Solar Probe Plus FIELDS Team Meeting Management 7/07/2015.

Slides:



Advertisements
Similar presentations
NGAO Management Update Peter Wizinowich NGAO Meeting #11 November 5, 2007.
Advertisements

GLAST LAT Project 1S. Ritz Purposes of the Data Challenges “End-to-end” testing of analysis software. –define the ends –define the tests (what is success?)
Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
Telecom 1 9/17/2012 SPP/FIELDS Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
Solar Probe Plus FIELDS ICU/FSW Peter R. Harvey Dorothy Gordon –ICU Will Rachelson – FSW Dec 1, 2012.
FIELDS iCDR Solar Probe Plus FIELDS Instrument CDR Introduction 1Peter Harvey.
SPP FIELDS DFB Quarterly June 2014 Solar Probe Plus FIELDS Instrument Quarterly Digital Fields Board 1.
Selda HeavnerFIELDS iPDR – Antenna Electronics Board Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Board Selda S. Heavner U.C. Berkeley
Solar Probe Plus FIELDS Quarterly Management Nov 15, 2012.
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
18-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , Package Dave Curtis, PFP Package Manager Mars.
Timothy QuinnFIELDS iCDR – EGSE Solar Probe Plus FIELDS Instrument CDR Electrical GSE Timothy Quinn UCB 1.
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
D. GordonFIELDS iCDR – DCB Solar Probe Plus FIELDS Instrument CDR DCB Dorothy Gordon Space Sciences Lab, UC Berkeley 1.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
Solar Probe Plus FIELDS Team Meeting Management Items 08/05/2014.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Jerry Kim, SSL Mechanical.
BonnellSPF AEB CDR PEER REVIEW – RESPONSES Solar Probe Plus FIELDS Antenna Electronics Board AEB I-CDR Peer Review Responses (rev A, 13 Jan 2015) J. Bonnell.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
Plante/HarveyFIELDS iPDR – Flight Software Solar Probe Plus FIELDS DCB FSW Development Plans Barbara Plante Peter Harvey University of California 1.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
SPP FIELDS DFB Quarterly June 16, 2015 Solar Probe Plus FIELDS Instrument Quarterly Q Digital Fields Board (DFB) 1.
Solar Probe Plus Fluxgate Magnetometer QSR – Oct SPF MAG Quarterly Report – Oct 2014 The MAG EM1 (EQM) (board and frame at right) was successfully.
Jun 4, SPP FIELDS Updated block diagrams Fault Tolerant Design.
Dec 1, FIELDS Top Level Requirements Review S. Harris (UCB)
FIELDS iCDR – RFS Analog Dennis Seitz 1 Solar Probe Plus FIELDS Instrument CDR RFS Analog Dennis N. Seitz UC Berkeley SSL
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
Solar Probe Plus A NASA Mission to Touch the Sun Mission Operations Review News Elena Adams 7/16/2015.
NameFIELDS iPDR – Subject Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Box Selda S. Heavner U.C. Berkeley 1.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
Solar Probe Plus FIELDS Fluxgate Magnetometer QSR – June 2015 June 16, SPF MAG Quarterly Report – June 2015 MAG FM1 electronics PCB assembled (see.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Flight Software Summary Peter Harvey Space Sciences.
June 16, 2015SPP/FIELDS SOC CDR: Integration & Test SPP/FIELDS Integration and Test SOC Critical Design Review Keith Goetz University of Minnesota
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB FSW Requirements Peter Harvey University of California 1.
Timothy QuinnFIELDS SOC CDR – CTG Solar Probe Plus FIELDS SOC CDR Command, Telemetry, and Ground Support (CTG) Timothy Quinn UCB 1.
1 Project Management Software management is distinct and often more difficult from other engineering managements mainly because: – Software product is.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB Flight Software Design Peter Harvey University of California 1.
THEMIS Instrument Pre-Environmental Review 1 UCB 5/02/2005 THEMIS Instrument Pre-Environmental Review Project Status May 2, 2005 Peter R. Harvey THEMIS.
FIELDS iPDR – RFS Analog Dennis N. Seitz 1 Solar Probe Plus FIELDS Instrument PDR Radio Frequency Spectrometer Analog Dennis N. Seitz UC Berkeley SSL
FM1 Instrument Suite Pre-Ship Review (PSR)AGENDA 1 UCB, September 21, 2005 THEMIS T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS.
Solar Probe Plus FIELDS Instrument PDR Management Peter Harvey, PM Lindsey Hayes, DPM University of California
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
1 PFP Team Meeting Particles and Fields Package Weekly Team Meeting, SSL April Dave Curtis, PFP PM.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
SPP FIELDS DFB Quarterly November 21, 2014 Solar Probe Plus FIELDS Instrument Quarterly Digital Fields Board (DFB) 1.
BonnellFIELDS iCDR – AEB Solar Probe Plus FIELDS Instrument CDR Antenna Electronics Board AEB J. Bonnell, D. Seitz UC Berkeley, SSL
Solar Probe Plus – FIELDS SCM FM2 Instrument Pre-Ship Review
Solar Probe Plus FIELDS Pre-AGU Science Meeting
Solar Probe Plus – FIELDS V1234 PA/Antenna Instrument Pre-Ship Review
Solar Probe Plus FIELDS MEP iPSR SOC Marc Pulupa April 10, 2017
Solar Probe Plus – FIELDS Main Electronics Package
SPF MAG Quarterly Report – Feb 2015
Solar Probe Plus FIELDS
Keith Goetz University of Minnesota
Solar Probe Plus FIELDS
Solar Probe Plus – FIELDS Main Electronics Package
EIDP Status. Solar Probe Plus FIELDS Main Electronics Package iPSR Management Apr 10, 2017.
Solar Probe Plus FIELDS
Agenda. Solar Probe Plus FIELDS Main Electronics Package iPER Agenda Feb 2, 2017.
Solar Probe Plus – FIELDS Verification Instrument mini-PER (V5)
Solar Probe Plus – FIELDS V1234 PA/Antenna
FIELDS Keith Goetz Solar Probe Plus A NASA Mission to Touch the Sun
Solar Probe Plus FIELDS Main Electronics Package iPER EMC Feb 2, 2017
Solar Probe Plus FIELDS Instrument PSR - MEP Introduction
0.0 Instrument Suite Name Presenter’s name
<<Project Name>> – Engagement Status
Instrument Preliminary Design Review (I-PDR) June 27th, 2005
Presentation transcript:

