Tauro.
André Augustinus 9 October 2006 Interlocks update.
TS planning meeting 7 to 11 Nov Technical stop Wk 45: Monday 7 th to Friday 11 th November Ramp down magnets (SL): Mon 8:00 – 8:30 (latest) RP search.
winter shutdown planning A.Tauro
winter shutdown planning A.Tauro
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
TS May 9-12 – Schedule SL instructions: Both magnets ramped down Monday May 9 th 7:00 latest Thursday: check with CCC before restarting magnets: – TE-EPC.
LS1 planning meeting /4/13 ALICE TBStatus of LS1 activities - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare.
ALICE planning meeting /2/11 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
TC meeting P2 planning wks 9&10 A.Tauro
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
TC meeting LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS extraction, remove RB24 beampipe and PMD10 Remove.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
ALICE 5 o’clock meeting Wk 49. INDICO You’ll find this meeting here: – The full shutdown planning.
winter shutdown planning A.Tauro /1/12ALICE winter shutdown schedule - A.Tauro 1.
ALICE 5 o’clock meeting Wk 49
TC meeting P2 planning wks 5&6 A.Tauro
TS2 preparatory meeting A.Tauro. General information LHC- TS2: from Monday 31st 6am, to Friday 4th 5pm LHC beam stops on Monday morning.
LS1 planning meeting /7/13LS1 planning meeting - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS.
25/3/2009Detector Cooling Project Meeting I1 Running consolidation activities of ALICE Detector Cooling Systems A.Tauro.
1 Planning DCS WS L.Jirdén. 2 TPC HMPID ACORDE FE PC Console DSS Disk SRV DB-SRV App GW sensors actuators DSS sensors actuators PC room SXL2.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
TS3 preparatory meeting 14/9/2012 TS3: 17-21/
TS3 preparatory meeting A.Tauro. General information LHC-TS3: from Mon 9 6am, to Fri 13 5pm LHC beam stops on Mon morning at 6:00.
30/10/2008Engineering Forum on Cooling for the LHC Detectors 1 The ALICE water cooling systems A.Tauro.
TC meeting P2 planning wks 3&4 A.Tauro
ALICE planning meeting /11/10 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
ALICE planning meeting /1/11 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
DCal-ALICE integration and installation plan and status A. Tauro.
ALICE Installation: Planning Meeting Agenda: 1- ALICE shutdown schedule 2- Miniframe removal sequence.
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
EYETS planning A.Tauro.
ALICE 5 o’clock meeting Wk 51.
ALICE planning meeting
TS2 preparatory meeting
LS1 planning meeting - A.Tauro
LS1 planning meeting
ALICE 5 o’clock meeting Wk
ITS Cooling: Xmas Plan Claudio Bortolin.
TS1 preparatory meeting
ALICE TC meeting – Plans for the next technical stop
M.Tavlet, H.Taureg - ALICE
LHCb & EYETS
ALICE 5 o’clock meeting Wk
November technical stop activities:
Presentation transcript:

ALICE 5 o’clock meeting Wk

INDICO You’ll find this meeting here: – The full shutdown planning is here: –

14/1/115 o’clock meeting3 Access request Cavern and surface You should submit an ADI and a task procedure Two persons minimum Work breakdown structure – risk associated at each step ADI Task procedure Template EDMS Attach task procedure

14/1/115 o’clock meeting4 ALICE Christmas break schedule OpenExperiment TRD EMCal CloseExperiment Open L3 doors Close L3 doors

14/1/115 o’clock meeting5 UX25 access Rules for access restrictions: Removal/installation of shielding (restriction includes RB24 triplets) PX24 blocks: no access CR5 and UX25 PX24 beams (35t): no access CR1-5, Expo, and UX-25 All other blocks: no access to UX-25 LHC evacuation test (7/12 after 18:00 and 24/12) – no access UX25 Gas functional test (10/ hrs) – no access UX25 and CR1-5 AUG test (20/1) (Arrêt Urgence General – General Emergency Stop) – no access UX25 DSO test (12-13/1) (Department Safety Officer) – no access UX25 No access SX2 during manipulation of blocks in SX2 (except ACR and WRs)

14/1/115 o’clock meeting6 L3 (and MNF) access EMCal No Ventilation Wks 50 and 5: access (TPC) to be coordinated with TC (transport) Wks 1-2: no access during EMCal SMs insertion inside L3 (see day-by-day) When moving from low-beta to yellow platform: no access to MNF When inserting the module: no access L3 and MNF Watcher needed in wk 49 and from wk 4 onwards Wk 7: Kr calibration – TPC T stability (all interventions to be agreed by TC/RC) 31 Evac. No Ventilation 243 No Ventilation 13 7 Lift

