Indian Reservation Road Bridge Program 23 CFR 661 IRRCC Meeting February 22, 2006 Tulsa, Oklahoma.

Slides:



Advertisements
Similar presentations
State Aid Programs An Introduction to: Local Bridge Replacement Program Local Road Improvement.
Advertisements

State Aid Programs Legislative Issues - Bonding Local Bridge Replacement Program Local Road Improvement Township Sign Replacement Program.
Opportunities Exist to Strengthen FHWAs Coordination Guidance and Oversight of the Tribal Transportation Program October 30, 2013.
LHTAC Overview of LPA in Idaho July 24, 2013 Local Public Administration.
With the Genesee County Road Commission By Fred Peivandi, P.E. And Ken Johnson, P.E. Local Road Funding.
Tribal Consultation and Informational Meetings. Topics Review of Q10 and contribution percentages Inventory Review Impacts to both current formula and.
Bureau of Indian Affairs December 2012 Tribal High Priority Projects Program 21st Alaska BIA Providers Conference.
Tribal Consultations. Topics FY12 Extensions and IRR Program Funding MAP-21 Programs and Funding.
TTPCC Meeting Albuquerque, NM 8/27/13.  MAP-21  FY 13 Funding  Inventory ( NTTFI )  Regulations and Consultation  Safety  Planning and Bridge 
Bridges & Culverts Usage Codes and Validation Annual FIMS Comprehensive Training March 27, 2014.
State Home Construction Grant Program 2013 Grant FundingGrant Program Timeline Grant Program Update ARRA Update.
Impacts of “MAP-21”on the National Bridge Inspection Program Tribal Government Coordination Meeting Date August 7, 2014 Presented by: Gary Moss, P.E. Acting.
JULY 23,  Legislative Update ◦ Highway Trust Fund status ◦ Reauthorization proposals ◦ FY15 Appropriations  TTP Safety Funding  TTP Bridge Funding.
Division of Local Assistance Office of Special & Discretionary Programs December 2, 2010.
Federal Aviation Administration Airports Division Eastern Region AIP Grant Program: Dates & Deadlines Hershey Conference, March 8, 2007.
EEM Established in 1989 Section of the Streets and Highways Code provides the Legislature with the authority to allocate $10 million annually. Fiscal.
1 IRR Program Inventory and Funding Formula Update M.A.S.T. Impact Week Washington, DC March
Tribal Transportation Summit FY 06’ Larry Haley, P.E. Regional Road Engineer.
ARRA Overview Q&As IRRPCC Meeting Herndon, VA March 25, 2009.
Eligible Uses of Transportation Planning Funds SAFETEA-LU Training Webcast April 2006 SAFETEA-LU Training Webcast April 2006.
Design Standards For Local Agency Bridges Statewide Local Agency Project Delivery Conference May, 2006 Design Standards For Local Agency Bridges Statewide.
COSCDA Conference 2012 Washington, DC Susan Ziff, HUD March 12, 2012 Substantial Amendment Process for Second Allocation of FY 2011 ESG Funds.
TRIBAL TRANSPORTATION PROGRAM AGREEMENTS Andrew S. Caulum Office of the Solicitor – Division of Indian Affairs Prepared for the BIA Providers Conference.
Cape Cod Transportation Improvement Program (TIP) HOW DOES A PROJECT GET ONTO THE TIP ? Priscilla Leclerc, Senior Transportation Planner Cape Cod Commission.
Alaska Tribal Transportation Workgroup Julianne Baltar, President Alaska Tribal Transportation Workgroup and Director of the Bristol Bay Native Association’s.
FY2012 Allocations (TTAM) IRRPCC (TTPCC) October 30, 2012.
Fiscal Years Outlook Preliminary Six-Year Financial Plan and Six-Year Improvement Plan Strategy John W. Lawson, Chief Financial Officer Reta.
2012 FTIP/FSTIP Workshop Project Selection Process.
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
NDACo Legislative Wrap-up Funding for Non-Oil Producing County Highways and Bridges Jason Benson Cass County Engineer.
TTP Coordinating Committee Meeting Laveen Village, AZ Robert Sparrow Director – TTP - Federal Highway Administration.
Bureau of Indian Affairs November 2005 Indian Reservation Roads High Priority Projects IRRHPP.
QA/QC Team TPPCC GRIC May 6, Initial Issue: QA/QC Team Quality Assurance/Quality Control (QA/OC) Inventory Teams - As identified in our February.
Western Region CSREES Administrative Officer’s Meeting Monterey, California October 4 – 6, 2005 Janet Downey, Staff Accountant OEP, POFMB, Oversight Section.
IRRPCC Meeting Albuquerque, NM November 8,  Clarification needed on applicability of these roads into the IRR Inventory  Assignment given to IRRPCC.
Mid-States Highway-Rail Grade Crossing Safety Conference Guan Xu, P.E. Federal Highway Administration Office of Safety Design.
February 21-22, 2006RIFDS Training 1 RIFDS TRAINING Presentation by LeRoy Gishi Chief, Division of Transportation Bureau of Indian Affairs.
Matthew Udenenwu Waste Permits Division 2015 TCEQ Environmental Trade Fair.
TTP Overview and Update BIA Providers Conference Anchorage, AK December 3, 2013.
1 Federal Register Notice “Public Transportation on Indian Reservations” Office of Program Management Tribal Transit Outreach Meetings April 2006.
Genesee County Road Commission Fred Peivandi, P.E. County Highway Engineer MTPA July 15, 2011 TIP Project Administration.
Tolling and Pricing Opportunities Under the Federal-aid Highway Program January 2006.
IRR Program Update Priorities. ITEMS of Concern Revisited Over the last 6-9 months the following are items of concern that we have received in the BIADOT.
INTRODUCTION TO FEDERAL HIGHWAY FUNDING AND ELIGIBILITY Steve Baumann Financial Specialist (503) Mike Morrow(Field Operations Engineer) Mike.
COORDINATED BORDER INFRASTRUCTURE PROGRAM. SAFETEA-LU Signed August 10, 2005 Created CBI program from Border/Corridor discretionary program from TEA-21.
A Very Small Starts Proposal CAN be easier than you think Karl Otterstrom, AICP Spokane Transit, Director of Planning Spokane, WA QUALITY TRANSIT -- NOW.
KAPA FALL FORUM T-WORKS Progress 7,714 miles improved $63 million modal projects complete 559 bridges repaired/replaced $2.3 billion let.
Consulting with Idaho Tribes in Planning Transportation Development 14 th Annual NW Tribal Transportation Symposium Patti Raino, ITD.
2015 Midwest Region Tribal Transportation Meeting MIDWEST REGION APRIL 28-29, 2015 ROTHSCHILD, WI.
Washington D.C. Update Roger Petzold, P.E. Team Leader Border & Corridor Team Office of Planning.
Review of Principal Arterial Routes on the National Highway System For MAP-21 Reta R. Busher Chief of Planning and Programming October 17, 2012.
SESSION 5: TRANSPORTATION ISSUES Rob Henken President, Public Policy Forum August 5, 2014.
Draft 2008 Congestion Management Process (CMP) Technical Report Andrew J. Meese COG/TPB Staff TPB Technical Committee June 6, 2008 Item # 8.
Welcome March 20th 2009 Roads 101 GCMPC Presentation By Derek Bradshaw.
Office of Planning & Performance Management 2051 Mercator Drive Reston, VA Phone: (703) Fax: (703) Mapping Indian Affairs and Tribal.
1 Tribal Transit Program Federal Transit Administration October 2006.
EM-1 Office of Environmental Management SAFEGUARDS AND SECURITY Post September 11 events have required EM to increase the level of protection at DOE sites.
2015 Partnering Conference “Division of Program Management” September 8, 2015 Ron Rigney, PE & PLS Director, Division of Program Management 1.
1 Review of Draft FY2009 Unified Planning Work Program (UPWP) Ronald F. Kirby Director, Department of Transportation Planning National Capital Region Transportation.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
Unit 2 DEVELOPMENT OF THE LONG RANGE TRANSPORTATION PLAN (LRTP) LCTCC Educational Program.
MAP-21 Formula Briefing Preliminary DRAFT. Moving Ahead for Progress into the 21 st Century (MAP-21) MAP-21 was passed by Congress and signed by the President.
ADMINISTRATION Legislative Update Transportation Policy Committee March 24, 2010.
TRANSPORTATION PROGRAMS Financial Planning and Fiscal Constraint Requirement MAG Regional Council February 24, 2010.
TTP Update COLT Meeting Rapid City, SD Bob Sparrow
Highly Fractionated Indian Land (HFIL) Loan Program
Board of Early Education and Care Planning and Evaluation Committee
Strategic Plan FY 2019 – FY 2023 Update.
Overview of 2019 Non-BIA Federal Register Notice
Tribal Transportation Program (TTP) 23 U. S. C
Presentation transcript:

