Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.

Slides:



Advertisements
Similar presentations
CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe.
Advertisements

Nov. 07 DR-KOM-CFS 1 Damping Rings KOM Conventional Facility & Siting Overview Tom Lackowski Acknowledgment: Atsushi Enomoto, Jean-Luc Baldy, John Osborne,
Nov. 19, 2008 ILC08 Global Design Effort 1 Status Report Alternative Siting and Tunnel Design Tom Lackowski.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
3/2011 CFS BTR Global Design Effort 1 Americas Region Civil Design Tom Lackowski.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Global Design Effort BDS KOM Opening remarks/comments from EDR Project Management SLAC Marc Ross / Nick Walker.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
1 Process Water and Air Treatment 01 June 2007 Emil Huedem, Maurice Ball, Lee Hammond Fermilab.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
Global Design Effort - CFS SiD Collaboration Meeting - SLAC 1 VERTICAL ACCESS ILC IR LAYOUT for SiD and ILD CONVENTIONAL FACILITIES AND SITING.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update November.
BDS Magnet-Power System-Facility Optimization1 ILC BDS Kickoff Meeting Basis for Magnet, Power System and Cooling Facility Optimization Discussion Paul.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Sept., 2007 European CF&S Kick Off Meeting 1 Plan for a Value Engineering Study T. Lackowski.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas CFS AD&I Status Report Conventional.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
VLCW July Global Design Effort1 Installation Global System Review F. Asiri W. Bialowons, T. Shidara Acknowledgment: C. Hauviller, R. Sugahara C.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
SLAC_OCT07 BDS-KOM-CFS 1 Beam Delivery System & Interaction Region KOM Conventional Facility & Siting Overview Fred Asiri/SLAC Acknowledgment: Atsushi.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
WBS x.11 Conventional Facilities Americas Region ILC Fermilab ART Meeting1 Conventional Facilities and Siting Global Group Americas Region FY.
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
Fred Asiri1 Conventional Facilities SLAC April 9, 2006 Acknowledgment: Clay Corvin, Jerry Aarons, and Jonghoon Kim.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Global Design Effort - CFS Accelerator Advisory Panel Review - Oxford UK 1 ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Conventional Facilities and Siting GG Global Design Effort BILCW 07 - Beijing1 Conventional Facilities and Siting Global Group Summary Report.
Work Related to Senate Bill 2202 (effective January 1, 2001)
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
Conventional Facilities and Siting Global Group Global Design Effort CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, CFS EDR FNAL Kick-Off Planning.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
1 of 5 CONVENTIONAL FACILITIES & SITING GROUP PROGRESS OVERVIEW J.L. Baldy, A. Enomoto, V. Kuchler V. KUCHLER GDE Executive Committee Meeting
Global Design Effort - CFS ILC Source/RTML/BDS + MDI Technical Baseline Review October ILC SOURCES/RTML/BDS + MDI TECHNICAL BASELINE.
Summary: Site Discussion Jonathan Dorfan SLAC Plenary Session, June 6, 2008.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
Global Design Effort RTML KOM Close-out Ross, Walker.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Conventional Facilities and Siting Global Group (ARCFS)
Installation Global System
Conventional Facility & Siting (CF&S) Overview for the Positron Source
LCWS11 AWG9 PARALLEL SESSION SUMMARY
ILC GLOBAL SYSTEMS MEETING
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
ILC Value Management Workshop
Tom Lackowski Revised 10/12/2011
Presentation transcript:

Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon

Fred Asiri2 A Tentative CF&S Work Plan Approach for EDR

Fred Asiri3 Goal: To apply the first iteration cycle of the Work-Plan, focusing on e- Sources, Beam Delivery and Interaction Region Approach: Will be based on Systems Engineering Management –Define physics functional requirements Identify the range; Acceptable, Preferable, Desirable –Define boundaries, interfaces, utility needs and functional environment –Define physics requirement to an engineering requirements –Initiate a CFS Design Configuration Control Document –Put under Interface Control –Identify Optimization Studies Design Alternatives Trade-Offs Trade Studies Constructability Studies Value Analysis Studies A Tentative CF&S Work Plan Approach for EDR

