LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 Status of the TRD at CERN as of July 2007 TRD Group Physikalisches Institut Universität.

Similar presentations


Presentation on theme: "LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 Status of the TRD at CERN as of July 2007 TRD Group Physikalisches Institut Universität."— Presentation transcript:

1 LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 Status of the TRD at CERN as of July 2007 TRD Group Physikalisches Institut Universität Heidelberg

2 LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 TRD sector 08 There is 1 TRD super module installed in sector 08 since October 2006.

3 LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 TRD sector 08 status This TRD super module is operational since end of March 2007.

4 LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 What TRD prepares for in 2007 Services will be prepared assuming the TRD detector will consist of 4 SM by end of 2007 : sector 00 sector 00 sector 08 sector 08 sector 09 sector 09 sector 17 sector 17 2007 00 08 09 17 Next 3 SM installation slot is scheduled for Sept/Oct 2007.

5 LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 TRD-O-Meter http://alice.uni-hd.de/trd-o-meter The TRD-O-Meter gives an overview on the status of the TRD infrastructure at Point 2.

6 LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 Sector 08 full cabling on C-side is 2-3 days of work mounting and testing

7 LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 19 SPD 17 24 15 19 11 18 0 10 8 11 0 8 9 16 1725 333734 EXD 4/29 EXD 5/29 MTR TOF TRD TPC Sniffers T0 TS/EL ACO FMD TRD TOF 7 0 MTR TOF SPD EXD 2/29 MCH 12 15 TPC 16 18 TRD 20 23 TRI 24 27 EXD 3/29 35 28 Beam Vacuum 36 39 MCH 0 8 9 16 17 24253337 34 EXD 6/29 EXD 7/29 MTR TOF TRD TPC SSD SPD TRD TOF HMP SSD TS/EL HMP PHS SPD TPC PMD TRD TOF TRD TOF Sniffers TPCTOF SDD SPD CPV SSD 21 SSD EXD 1/29 TRD SDD TRD TS/EL Vacuum TS/EL V0 TS/EL Beam TRI EMC MTR TRI MCH LV CP GP LV SP RO LHV LV TR RO LV TRLV HVCO LV CO LHV COLV SPRO SPLVCO LV HV GAS LV PWRSIG LV SP LV SPRO DET SP CP GP LV CTP LV CTP mult CT LV TRD Racks in UX25 A I O C L3 Magnet LV TRD racks

8 LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 LV power supply installation 78/89 power bins are 78/89 power bins are installed at Point 2 installed at Point 2 26/90 Wiener power 26/90 Wiener power supplies are mounted supplies are mounted 09/90 Wiener power 09/90 Wiener power supplies are operating supplies are operating sector 08 operating sector 08 operating sector 09 installed sector 09 installed sectors 00,17 sectors 00,17 available till end July available till end July GTU power operating GTU power operating PCU commissioned PCU commissioned

9 LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 HV power distribution 2 TRD SM can be 2 TRD SM can be operated standalone operated standalone from ISEG crates from ISEG crates using patch boxes using patch boxes as temporary HVDS as temporary HVDS replacement replacement new 32ch ISEG new 32ch ISEG HV modules for HV modules for 4 TRD SM will 4 TRD SM will be delivered by be delivered by end of August end of August (ATLAS Calo Type) (ATLAS Calo Type)

10 LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 LV Patch Panel for SM mounted on the mounted on the SM end cap SM end cap connects from connects from LV patch panels LV patch panels in Back-/Baby- in Back-/Baby- frame to SM frame to SM LV patch chord LV patch chord cabling is cabling is simplified and simplified and quicker quicker

11 LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 DCS network monitoring tools We developed monitoring tools for status control of: Wiener power supplies Wiener power supplies Netgear switches Netgear switches DCS boards DCS boards

12 LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 Detector Control System

13 LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 Installed at P2 mid April 07 SSDSPD TPC TRDTOFHMPPHOCPVMCHMTRFMDT0V0PMDZDCACOEMCDCS standard semi specific HV MON LV MON BOM RCK MON FEE CPU GPS VHVLV LED LIQ GMS LAS THR MOV HAL RAD SFM MON CCO LED FEE NMR HVD APD COO VME COO VEN GAS VME Central effort MON VME VEN GAS MON VME GAS THR IAS GTU PCU PTU TRG GAS VME COO VAC DSS TCO APD LVDFEL LAS CAM MIR SYN GPU SDDTRG VEN PVSS FSM Configured DVM TOR TRU

14 LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 1 st Cosmic TRD-Events at P2 1 st event taken on 12 May 2007 1 st event taken on 12 May 2007 presently 5k cosmics taken presently 5k cosmics taken signal, reconstructed clusters signal, reconstructed clusters TRD-chamber time-0 planes TRD-chamber time-0 planes

15 LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 Outlook  Complete Services for 4 SM(Jul 2007)  GTU commissioning with SM-I(Jul 2007)  Pre-trigger commissioning(Jul 2007)  SM-II commissioning(Aug 2007)  Comm. w/ CTP and trigger detectors(Aug 2007)  Cosmics data taking w/ SM-I and II(Aug 2007)  in total 4 SM installed(Oct 2007)


Download ppt "LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 Status of the TRD at CERN as of July 2007 TRD Group Physikalisches Institut Universität."