SX5: YE+2Counting House iBoot NPS emu slice0 2 emu slice0 1 Emu dqm Peripheral Crate DMB TMB DMB TMB DMB TMB DMB TMB MPC CCB DMB TMB DMB TMB DMB TMB DMB.

Slides:



Advertisements
Similar presentations
EMU Peripheral Backplane. Timing with the CCB’2004 M.Matveev Rice University April 26, 2004.
Advertisements

CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 CSC Muon Trigger - Annual Review Jay Hauser, with many slides from Darin Acosta and Stan Durkin.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
1 Beam test at DESY Date: 01/12 – 19/12 Place: DESY, Testbeam area 24 Time schedule and more information available:
CSC Synchronization Procedure and Plans CMS Endcap Muon FNAL October 29, 2004 Jay Hauser* / Martin Von der Mey / Yangheng Zheng University of.
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
S. Durkin, USCMS-EMU Meeting, Oct. 21, 2005 Critical Data Errors S. Durkin The Ohio State University USCMS EMU Meeting, FNAL, Oct. 20, 2005.
CSC Trigger Report: Results from June 25 ns beam test Production plans Software Darin Acosta University of Florida.
TB2004 DAQ Code Development Status & Prospect. July 1, 2004TB2004 DAQ Code Development2 Contents 1.TB status –run control –peripheral/FED crate –DAQ column.
Printed by Topical Workshop on Electronics for Particle Physics TWEPP-08, Naxos, Greece / September 2008 MEZZANINE CARDS FOR.
Status of the CSC Track-Finder Darin Acosta University of Florida.
Summary of CSC Track-Finder Trigger Control Software Darin Acosta University of Florida.
W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 1 US CMS TriDAS US CMS Meeting Wesley H. Smith, U. Wisconsin CMS Trigger Project.
Test Beam Wrap-Up Darin Acosta. Darin Acosta, University of Florida 18 June 2004 USCMS Meeting 2 Agenda n Darin/UF: General recap of runs taken, tests.
CSC EMU/Track Finder Clock and Control Board (CCB’2004) Status Plans M.Matveev Rice University August 27, 2004.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
DAQMB Production Status S. Durkin The Ohio State University Florida EMU Meeting 2004.
1.2 EMU Electronics L.S. Durkin CMS Review CERN, September 2003.
1 SCA Cell Utilizing Scheme The output of each preamp-shaper channel is sampled continuously at 20 MHz and stored the SCA cells. There are 96 cells for.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
21-Jan-2009CSC - ESSC Jan'091 Report on CSC for ESSC Prepared for CSC by Fred Borcherding FNAL.
Track-Finder Test Beam Results Darin Acosta. Darin Acosta, University of Florida 30 July 2004 Trigger Meeting CSC Beam Test (Muon Slice Test) ME.
1 The TrackFinder GUI D. Acosta, L. Gray, N. Park, H. Stöck University of Florida.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
S. Durkin, Software Review, March 16, 2006 FED Library S. Durkin The Ohio State University CSC Online Software Review, March 16,2005.
PNPI / University of Florida Checking PC Timing Lev Uvarov CSC Time Synchronization Meeting May 12, 2009.
M.Matveev Rice University March 20, 2002 EMU Muon Port Card Project.
Test Software for EMT Paul Padley Rice University May, 2005.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
EMu Slice Test -- Status Frank Geurts FNAL/Rice
6-Dec-05PC Commissioning1 Peripheral Crate (PC) Commissioning Status Fred Borcherding, CSC/EMU Group.
CSC Test Beam 2004 Summary Darin Acosta (For the EMU Collaboration)
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
CSC Synchronization Procedure and Plans
CSC EMU Muon Port Card (MPC)
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF
“Golden” Local Run: Trigger rate = 28Hz
EMU Slice Test Run Plan a working document.
CMS EMU TRIGGER ELECTRONICS
Regional Cal. Trigger Milestone: Major Production Complete
Current Status of CSC Trigger Elements – Quick Summary
CSC Muon Trigger - Annual Review
CSC Trigger Update Specific issues:
Darin Acosta University of Florida
September CSC Beam Test Report
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Regional Cal. Trigger Milestone: Production & Testing Complete
CSC Trigger Primitives Test Beam Studies
New Calorimeter Trigger Receiver Card (U. Wisconsin)
TMB and RAT Status Report
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
B904 Status Report by Fred B.
Regional Cal. Trigger Milestone: Production Complete - U. Wisconsin
CSC Trigger Meeting Summary
Fred’s Input to Rice Workshop
Configuring the Peripheral Crates
19-April-05 Peripheral Crate Testing, Installation, and Commissioning PC I&C Feb ’06 EMU Fred Borcherding 16-May-19 PC I&C Feb'06.
The Trigger Control System of the CMS Level-1 Trigger
FED Design and EMU-to-DAQ Test
Plans for the 2004 CSC Beam Test
TTC Fiber Distribution
Peripheral Crate Testing, Installation, and Commissioning
Prepared for CSC by Fred Borcherding FNAL
CSC Status Report Status reports;
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
Presentation transcript:

SX5: YE+2Counting House iBoot NPS emu slice0 2 emu slice0 1 Emu dqm Peripheral Crate DMB TMB DMB TMB DMB TMB DMB TMB MPC CCB DMB TMB DMB TMB DMB TMB DMB TMB DMB TMB D360 USB 2 Peripheral LAN ( /24) Peripheral LAN ( /24) FED Crate DDU CCB D360 EMU-DAQ LAN ( /24 ) EMU-DAQ LAN ( /24 ) TF Crate SP CCB SBS620 MS TTC Crate TTCvx TTCvi V MHz USB (1.1) CERN LAN ( /16) CERN LAN ( /16) emu slice xxx PCI ~240V EMU Spring Slice Test: Network/Control Distribution B2-A02-4 B2-A02-3 B2-A02-1 B2-A01-2a B2-A01-2b B2-A01-1 VME+2/5

emu slice0 2 emu slice0 1 Peripheral Crate DMB TMB DMB TMB DMB TMB DMB TMB MPC CCB DMB TMB DMB TMB DMB TMB DMB TMB DMB TMB D360 USB 2 FED Crate DDU CCB D360 TF Crate SP CCB SBS620 MS TTC Crate TTCvx TTCvi V MHz USB (1.1) SX5: YE+2 Mini RackCounting House EMU Spring Slice Test: TTC Distribution

Counting House emu slice0 2 emu slice0 1 FED Crate DDU CCB D360 TF Crate SP CCB SBS620 MS TTC Crate TTCvx TTCvi V MHz SX5: YE+2 Mini Rack EMU Spring Slice Test: local DAQ Distribution Peripheral Crate DMB TMB DMB TMB DMB TMB DMB TMB MPC CCB DMB TMB DMB TMB DMB TMB DMB TMB DMB TMB D360 6x emu dqm CERN (Local) LAN CERN (Local) LAN

FRL crate Central DAQ DAQ Counting House FED Crate DDU CCB D360 TF Crate SP CCB SBS620 MS TTC Crate TTCvx TTCvi V MHz SX5: YE+2 Mini Rack EMU Spring Slice Test: Central DAQ Distribution Peripheral Crate DMB TMB DMB TMB DMB TMB DMB TMB MPC CCB DMB TMB DMB TMB DMB TMB DMB TMB DMB TMB D360 6x

Counting House emu slice0 1 FED Crate DDU CCB D360 TF Crate SP CCB SBS620 MS TTC Crate TTCvx TTCvi V MHz SX5: YE+2 Mini Rack EMU Spring Slice Test: local Trigger Distribution Peripheral Crate DMB TMB DMB TMB DMB TMB DMB TMB MPC CCB DMB TMB DMB TMB DMB TMB DMB TMB DMB TMB D360 CERN (Local) LAN CERN (Local) LAN 3x (elec.conv.) emu slice0 2 USB 2 USB (1.1) PCI