Day-by-day schedule UX25 and MNF - Wk 2

14/1/115 o’clock meeting8 Activities in UX25 - Week /1 Monday TPC cooling VIP visit (Mr Herman Josef Lamberti, Deutschen Bank) 16:50-17:25 Muon TRG: RPC (PM) Check gas tightness on few RPC detectors, repair 2 gas distribution channels. Replace 1 HV cable (need both nacelles) SDD/ SSD Laser SDD: calibration of 78 pressure sensors (10-12/1) SSD: replacement CAEN module (C-side) + repair bad temperature signal (C-side) TOF TRM TPC FEC Visits: 9:00 University of Frankfurt - 50 persons. Kai Schweda 14:00 Private school, St. Leon, Germany - 30 persons. Kai Schweda Install new Ekspla laser Philippe: install PHOS temporary cooling pipes Yannick: re-install TPC cooling pipes MNF (I-side)

14/1/115 o’clock meeting9 Activities in MNF - Week /1 Monday

14/1/115 o’clock meeting10 Activities in UX25 - Week 2 – 11/1 Tuesday SSD/SDD cooling Muon TRG: RPC SPD cooling Laser TOF TRM TPC FEC Muon TRK: bus-patches EN-EL: pull control cables L3-Dipole lights – from CR5 to cupboard A-I side Visit (15 people at 14:00). Werner Philippe + A.Vinogradov: 9:00 switch PHOS cooling on tap water Wash 4 bad sectors + repair heater (nacelle) 2 tables (DAQ) Use RED nacelle 15:00: stop Ar/H2, C2H2F4, Isobutane, CH4 and SF6 SSD: removal of cooling pipe from corrosion test setup Move new laser down to platform TRD cables Power cut: 9:05 – 9:45

14/1/115 o’clock meeting11 Activities in MNF - Week /1 Tuesday

14/1/115 o’clock meeting12 Activities in UX25 - Week /1 Wednesday Cooling towers maintenance (start 14:00 ) (No primary water) SNIFFER maintenance Install EMCal 80deg-C SM9 Lower SM10 onto low beta platform EMC Survey Muon TRG: RPC SPD cooling Laser Cleaning rack filters (Philippe) Maintenance UPS EBS106/2X and EBS128/2X (transparent) PH-DT: new gas monitoring. Restart Ar/H2 afterwards TPC FEC Euronews visit Muon TRK: bus-patches TPC cooling Visit (P-A.Giudici + 3 persons)

14/1/115 o’clock meeting13 Activities in MNF - Week /1 Wednesday

14/1/115 o’clock meeting14 Activities in UX25 - Week /1 Thursday Cooling towers maintenance (No primary water) HMPID cooling RAMSES: radiation source testsEN/CV: maintenance SG2 ventilation DSS modification. Will stop the full DSS, trigger all interlocks, including stopping power to all racks SNIFFER maintenance Install EMCal 80deg-A SM10 EMC Survey SPD cooling Visit: (15 p.) Danish high school class (C. Søgaard) TPC FEC Muon TRG: RPC Muon TRK: bus-patches Laser TRD LV ST2: replace chamber 3BR ST2

14/1/115 o’clock meeting15 Activities in MNF - Week /1 Thursday

14/1/115 o’clock meeting16 Activities in UX25 - Week /1 Friday Cooling towers maintenance (No primary water) SNIFFER maintenance EN/CV: maintenance SG2 ventilation RAMSES: radiation source tests VAC EMC Survey SPD cooling LACS: revision UX25 access doors Removal EMCal infrastructure TPC FEC Start pumping out Muon TRK: bus-patches Laser Visit (2 people). Resp. L.Pinsky TRD LV TOF: HV test SM13 + move SM15 TOF Muon TRG: RPC

14/1/115 o’clock meeting17 Activities in MNF - Week /1 Friday

14/1/115 o’clock meeting18 Activities in UX25 - Week /1 Saturday Cooling towers maintenance (No primary water) Laser

14/1/115 o’clock meeting19 Activities in MNF - Week /1 Saturday

14/1/115 o’clock meeting20 Activities in UX25 - Week /1 Sunday Cooling towers maintenance (No primary water) D.Budnikov at CERN PHOS: maintenance crystal cooling plant PHOS cooling

14/1/115 o’clock meeting21 Activities in MNF - Week /1 Sunday

14/1/115 o’clock meeting22 AOB -