Solar Probe Plus FIELDS Team Meeting Management 7/07/2015

Agenda 1. Science (Bale) a. FIELDS Paper 2. Management (Harvey) a. Deliverables b. EM Test Schedule c. ISSUES d. Upcoming Dates 7/17: AEB PWB review 7/28: Post EM Completion Review 3. Systems (Goetz) a. RFAs b. Flight Drawings Status c. Commissioning 4. Mechanical/Thermal - Bill D., David G., Paul Turin, Millan D. a. MEP b. Antennas c. Thermal 5. Electrical Status DCB-RFS, FSW Daughterboard, Alignment Jig AEB, PREAMPs TDS-LNPS, FSW DFB MAG SCM 6. Ground Support - Quinn 7. SOC ( Pulupa )

DELIVERABLES SCHEDULE Updated verification matrix FIELDS2 input for Cmd & Telemetry & Flight Rules FIELDS2 Preliminary Software Test Plan L4 Requirements Update

EM TESTS Main Electronics Antenna Electronics completed all EM tests Antenna EM Thermal Balance continues to slip badly with no reported progress in June. Antenna coatings is an issue

ISSUES Source: SPF_MGMT_026_ISSUES.xlsx

REVIEWS Reviews: SOC CDR - COMPLETE  Date: 6/16/15  RFAs  Identify Software ReUse  Define Pre-Encounter Data Reqs  Define Tohban role  Identify Major Contingencies  Define SSR Management “Post-EM Testing”  28 July 2015  Location: Webex

SCHEDULE MILESTONES Source: SPF_MGMT_021_MILESTONES.xlsx

FM Schedule (iCDR)