Fred Asiri4 All three regions contributed to the following CFS accomplishments:All three regions contributed to the following CFS accomplishments: –An overall Work Breakdown Structure (WBS) for the CE/CF effort was developed that reflected work required for the development of the EDR. –The WBS were prioritized and the highest priority items were then developed into CE/CF work packages with suggested milestones and completion dates. –Project Management Plan (PMP) with milestones for the highest priority work packages was developed and submitted to the Project Management Group. –An initial comprehensive Area System criteria list was developed. –This criteria list will be used, with necessary adjustments, to collect data from all of the Area Systems in the coming months and will serve as the basis for the EDR CFS design Activities Update Since November 5, 07

Fred Asiri5 The points of contact will be the primary focus for the gathering of criteria. Those primary responsibilities are:The points of contact will be the primary focus for the gathering of criteria. Those primary responsibilities are: – T. Lackowski Main Linac - T. Lackowski with A. Enomoto Main Linac - T. Lackowski with A. Enomoto – J. Osborne e- Source - G. Aarons e- Source - G. Aarons e+ Source - J. Osborne e+ Source - J. Osborne Damping Ring - T. Lackowski with A. Jackson RTML - FNAL person to be determined RTML - FNAL person to be determined – F. Asiri BDS - F. Asiri BDS - F. Asiri Interaction Region - J. Osborne Interaction Region - J. Osborne Activities Update Since November 5, 07

Fred Asiri6 Activities Update Since November 5, 07 Following is an excerpts from BDS –CFS criteria spreadsheet: Following is an excerpts from BDS –CFS criteria spreadsheet:

Fred Asiri7 All three regions contributed to the following CFS accomplishments, continued:All three regions contributed to the following CFS accomplishments, continued: –A review of the CFS cost estimate was initiated at the GDE Meeting held at Fermilab in October, –Additional work was conducted in the weeks that followed. –The result is: A CFS cost estimate that has been reconciled between the three regions,A CFS cost estimate that has been reconciled between the three regions, Is consistent with the information contained in the Reference Design Report and adjusted to correct minor discrepancies that had been identified by the Cost and Scheduling GroupIs consistent with the information contained in the Reference Design Report and adjusted to correct minor discrepancies that had been identified by the Cost and Scheduling Group –The first in a series of value management reviews was organized, in conjunction with consultants from the U. S. Army Corps of Engineers Goal; to identify options for value improvement and cost reduction with respect to the ILC Main Linac process cooling water system.Goal; to identify options for value improvement and cost reduction with respect to the ILC Main Linac process cooling water system. The review was held at Fermilab, Nov 27-29, with international participation both in-person and by Video.The review was held at Fermilab, Nov 27-29, with international participation both in-person and by Video. Activities Update Since November 5, 07

Fred Asiri8 Main Linac Value Management Workshop-11/07Main Linac Value Management Workshop-11/07 –Workshop to comprehensively examine the power and cooling system requirements and design solutions leading to ideas that will reduce the connected power, power usage and operating costs for the project –Followed U.S. Army Corps of Engineers Format –Agenda and presentations at: –Concentrated on largest power user, the Main Linac – examined all aspects of the technical equipment and conventional equipment as it relates to power and cooling –Speculation Phase -> Functional Analysis Phase (FAST Diagrams) -> Development Phase Planning Activities Update Since November 5, 07

Fred Asiri9 Activities Update Since November 5, 07

Fred Asiri10 Activities Update Since November 5, 07 Functional analysis methodologyFunctional analysis methodology –How ; Why ; when

Fred Asiri11 Activities Update Since November 5, 07 Close-out –Over 50 items prioritized –Top 13 listed were developed into Work Packages –13 WP Proposals to be bid on by Labs or others

Fred Asiri12 Anticipated work in the coming months:Anticipated work in the coming months: –Generate and distribute criteria lists to all Area Systems (tailored as needed for general as well as area specific criteria). –Establish EDR points-of–contact with all Area Systems and Technical Systems as needed. –Continue to develop CE/CF plan for EDR definition and completion for presentation at the GDE Meeting in March, 2007 with consideration for available resources and work package assignments. –The CFS Group will explore with CERN issues common to the ILC and CLIC projects that have strong mutual interest and overlap in the Conventional Facilities area. Activities Update Since November 5, 07

Fred Asiri13 A Tentative CF&S Timeline for EDR