22/03/11FV 1 NA62 DCS CAN bus lines. Short reminder General properties of CAN bus o Up to 64 nodes on one bus o Different devices need different buses.

Slides:



Advertisements
Similar presentations
S.PopescuAlice DCS workshop, Colmar, OPCs latest news Iseg OPC server Wiener OPC server.
Advertisements

Bus topology refers to a single cable that connects all the work stations, servers, printers and other devices on the network. The cable runs from one.
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
March 16, 2004Alice controls workshop, S.Popescu Low Voltage and High Voltage OPC status and plans.
NA62 GTK Cables & Patch Panels. TCC8_GTK1 TCC8_GTK2_GTK3.
DCS aspects of TDAQ racks in USA15 and SDX1 Y. Ermoline et al. ATLAS Week, CERN, 15 February 2005.
NA62: Unlocking the Zeptouniverse Timothy Khouw and Madeline McGaughey Supervisor: Dr. Augusto Ceccucci.
Status of DCS for TDAQ racks Y. Ermoline et al. ATLAS TDAQ Week, CERN, 27 April 2005.
January 9, 2008BAE In-Vehicle Networking Lecture 2 CAN Physical Layers ISO 11898, ISO Part 2, J ,12,13 Physical Layers BAE
Identifying SLC 500™ System Components. SLC 500 System Options  The SLC 500 line of processors comprises both fixed and modular processor styles.:
Susanne Kersten, Wuppertal University November 21/22, 2013.
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
S.Sergeev (JINR). Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system.
Readout electronics for the MUV detectors R. Fantechi 28/3/2012.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
15/12/10FV 1 Common DCS hardware. General ideas Centralized system: o Common computers. Detector dedicated computers (with detector participation) only.
Electronic Systems Support CAN Branch PSU Designed: Bjorn Halgren PH-ESS Responsible:Paul Harwood.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
“Status of TDAQ for the 2012 runs” Gianluca Lamanna (CERN)
D0 Workshop Bagby, Foglesong John Foglesong Run 2B SMT Low Voltage Power The present location of the SMT DC power supply units creates a problem.
“TDAQ for 2012 runs” Gianluca Lamanna (CERN) Annual review meeting
André Augustinus 6 October 2005 Cabling, Interlocks, Racks Some remarks.
High Voltage System outside Drawers Tilecal upgrade meeting at Stockholm (3-5 June 2013) François Vazeille on behalf of Roméo Bonnefoy, Christian Fayard,
André Augustinus OPC news, versions to use on behalf of Sorina Popescu.
Proposal for optical and cable network of NA62 trigger system Marián Krivda 1), Cristina Lazzeroni 1), Vlado Černý 2), Tomáš Blažek 2), Roman Lietava 1)2)
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
October 9th 2006ALICE WEEK - DCS WorkShop1 DEVICE USER SUPPORT OVERVIEW - Presentation - First Line Support - Reference System - Current Developpement.
NA62 TDAQ WG Meeting News and usual stuff M. Sozzi CERN – 29/5/2009.
09/02/11FV 1 Status of “common crate” project. Events happened after the December meeting Quotations' story o Bin (9ULHC version 2, 11U high,
1/12/2010 R. CIARANFI 1 NEW NINO BOARD FOR RICH OLD AND NEW LOGISTIC NEW BOARD DESCRIPTION NEW MODULARITY 32 CH NEW FORM FACTOR FRONT END AREA AND DAQ.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
19/05/10FV 1 HyTec crate – DCS integration issues.
ISEG HV power supplies for NA62 R. Fantechi 6/4/2011.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
NA62 straw tracker DCS Straw tracker overview Bulk power supply Power supply distribution and monitoring LV + monitoring HV Temperature monitoring Gas.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
ATLAS DCS ELMB PRR, CERN, March 2002Fernando Varela ELMB Networks CAN/CANopen Interoperability of the ELMB Usage of the ELMB in ATLAS ELMB Networks Full.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
European Organization for Nuclear Research DCS remote control in NA62: Equipment & Control Integration. Mathias Dutour NA62 Collaboration 9th December.
Preparation for production phase Web – New web with HV pigtail qualified (?) – Installed on 2 views in Technical run Very little effect on noise; detector.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
Status of the NA62 network R. Fantechi 23/5/2012.
NA62: The LKr Electronics Matt Huszagh. Installation & Setup (1/5) Crate Setup 8 vertical columns of 4 crates Almost all installed.
TDAQ news and miscellaneous reports M. Sozzi NA62 TDAQ WG meeting CERN – 13/7/2011.
ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart1 Embedded Local Monitor Board ELMB  Context  Aim  Requirements  Add-ons  Our aims of PRR.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
D. EliaALICE week / DCS workshop - Sept 20, SPD Power Supply System DCS status Domenico Elia INFN Bari.
10/09/10FV 1 News and observations from Brussels' meeting.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
1 COSTING DCS WS L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
V.Duk, INFN Perugia1 CHOD/NHOD status Viacheslav Duk, INFN Perugia Ferrara,
09/09/10FV 1 NA62 common crate project. Crates survey result VF2 09/09/10 VME High populated TELL1 High populated TELL1 (Spare) Low populated TELL1 Low.
01/09/ KTAG 5/8 sectors equipped DCS system in pogress DAQ commissioning in progress Test pressure scan this week (t.b.c) 01/09/20142.
The New CHOD detector for the NA62 experiment at CERN S
DCS, DOMs and interplay with Run Control
Safety Clearance of NA62 01/09/14 FV.
DCS WG report 9/09/11 FV.
DCS WG report 9/09/11 FV.
Francesco Gonnella NA62 Collaboration meeting Washington DC, U.S.A.
Presentation transcript:

22/03/11FV 1 NA62 DCS CAN bus lines

Short reminder General properties of CAN bus o Up to 64 nodes on one bus o Different devices need different buses (WIENER, ISEG, ELMB,?) o Transition rate depends on the length of cable (from 1 Mbit/s for 25m to 10 kbit/s for 5000m) o Characteristic impedance 120 Ohm, termination on both ends o The starting point of the CANbus cables is DCS rack(s) in the PC farm area (b.918) ISEG CAN bus o One module has two CAN-nodes, crate is one node. So one fully populated crate with 8 Modules EDS n_504 equals 17 CAN-nodes o Not more than 3 crates per cable o Peak PCAN-PCI two channel cards VF2 22/03/11

Short reminder -2 ELMB CAN bus o In addition to the CAN bus signals the cable also provide the power for the ELMBs (12V) o Thick cable (SCEM code ) will be used for long distance to minimize the voltage drop, thin cable (SCEM code ) for local distribution + junction box “a la ATLAS” (has to be investigated) o Fixed double cable “PHOENIX CONTACT” connectors o Kvaser PCIcanx 4xHS cards WIENER CAN bus o Kvaser PCIcanx 4xHS cards o TCP/IP option for the WIENER equipment control is under consideration. Price for one fan-tray unit CAN bus: 627 EURO TCP/IP: 755 or 991 EURO In total we will have about 60 crates VF3 22/03/11

Experimental Area VF4 22/03/11 PC farm area

ISEG CAN bus lines VF5 22/03/11 GT 854 (to PC farm) GT 853 (to NA48 CR) MUV, SAV LAV 12, 11, 10 LAV 9, 8, 7 LAV 6, 5, 4 LAV 3, 2, 1 CEDAR (?)

ISEG CAN bus lines VF6 22/03/11 LAV 3, 2, 1 CEDAR (?)

WIENER crate control CAN bus lines VF7 22/03/11 GT 854 (to PC farm) GT 853 (to NA48 CR) LKr All other crates in EB, LAV12, LAV11, LAV10 Straw tracker LAV 9, 8, 7, 6, 5, 4, 3, 2, 1, CHANTI, GTK (?), CEDAR

WIENER crate control CAN bus lines VF8 8/02/11 LAV 5, 4, 3, 2, 1, GTK (?), CHANTI, CEDAR

ELMB CAN bus lines VF9 8/02/11 LKr RICH, MUV, SAV STRAW 1 STRAW 2 STRAW 3 STRAW 4 CHANTI, GTK3, GTK2, GTK1, CEDAR

Other CAN bus lines o CAN bus cables for LAV thresholds (one cable per station) o Gas systems (one cable per system ?) o CEDAR NINO front-end cards control (one cable)? o RICH NINO front-end card control ? VF10 22/03/10