Power, Cooling, Cables, Simulations of Heat Dissipation Short overview of ongoing work on these points Technical Coordination (Rolf Lindner et al.) Cooling.

Slides:



Advertisements
Similar presentations
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Advertisements

André Augustinus 16 June 2003 DCS Workshop Safety.
NSS Requirements Review: Utilities Michelle Everett Lab Coordinator Scientific Activities Division November 12, 2014.
LECC V. Bobillier1 Overview of LHCb Electronics installation aspects V. Bobillier; L. Roy; J. Christiansen CERN - LHCb.
18th March Richard Hawkings Humidity control in the ATLAS ID Richard Hawkings (CERN) JCOV meeting 18/3/04  Overview of humidity and associated gas.
The JPARC Neutrino Target
ATLAS muon chambers heat transfer efficient description RFNC – VNIITF SUE «Strela» Snezhinsk, 2003
Overview of Phobos Magnet Designed by Harald Enge Built by Danfysik Technical summary: –“Double dipole” design –15.5 cm air gap –Max. 2 Tesla field –378.
LHCb EP/LBD V. Bobillier 1 Cables and chicane mock up What we would like to define or test with the mock up: if the installation (of both cable.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
December 3, 20031Muon Integration Meeting B. Schmidt Introduction: The present architecture of the Muon System is based on the assumption that the maximal.
Global Design Effort Detector concept Plenary introductory talk IRENG07 Kurt Krempetz September 17, 2007.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.
CFD team supports CERN development 19 May M.Battistin CERN May 19 th 2011 C omputational F luid D ynamics team C omputational F luid D ynamics team.
Powering the main linac implications Daniel Siemaszko, Serge Pittet OUTLINE : Cost impact of power converters, power consumption and powering.
1 CO 2 cooling of an endplate with Timepix readout Bart Verlaat, Nikhef LCTPC collaboration meeting DESY, 22 September
TS/CV/DC CFD Team Computational Fluid Dynamics at CERN Michele Battistin CERN, Geneva - Switzerland.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
1 Outer Tracker Front-End Layout Distribution of Signals and Bias NIKHEF/HeidelbergOctober 2002.
Ken Wyllie, CERN Upgrade infrastructure, Feb LHCb Upgrade Electronics Infrastructure K. Wyllie & L. Roy.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
INTEGRATION OF THE CBM SILICON TRACKING SYSTEM U. Frankenfeld for the CBM collaboration supported by BMBF, EU-FP7 HadronPhysics3 and CRISP.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
D. Gasser ST/CV 1 Fluid distribution from UW85 Fully available now.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
Conduction and convection require the presence of temperature variations in a material medium. Although radiation originates from matter, its.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
LHCb Experimental Area Meeting V. Bobillier1 Earth network in UX85 experimental cavern.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 12/10/2005 LHCb - Install Meeting 12/10/05 TS/CV/DC Installations STATUS Ongoing works 1.chilled / mixed.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
GROUNDING, SHIELDING & COOLING ISSUES ON LHCb ELECTRONICS AT THE LHC PIT 8 V.Bobillier, J.Christiansen, G.Corti, D.Lacarrère, R.Lindner, L.Roy, E.Thomas,
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
CO 2 Controlling a 2-phase CO2 loop using a 2-phase accumulator
LHCb Install Meeting - 12 / 05 / 2004 Paolo Guglielmini - TS / CV LHCb Cooling of the sub – detectors INNER TRACKER TRACKER TRIGGER RICH 1 RICH 2 Status.
1 Cabling from sub-detectors Current thinking V.Bobillier L. Roy.
Summary of FEE-Integration Meeting LNF, Summary of the Frascati meeting on chamber & front-end integration on 10 September 2003, provided.
1 Antonio Romanazzi 3D CFD study of the ATLAS (UX15) ventilation system.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team1 Experimental Area Latest News from IP8  Radiation Shield – Upper & Front Parts  Structures.
1 ILD inner region integration meeting M. Joré – Introduction ILD inner region integration meeting Welcome words Charge of the meeting The current concept.
LHCb Muon Station Cooling Studies (done by Ricardo Antunes Rodrigues (ST/CV)) This simulations were made for the Muon Station 1, with the follow assumptions:
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
Upgrade activities DT-LHCb coordination meeting 14 March 2016.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
2 Dec 1998F Harris LHCb Trigger Meeting L0 Trigger - ‘Real Estate’ Considerations Current thinking for the size and location of L0 trigger electronics,
Paolo Guglielmini - TS / CV LHCb Install Meeting - 24/05/2006 LHCb - Install Meeting 24/05/06 TS/CV/DC activities for LHCb: - IT, TT, OT & SPD/PS, RICH.
CO 2 Cooling Plants for the LHCb upgrade LHCb infrastructure workshop February Burkhard Schmidt With input from Bart Verlaat, Paolo Petagna and Lukasz.
Status of HK Water 4th Open Meeting for Hyper-K January
Demineralised water cooling system
Detector Utility/Service Cavern
The LHCb Installation Story
Update on ‘Real estate’ for Level-0
Racks Coordination 09 September 2011 E. Negodin
ATLAS ITk CO₂ Cooling pipe routing CO₂ Meeting, 28 June 2016
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
rich1 magnetic shielding
Thermal behavior of the LHCb PS VFE Board
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
Presentation transcript:

Power, Cooling, Cables, Simulations of Heat Dissipation Short overview of ongoing work on these points Technical Coordination (Rolf Lindner et al.) Cooling and ventilation group (Daniel Gasser and Ricardo Rodrigues) 10 September 2003 Muon Electronics Meeting Burkhard Schmidt

Power Power reserved in UX85 Magnet:5MW Detector :2MW Power distribution defined

Detector Power Distribution [kW], without Magnet ItemDetector area Counting house area Barracks A/B + Racks close to detector Calorimeter19,23,5 IT/TT 20 Muon22,114,6 OT126 Rich 1&228,3 VELO7,618,7 VETO1,12 Total5393,1 Safety factor (PS, Cables, etc.)1,5 Total for the detectors with safety80140 DSS (1 rack) 1 ECS (4 racks) 45 Switches (5 Racks) 50 In barracks A and B (detectors) 236 Barracks D1 Max. per PCs Rack 12 Max. number of racks 47 ECS (1 rack) 10 In D1 barrack (PCs farm) 574 Item Detector area Counting house area Max. per PCs Rack 12 Max. number of PC racks 20 Total for future PC farm 240 Switches (2 racks) 20 ECS (1 PC rack) 12 TFC + L0DU (2 racks) 20 DSS (1 rack) 1 Spare for future switches, TFC, etc. 100 Spare for future detectors racks 90 In D2 barrack 483 General ST/CV 0 Gas (racks on platform near counting house) 10 Detector Cooling50 Pumps (for the VELO)5 Air conditioner (6*25kW for the barracks) 108 Light00 TOTAL & Total Power available (2MW)

Detector Cooling Counting House Area Detector Area Counting house air cooling capacity: 50kW

Cooling, Heat dissipation in the UX85 Cavern Large fraction comes from LV power supply cables To reduce dissipation:  move LV power supplies close to detector (constraints: radiation)  increase cable diameter (constraints: chicane through shielding wall) 11.5kW 55.9kW Counting house area Detector area

Detector cables passing through radiation shielding (Summary) System:Through Pass 84Through Pass 86 Power cables Signal cables Optical fibers Power cables Signal cables Optical fibers VELO VETO Vacuum Calorimeter Inner Tracker Trigger Tracker Outer Tracker Muon Magnet Rich Rich all numbers in dm 2 Through Pass 84 Through Pass 86 TOTAL (without the cable trays) Total cross section available through the chicanes: 70

As a result, the most critical part for detector services is the passage through the chicane of the radiation wall Construction of an 1:1 mock up of the chicane through the shielding wall The bare chicane exists in 157 Next step: mount cable trays and fill them with cables Chicane through radiation wall

350 mm >400mm Cabling, through chicane Counting house Detector

existing cable trays (from DELPHI general services) cable trays have to be added Status of cable trays

Cabling, through chicane  Space allocation per sub detector  Signal and Power separated  Packing factor: min 2 Pass x dm2 free space 300x100 Outer Tracker Outer Tracker Outer Tracker dm2 Power 100x100 Signal + Optical fiber Calori meter Calorimeter dm2 100x100 Power + Signal Optical fiber Mu on Muon dm2 100x50 Power + Signal Optical fiber Rich 2Rich dm2 Power 100x100 Signal + Optical fiber x100 Inner Tracker Inner Tracker dm2 Power 100x100 Optical + Signal Pass dm2 free space 300x100 Velo Power 7.49 dm2 Velo Signal 9.14 dm2 100x50 Veto dm2 Vacuum dm2 100x100 Signal + Power Rich 1 Rich dm2 Power 100x100 Optical + Signal Magnet dm2 100x100 Signal + Power Trigger Tracker dm2 100x50 Signal + Power +Optical Signal + Power +Optical

Rack distribution Counting house Behind radiation shielding Three floors Four barracks max. 150 racks 2 nd floor A3/B3 (Detector read out) 1 st floor D2 Ground floor D1 (PC farm)

LHCb Muon Station Simulation This simulations was made for the Muon Station 1, with the follow assumptions: The walls close to the RICH and ECAL systems are considered adiabatic, unless stated differently. The heat-flux in the moun chambers can only exit by the four smallest areas. The heat-flux in the muon chambers is equally distributed through the surfaces. Motivation: Understand temperature distribution for muon chambers and neighbouring detectors Studies provide input to develop “cooling system”

Boundary Location Global overview of the model Symmetry Inlet/Outlet

Boundary Location Region 1Region 2Region 3Region 4 Power [W]144 Area [m 2 ]0.494 Flux [W/m 2 ]292 Power [W]288 Area [m 2 ]1.494 Flux [W/m 2 ]193 Power [W]288 Area [m 2 ]4.716 Flux [W/m 2 ]61 Power [W]288 Area [m 2 ] Flux [W/m 2 ]16

With Pressure Conditions Inlet Temperature [ºC] 20 Max. Temperature[ºC] 40 Inlet Velocity [m/s]0.56 Inlet Temperature [ºC] 25 Max. Temperature[ºC] 41 Inlet Velocity [m/s]0.76

With Inlet at 1.0 m/s Inlet Temperature [ºC] 20 Max. Temperature[ºC] 29 Inlet Velocity [m/s]1.0 Inlet Temperature [ºC] 25 Max. Temperature[ºC] 34 Inlet Velocity [m/s]1.0

With Inlet at 2.0 m/s Inlet Temperature [ºC] 20 Max. Temperature[ºC] 24 Inlet Velocity [m/s]2.0 Inlet Temperature [ºC] 25 Max. Temperature[ºC] 30 Inlet Velocity [m/s]2.0

With Inlet at 1.0 m/s (2) Inlet Temperature [ºC] 20 Max. Temperature[ºC] 29 Inlet Velocity [m/s]1.0 Inlet Temperature [ºC] 25 Max. Temperature[ºC] 34 Inlet Velocity [m/s]1.0

With Inlet at 2.0 m/s (2) Inlet Temperature [ºC] 20 Max. Temperature[ºC] 24 Inlet Velocity [m/s]2.0 Inlet Temperature [ºC] 25 Max. Temperature[ºC] 30 Inlet Velocity [m/s]2.0

With pressure and inlet boundaries Inlet Temperature [ºC] 20 Max. Temperature[ºC] 38 Inlet Velocity [m/s]1.0 Inlet Temperature [ºC] 20 Max. Temperature[ºC] 38 Inlet Velocity [m/s]1.0 Rich and ECAL systems as adiabatic walls and open side Rich and ECAL systems as 20ºC walls and open side

With pressure boundaries and open side Inlet Temperature [ºC] 20 Max. Temperature[ºC] 38 Outlet Velocity [m/s]0.62 Inlet Temperature [ºC] 25 Max. Temperature[ºC] 37 Outlet Velocity [m/s]0.88 The boundary with Rich and ECAL systems are considered as 20ºC walls

With inlet at 1.0 m/s and pressure boundaries and open side Inlet Temperature [ºC] 20 Max. Temperature[ºC] 40 Outlet Velocity [m/s]1.0 Inlet Temperature [ºC] 25 Max. Temperature[ºC] 38 Outlet Velocity [m/s]1.0 The boundary with Rich and ECAL systems are considered as 20ºC walls

With inlet at 2.0 m/s and pressure boundaries and open side Inlet Temperature [ºC] 20 Max. Temperature[ºC] 30 Outlet Velocity [m/s]2.0 Inlet Temperature [ºC] 25 Max. Temperature[ºC] 32 Outlet Velocity [m/s]2.0 The boundary with Rich and ECAL systems are considered as 20ºC walls

Considerations about the air extraction system Flux exiting by the special boundaries [W] Flux IN [W] Predicted efficiency of the extraction system Model with adiabatic walls and open side % Model with 20ºC walls and open side % The considered efficiency of the heat exchanger as 80%