Indian Reservation Road Bridge Program 23 CFR 661 IRRCC Meeting February 22, 2006 Tulsa, Oklahoma

This Presentation will cover:  Status of IRRBP  Projects  Funding  Update to the 23 CFR 661 IRRBP Regulations

IRRBP Projects Funded in FY 05  45 bridge projects funded:  17 BIA owned projects  28 Non-BIA owned projects  $22.8 million used  $19 million TEA-21 bridge funds  $3.8 million of FY 05 STEA funds $9.2 million rolled back to the IRR Program

SAFETEA-LU FY05 IRRBP Funding  $14,000,000/yr per SAFETEA-LU  Net $11,970,000 (lost $2,030,000 due to 14.5% ob limit)  carried over into FY 06

FY 06 IRRBP Projects (as of 2/15/06)  20 bridge projects funded:  4 BIA owned projects  16 Non-BIA owned projects  $10.1 million used  FY05 Carryover Funds $1.87 million remaining

Status of IRRBP Funding in FY 06  $14 million for FY 06  Net $12.06 million after Ob limit and rescission  $1.87 million remaining from FY 05 carryover Total available = $13.93 million

Changes to IRRBP  Result from SAFETEA-LU  $14,000,000 for FY05 through FY09  Use to carry out planning, design, engineering, preconstruction, construction, and inspection of projects  Bridges must be structurally deficient or functionally obsolete  Funds for design based on availability  Funds for construction and inspection after PS&E approval.

Update to the 23 CFR 661 – IRRBP Regulations:

Issues  How to handle Preliminary Engineering?  Should the 80% - 20% split for BIA and non-BIA owned bridges be kept?  Is 1 st come - 1 st served basis working?  Should there be a funding ceiling for design and construction?

Annual IRRBP Funding

FY 06 IRRBP FUNDING FOR DESIGN

FY 06 IRRBP FUNDING FOR CONSTRUCTION

Update to the 23 CFR 661 – IRRBP Regulations:  What’s new?  Definitions – PE, PS&E, Approach roadway  Eligibility Criteria  Contents for an application for PE  What’s Next?  Looking for comments/recommendations from BIA and IRRCC. (Due by March 10)

Update to the 23 CFR 661 IRRBP Regulations:  Then What?  Review comments, prepare Interim Final Regulation, and provide to IRR Coordinating Committee  Publish Interim Final and request public comments  Review comments and prepare Final Regulation  Publish Final Regulation

QUESTIONS? Russell Garcia, P.E. IRR Program Engineer Federal Lands Highway Washington D.C. (202)