Presentation is loading. Please wait.

Presentation is loading. Please wait.

FM1 Instrument Suite Pre-Ship Review (PSR)AGENDA 1 UCB, September 21, 2005 THEMIS T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS.

Similar presentations


Presentation on theme: "FM1 Instrument Suite Pre-Ship Review (PSR)AGENDA 1 UCB, September 21, 2005 THEMIS T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS."— Presentation transcript:

1 FM1 Instrument Suite Pre-Ship Review (PSR)AGENDA 1 UCB, September 21, 2005 THEMIS T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS RESOLVING THE MYSTERY OF WHERE, WHEN AND HOW AURORAL ERUPTIONS STARTTHEMIS FM1 Instrument Pre-Ship Review University of California, Berkeley September 21, 2005

2 FM1 Instrument Suite Pre-Ship Review (PSR)AGENDA 2 UCB, September 21, 2005 Coffee, and food at Silver Addition Main Entrance (outside) Splinter room in Silver Annex Conference Parking Passes, see Daniele Other issues, see: Vassilis Angelopoulos or Peter Harvey Silver Addition Samuel Silver Space Sciences Laboratory Silver Annex Main Conference Room Conference Rooms For maps, etc. go to http://www.ssl.berkeley.edu/

3 FM1 Instrument Suite Pre-Ship Review (PSR)AGENDA 3 UCB, September 21, 2005 Agenda AGENDA

4 FM1 Instrument Suite Pre-Ship Review (PSR)AGENDA 4 UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTRODUCTION Peter R Harvey THEMIS Project Manager University of California - Berkeley

5 FM1 Instrument Suite Pre-Ship Review (PSR)AGENDA 5 UCB, September 21, 2005 Mission Schedule CY 2005 MILESTONES CY 2004 THEMIS Bus, Instrument & Mission I&T Schedule STATUS AS OF: 9/01/05 MISSION MGR. : FRANK SNOW MAJOR REVIEWS CY 2006 1 P1 INTEGRATION & TEST BUS/INSTRU MECH & ELEC I&T & C/O (UCB) BUS MECH & AVIONICS BUILD UP (Swales) NDJFMA PROBE SUBSYSTEM HARDWARE 2 P2 INTEGRATION & TEST 3 P3 INTEGRATION & TEST 4 P4 INTEGRATION & TEST 5 P5 INTEGRATION & TEST 10/12 MECH BUILDUP 7 SETUP / PROBE VIB / PCA INTEGR. (JPL) 8 PCA VIB / ACOUSTICS / THERMAL (JPL) 9 11 LAUNCH PROCESSING/LAUNCH INSTRUMENT CDR 4/19-20 MISSION CDR 6/14-18 CRR 2/04 4/06-08 CR @ HQ FGM/SCM CDR 4/22 INSTRU COMPL 9/21 9/28 11/01 PROJECT MGR. : PETER HARVEY 5/02 INSTRU COMPL 11/01 ENVIRONMENTAL TEST & CLOSEOUTS (JPL) 4/20 P2-P5 PER 6/20- 21 PSR 10 MECH H/W -- Critical Path H/W -- Project Reserve -- Instrument Slack LEGEND -- Intermediate Slack 26 DAYS 10/19 10 DAYS 8/11 5/16 8/10 FLT 1 BAU 11/17 6 P2- P5 SHIP TO JPL PROBE SUBSYSTEM HARDWARE MJ JANDJFMA MJ J A SOSO 6/09 MECH BUILDUP INSTRU COMPL 9/28 2/13 MECH BUILDUP 10/17 MECH H/W MECH BUILDUP 1/26 4/07 MECH BUILDUP 11/23 SHIP to JPL 4/1 9 PROBE SUBSYSTEM HARDWARE 4/25 MISSION RESERVE MAG & MASS PROP (JPL) / SHIP 5/19 PCA INTEGR PROBE VIB 5/31 6/13 PROBE THERMAL PCA VIB/ACOUSTICS 6/21 MAG / SPIN BAL./ P1-5 PACK 6/22 12/05 FLT 4 BAU 11/03 FLT 5 BAU FLT 3 BAU MECH H/W 1/10 10/20 AVIONICS B/U Swap out 7/18 9/09 9/23 10/12 IRU 9/14 12/15 BAU EDU# 1 FLT 2 BAU SHIP to UCB AVIONICS B/U P1 Test Review BUS/INSTRU MECH & ELEC I&T & C/O (UCB) BUS MECH & AVIONICS BUILD UP (Swales) BUS/INSTRU MECH & ELEC I&T & C/O (UCB) BUS MECH & AVIONICS BUILD UP (Swales) BUS/INSTRU MECH & ELEC I&T & C/O (UCB) BUS MECH & AVIONICS BUILD UP (Swales) BUS/INSTRU MECH & ELEC I&T & C/O (UCB) BUS MECH & AVIONICS BUILD UP (Swales) 9/20 BAU EDU#2 AEB IRU 1/25 P1 Test Review 3/14 3/01-15 PROBE I&T & C/O PROBE I&T 3/28 SHIP to UCB AVIONICS B/U Swap out 2/09 AEB SHIP to UCB 2/14 AVIONICS B/U AEB & IRU MISSION CONTINGENCYIIRT CONTINGENCY SHIP to UCB AVIONICS B/U PROBE I&T & C/O SHIP to UCB ASTROTECH C/O 1/09 2/22 2/10 2/13 2/23 ENVIRONMENTALS P1 PER AEB 11/13 2/08 SHIP to JPL 3/15 3/01 12/12- 13 12/22 1/04 3/09 3/10 PROBE I&T & C/O FM1 Instruments Probe Delivery

6 FM1 Instrument Suite Pre-Ship Review (PSR)AGENDA 6 UCB, September 21, 2005 RFA Status RFAs In Work

7 FM1 Instrument Suite Pre-Ship Review (PSR)AGENDA 7 UCB, September 21, 2005 RFA Status Complete w/o Concurrence

8 FM1 Instrument Suite Pre-Ship Review (PSR)AGENDA 8 UCB, September 21, 2005 RFA Status Complete w/o Concurrence


Download ppt "FM1 Instrument Suite Pre-Ship Review (PSR)AGENDA 1 UCB, September 21, 2005 THEMIS T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS."