VEA’s proposal of automated assembly system WP6 meeting, 16/01/14.

Slides:



Advertisements
Similar presentations
Manufacturing Processes lab I Running a lathe machine
Advertisements

DeGarmo’s Materials and Processes in Manufacturing
Piston Assembly Gas and Inertia forces are applied. Gas and Inertia forces are applied. Both of these forces are variable in Both of these forces are variable.
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
Manufacturing Automation
Mu2e Production Target Remote Handling By: Michael R. Campbell, Fermi National Accelerator Laboratory, , System Layout Basic.
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 Stave.
1 MC Assembly via Test Cell Crane FPA Stage 3 Peer Review August 12, 2005 T. Brown.
Status Update on Mechanical Prototype in Rome November 6,
Multipole Girders - Alignment & Stability (Multipole Girder Alignment technology & R&D) S. Sharma ASD: J. Skaritka, D. Hseuh, V. Ravindranath, G. Miglionico,
PERSISTENT SURVEILLANCE FOR PIPELINE PROTECTION AND THREAT INTERDICTION Micromachining of Inertial Confinement Fusion Fast Ignition Targets Michael Mauldin.
Unit 4 Machine Tools Machine Tools (Basic Elements, Working principle
MICE Alignment and Support Structure Tony Jones and Yury Ivanyushenkov Engineering Department RAL.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Micro-Usmd Rework These are very small BGA style components.
AUTOMATIC LATHES These are machine tools in which components are machined automatically. The working cycle is fully automatic that is repeated to produce.
Integration and Alignment of Optical Subsystem Roy W. Esplin Dave McLain.
IB stave assembly A. Di Mauro, C. Gargiulo, J. Van Beelen ITS-MFT mini-week
Automated HIC assembly A. Di Mauro ITS-MFT mini-week
SQXF Shell & Yoke Assembly Procedure
1. Presentation Gorosabel Group is a modern and innovative business group with a steady expansion path and has an experience of over 50 years in business;
Hybrid Integrated Circuit
NuMI NBI2006 September 9, 2006 NuMI Repairs for Hot Components Jim Hylen / FNAL Page 1 NuMI Repairs for Hot Components (1 sievert = 100 rem) Problem On.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Flat Saw Training. Flat Saw Sizes –Low Horsepower Blade diameters range from 8” (200mm) to 18” (450mm) Power ranges from 4 to 25 horsepower.
Update on tendering for HIC automatic assembly system A. Di Mauro ITS Upgrade Plenary,
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
WP6 meeting 30/07/2013. Status of flex prototypes production New laser soldering tests Discussion on mass production schedule.
Dmitry Gudkov BE-RF-PM CLIC Module Working Group Engineering design of the adjustable supporting system for DBQ.
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 StaveMarco Kraan Paul Kuijer.
WP6 status report A. Di Mauro (CERN) ITS plenary meeting
Alignment Tools Used To Locate A Wire And A Laser Beam In The VISA Undulator Project Wire Finder CALIBRATION A special fixture was constructed to calibrate.
Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06.
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 1 Maintenance and Building Conceptual Approach L. Waganer and R. Peipert The Boeing Company 4 October.
WOOL COMBING  After worsted carding the wool sliver is processed through a number of gill boxes before combing  Gilling improves fibre alignment and.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Max-Planck- Institut für Plasmaphysik U. Schultz, Assembly- Technology Working package Port assembly 1 Working package Port assembly Uwe Schultz.
LARP Collaboration Meeting Racetrack Coil Fabrication
PRESENTED BY SUBMITTED TO ANUJ KUMAR SRIVASTAVA Mr. DEEPAK SHARMA ME-1 3 rd YEAR COORDINATOR AND FACCULTY ROLL NO IMSEC MILLING.
WP7&8 Progress Report ITS Plenary meeting, 10 June 2014 LG, PK, VM, JR.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
Fluid Mechanics for Chemical Engineers Arif Hussain (Lecturer)
WP F/L Dom production. KM3Net meeting 2012 Erlangen - Edward Berbee - Nikhef22/06/20121.
Sébastien MICHALMarch Sébastien MICHALMarch 2009 EES 1 GROOVE EES 1 laid on table to be milled EES 1 laid on table to be milled –Move horizontally.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
New single-chip “box” to test laser soldering in vacuum WP6 meeting, 16/01/14.
BM&N STS ladders assembly in VLHEP
DRILLING Dept. of Mech & Mfg. Engg..
Planning for Proto-DUNE PD Installation and Cabling at CERN
ATLAS pixel module assembly flow
Tramming the Toolhead on a Vertical Milling Machine
MQXC Nb-Ti 120mm 120T/m 2m models
conventional rear wheel drive, a beam axle assembly
Update on Pavia MM mechanical prototype
TEST MODULE WG Cradles for CLIC module supporting system
Global Experience…Local Solutions
SNS COLLEGE OF ENGINEERING
Report on construction of LP2 spaceframe endplate
Horizontal Milling Operations
FNAL Production Experience
Station and Module Support Frames
Putting for Perfection
Cryomodule Assembly Plan
Panel Riveting Dept. Adjustable Part Holding Fixture
Machine Tools Machine Tools (Basic Elements, Working principle
Presentation transcript:

VEA’s proposal of automated assembly system WP6 meeting, 16/01/14

TOP VIEW SIDE VIEW X or Y Linear Positioning Stage -200 mm/s  m unidirectional repeatability -0.2  m bidirectional repeatability 2 Z LPS with 0,1 μm unidirectional repeatability Z LPS for small loads with 0,1 μm unidirectional repeatability

MOBILE TABLE TOP VIEW Ultra high-precision rotation stage - ± 1.7  rad ( o ) repeatability The assembly frame is positioned on the rotation stage and it has vacuum suction to hold components. 3

SIDE VIEW An aluminium bridge structure will support all actuators to manipulate the various components and the laser head 4

STEP 1: CHIP PLACEMENT The "chip manipulator" consists of a "chip vacuum grip" and a LPS to perform vertical movements (Z- axis). -The "mobile table" moves until the "chip manipulator" is above a given cell of the "chips pallet". -The "chip manipulator" is lowered and the "chip vacuum grip" takes a chip from the cell. -The "chip manipulator" is raised and the "mobile table" moves under the camera 1 to measures the “reference” position of the chip. -The "mobile table" and the "rotation stage" positions are then adjusted in order to deposit the chip from the "chip manipulator" in the correct position on top of to the “assembly frame". -The operation is repeated 9 (or 14) times. TOP VIEW 5

STEP 2: FPC and balls grid placement TOP VIEW The "FPC manipulator" consists of a "FPC vacuum grip" and a LPS to perform vertical movements (Z-axis). -The "mobile table" moves until the "FPC manipulator" is above the "FPC stack". -The "FPC manipulator" is lowered and the "FPC vacuum grip" takes a FPC from the "FPC stack". -The "FPC manipulator" is lifted and at the same time the "FPC vacuum grip" expands so as to stretch the FPC. -The "mobile table" moves under the cameras 2 and 3 to measure the reference position of the FPC. -The "mobile table" and the "rotation stage" positions are then adjusted in order to deposit the FPC in the correct position on top of the "assembly frame". -The same operations described above are replicated to place the "balls grid" The piezoelectric micro LPS located in the "FPC vacuum grip" to stretch the FPC eliminating any small dimples. The excursion is 300 μm. TO BE CHECKED: alignment procedure 6

STEP 3: soldering balls placement TOP VIEW The “soldering balls (SB) manipulator” consists of a “SB vacuum grip”, a LPS to perform vertical movements (Z-axis), and a LPS to perform horizontal movements (X axis). The “SB vacuum grip” can load a group of balls or also a single ball (in case of missing ball in the deposited group). -The “SB manipulator” moves on top of the SB distributor. -The “SB manipulator” is lowered and the “SB vacuum grip” loads an ordered group of 12 balls from the “SB distributor”. -The “SB vacuum grip” is lifted and moved to the centre of the table; during this movement it passes over the camera 4 which controls the presence and the correct positioning of all the balls. -The “mobile table” and the “rotation stage” are then adjusted in order to deposit the balls in the correct position on top of the “balls grid”. 7

THE SOLDERING BALL DISTRIBUTOR TOOL 8 The "balls distributor" is composed of an aluminium vessel machined from a full piece where the grooves (10% larger than ball diameter) are formed for the individual spheres. There is a "spare ball cannel" to take a single ball with the "single ball vacuum grip" that is included in the "vacuum grip balls." The "balls distributor" is provided with a movement of controllable vibration which allows a uniform distribution of the spheres. Each "single ball cannel" has a slit of 0.1 mm that discharges any residual tin-lead on a container placed under the "balls distributor". Below is a drawing, darker areas indicate a deeper incision.

9 STEP 4: soldering TOP VIEW The laser head is mounted in the support bridge with a vertical LPS stage. - The "mobile table" moves in order to position each hole under the laser head, after soldering each single ball, the camera mounted on the laser head (connected with the vision system) analyses every single soldering. STEP 5: soldering balls grid removal - The "mobile table" moves in order to position assembly frame under the FPC manipulator, the balls grid is removed and put back in its container. STEP 6: HIC removal - The assembly frame holding the HIC is removed by the operator.

10 ESTIMATED CYCLE TIME FINAL CONSIDERATION by VEA The proposed system allows obtaining the required precision better than 5 μm. The structures are simple and also the mathematical model to compensate errors due to thermal expansion is quite simple. This machine allows the assembly of both modules for the inner layer (1 x 9 chips), and for the outer layer (2 x 7 chips) simply replacing the "assembly frame ", the "FPC stack" and the "balls grid container", these will be equipped with locating pins.