D. EliaALICE week / DCS workshop - Sept 20, 20041 SPD Power Supply System DCS status Domenico Elia INFN Bari.

Slides:



Advertisements
Similar presentations
S.PopescuAlice DCS workshop, Colmar, OPCs latest news Iseg OPC server Wiener OPC server.
Advertisements

JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
The Detector Control System – FERO related issues
S.PopescuAlice DCS workshop, Colmar, Follow-up from the last DCS workshop Answers and recommendations.
Sezione di Bari September 16, 2002D. Elia - DCS workshop / ALICE week 1 SPD PS system and Controls Domenico Elia, INFN-Bari.
P.C. Burkimsher Alice DCS Workshop 18 March 2002 (Updated 27 March 2003) PVSS - How to get started Paul Burkimsher IT Division COntrols Group Support Services.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
ALICE DCS Workshop - 15/3/2004 G. De Cataldo, A.Franco, A.Tauro - INFN Bari - 1 The SY1527 replay delay via the OPC and the ‘SY driver’ (By HMPID) The.
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
March 16, 2004Alice controls workshop, S.Popescu Low Voltage and High Voltage OPC status and plans.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
1 July 19, 2005German Martinez – SX5 Meeting RBX Temperature Monitoring Proposal German Martinez.
Uli Schäfer DCS meeting Oct. 8th 1. Radiation tests 2002Jim Cook 2. CAN branch with Kvaser PCI/CAN cardFernando Varela 3. Readout chain ELMB-OPC-PVSSHelfried.
Uli Schäfer Discussions with H.B. after last meeting… All ATLAS standard racks and crates will be monitored. Helfrieds group will equip them with ELMBs.
Marc R. StockmeierDCS, KIP ALICE WEEK FALL 2003 TRD DCS Status ● DCS-board status ● Poweresupply ●
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
PP2 Status F. Bellina. Problem solved.. Problem with inhibit and reading temperature and many crazy behavior Solved with a new FPGA firmware: the hardware.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
MDT PS DCS for ATLAS Eleni Mountricha
S.Sergeev (JINR). Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system.
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
ALICE DCS Workshop 28/29 May 2001 Vito Manzari, INFN Bari SSD (Silicon Strip Detector) SDD (Silicon Drift Detector) SPD (Silicon Pixel Detector) Detector.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
1 Responsibilities & Planning DCS WS L.Jirdén.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
D0 Workshop Bagby, Foglesong John Foglesong Run 2B SMT Low Voltage Power The present location of the SMT DC power supply units creates a problem.
André Augustinus 6 October 2005 Cabling, Interlocks, Racks Some remarks.
20th September 2004ALICE DCS Meeting1 Overview FW News PVSS News PVSS Scaling Up News Front-end News Questions.
André Augustinus OPC news, versions to use on behalf of Sorina Popescu.
Naming and Code Conventions for ALICE DCS (1st thoughts)
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
André Augustinus 16 September 2002 PVSS & Framework How to get started.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Outlook Production of the 12 DPs (220m Stations) Installation of the DPs in the LHC Tunnel Status of the RP Systems/Services Resources Production of DPs.
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
JCOP/DCS Plans for HW Upgrade A. Augustinus (ALICE), C
October 9th 2006ALICE WEEK - DCS WorkShop1 DEVICE USER SUPPORT OVERVIEW - Presentation - First Line Support - Reference System - Current Developpement.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
NA62 straw tracker DCS Straw tracker overview Bulk power supply Power supply distribution and monitoring LV + monitoring HV Temperature monitoring Gas.
DCS Workshop 17 June 2002 PHOS DCS status Serguei Sadovski.
ATLAS DCS ELMB PRR, CERN, March 2002Fernando Varela ELMB Networks CAN/CANopen Interoperability of the ELMB Usage of the ELMB in ATLAS ELMB Networks Full.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
ALICE DCS Workshop 9 October 2006 ALICE DCS Workshop 9 October 2006 Michele NITTI.
European Organization for Nuclear Research DCS remote control in NA62: Equipment & Control Integration. Mathias Dutour NA62 Collaboration 9th December.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
22/May/02 JCOP meeting G. De Catatldo-A.Franco INFN Bari Italy 1 The Control System of the HMPID up to the end of 2001 ; 2002: The FSM toolkit, Hierarchy.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
JCOP Framework and PVSS News ALICE DCS Workshop 14 th March, 2006 Piotr Golonka CERN IT/CO-BE Outline PVSS status Framework: Current status and future.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
1 COSTING DCS WS L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
CERN Summerschool 2007 Monitor and Control of the CANbus power supplies of ATLAS’ MDTs Wilco Koppert (UU)
The Maraton LV system Michela Lenzi INFN Firenze Thanks to V. Bocci, P. Ciambrone, A. Sciubba LV Power Supply RCM AC/DC converter.
Radiation- and Magnet field- Tolerant Power Supply System
Presentation transcript:

D. EliaALICE week / DCS workshop - Sept 20, SPD Power Supply System DCS status Domenico Elia INFN Bari

D. EliaALICE week / DCS workshop - Sept 20, PS DCS 2004 PVSS WIENER PL500 CAEN SY1527 ELMB PVSS framework v components v , ELMB v.1.0 components Patches for PVSS CAEN HV OPC Server - Rel. 2.7-(July_03) SY 1527 firmware version or later (recommended ) Network Interface Card + TCP/IP protocol SLiC OPC server (Mark Beharrell) CANbus adapter: PCI-CAN Kvaser card ADDITIONAL CLIENT Overview of all the integrated components: OPC20CanOpen.OPC CANbus adapter: PCI-CAN Kvaser card ADDITIONAL TOOLS to manage the BUS + CLIENT (A. Dalessandro)

D. EliaALICE week / DCS workshop - Sept 20, ▪ All the following features implemented: ON/OFF (inhibit) OVC flag Current limit Voltage and current monitoring Control signals photo-insulated from VR ground No additional power supply required Remote Vout settings (under test)  Control and Read-out software updated (new panels, see next slide), PVSS ELMB framework used  People involved: (Antonio Dalessandro), Michele Caselle, Leonid Vinogradov New Board successfully tested in the Bari Lab ! Developments on the VR board (I)

D. EliaALICE week / DCS workshop - Sept 20, Developments on the VR board (II) T sensors V/I monitoring VR on/off OVC flags Vout setting

D. EliaALICE week / DCS workshop - Sept 20, Starting using new PVSS version: PVSS II 3.0 Advised by DCS Team It is more powerful than the previous one: New framework components New Archiving features New trending possibilities Updated Framework Components : fwCaen fwElmb fwWiener More reliable and complete Current developments (I)

D. EliaALICE week / DCS workshop - Sept 20, Wiener OPC Server Official release, version 1.6 for W2K and WXP Based on CanOpen protocol, Kvaser and NI Can cards supported. 2.OPCCanOPEN v.2.5+ New features with respect to previous version (2.5) Developed within ATLAS Improved performances combined with the new framework (created by Fernando Valera) and with software tools devoted to the reading and settings of both ELMB and CANbus Current developments (II)

D. EliaALICE week / DCS workshop - Sept 20, PVSS WIENER PL500 CAEN SY1527 ELMB CAEN HV OPC Server - Rel. 2.7-(July_03) Framework fwCaen WIENER OPC server CANbus adapter: PCI-CAN Kvaser card fwWiener OPC20CanOpen.OPC v 2.5+ CANbus adapter: PCI-CAN Kvaser card fwElmb VR BOARD SPD DCS for next TB (Oct-Nov ’04)

D. EliaALICE week / DCS workshop - Sept 20, PVSS ELMB WIENER PL500 CAEN SY1527 Half Stave A-D I/O bus HV power line LV power line Voltage Regulators Board LV power line PS-VR_B link TCP/IP CANbus TESTED DURING LAST TEST-BEAM on OCT_03 Pt-1000 LV PART IMPLEMENTATION EXPECTED TO BE USED during NEXT TB SPD DCS for next TB (Oct-Nov ’04)