1 Earned value analysis Planned value (PV) or Budgeted cost of work scheduled (BCWS) – original estimate of the effort/cost to complete a task (compare.

Slides:



Advertisements
Similar presentations
Connoizor Enabling Performance for Businesses through Software Website: Contact:
Advertisements

Budget Management. 57 Budget Management Budget Development Good scheduling skills and abilities Understanding of the project scope Well developed WBS.
 Costs are planned, measured, analyzed and controlled in terms of project activities.  Expenditure for any activity is incurred evenly over the duration.
© The McGraw-Hill Companies, Software Project Management 4th Edition Monitoring and control Chapter 9.
Monitoring and Control Earned Value Management (EVM)
CSSE Oct.2008 Monitoring and reporting project status Chapter 10, pages
BTS730 Cost Management. Average cost overrun: –1995 CHAOS study: 189% of the original estimates –2001 study: 145%
Irwin/McGraw-Hill ©The McGraw-Hill Companies, 2000 Chapter 13 Progress and Performance Measurement and Evaluation.
Chapter 10: Monitoring and Controlling Change
Monitoring and Controlling
Earned Value Project Management: a powerful tool for software projects
Project Monitoring and Control. Introduction Goal: ensuring that the project is on time and on budget and/or highlight any deviation from the plan Areas.
Project Cost Management J.-S. Chou, P.E., Ph.D.. 2 Learning Objectives  Explain basic project cost management principles, concepts, and terms.  Discuss.
Project Evaluation and Control
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
Project Cost Management
Earned Value Management
Progress and Performance Measurement and Evaluation CHAPTER THIRTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Project Evaluation and Control
Project Management 6e..
Project Management in Practice
Earned Value Analysis by John Cornman. Introduction “Earned Value Analysis” is an industry standard way to measure a project’s progress, forecast its.
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Project Management Methodology Project monitoring and control.
Progress and Performance Measurement and Evaluation CHAPTER THIRTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 13: Progress and Performance Measurement and Evaluation
1 ev14a Interactive Session 4 u Tuesday, July 17 7pm to 10pm u Build a sqa plan for the dental office software u Assume a 3-person, development team, a.
Understanding Earned Value Analysis
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall13-1 Project Evaluation and Control Project Termination and Closeout Chapter
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Software Project Management (SPM)
EARNED VALUE MANAGEMENT (EVM)
Earned Value SOS section Sp8Jan24ev3. Earned Value Analysis One approach to measuring progress in a software project is to calculate how much.
1 Project Management – Unit 4 – Part 1 Cost Model ACWP: Actual cost of work performed: Actual costs in performing the work so far. BCWP: Budgeted cost.
Management & Development of Complex Projects Course Code MS Project Management Earned Value Concepts Lecture # 19.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall13-1 Project Evaluation and Control Chapter 13.
Project Management 6e..
Introduction To Earned Value November 14, Definition Earned Value is a method for measuring project performance. It compares the amount of work.
Where Module 04 : Knowing Where the Project Is 1.
PMP Study Guide Chapter 11: Controlling Work Results.
EARNED VALUE  Earned Value Management Systems  Earned Value Analysis.
Agenda ‒ Cost Management ‒ Cost Budgeting ‒ Cost Control Learning Goals 1.Cost Control 2.Earned Value Management.
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Earned Value Analysis by Miles M. Hamby, PhD Copyright©2014 Miles M
PROJECT MANAGEMENT AND CONTROL
Project Management (x470)
CHAPTER:7 Project Cost Management
Earned Value Management
PROJECT MANAGEMENT AND CONTROL
Project evaluation and control
5. Cost resources & PLAN DURATION
Earned Value Management
Project Cost Management
Progress and Performance Measurement and Evaluation
Earned Value - What is it
Understanding Earned Value Analysis
Understanding Earned Value Analysis
An Introduction to Earned Value Performance Measurement
Earned Value Measures Planned Value (PV) Earned Value (EV)
فرآيند كنترل پروژه.
Project Evaluation and Control
Earned Value Management
5. Cost resources & PLAN DURATION
Schedule and Cost Variance Problem
5. Project PLAN & cost estimation
Monitoring and Controlling
Understanding Earned Value Analysis
Project Evaluation and Control
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
Presentation transcript:

1 Earned value analysis Planned value (PV) or Budgeted cost of work scheduled (BCWS) – original estimate of the effort/cost to complete a task (compare with idea of a ‘price’) Earned value (EV) or Budgeted cost of work performed (BCWP) – total value credited for the work completed at this time

Common methods of assigning EV are –0/100 technique –50/50 technique –Milestone technique The baseline budget Monitor the earned value –Once an activity is completed, its elapsed time is recorded and its earned value (EV) is accumulated to the cumulative EV

Schedule variance –= Earned Value – Planned value –Indicates how the actual schedule differs from the planned schedule Schedule performance index –= Earned Value / Planned value –SPI > 1 means “better than planned” –SPI < 1 means “slower than planned”

Cost variance –= Earned Value – Actual cost to date –Indicates how the planned cost differs from actual cost Cost Performance index, CPI –= Earned Value / Actual cost to date –CPI > 1 means “better than planned” –CPI < 1 means “slower than planned”

Software Project Management 5 Earned Value Analysis (cont’d)

Software Project Management 6 Earned Value Analysis (cont’d)

7 Earned value – an example Tasks –Specify module5 days –Code module8 days –Test module6 days At the beginning of day 20, PV = 19 days If everything but testing completed, EV = 13 days Schedule variance = EV-PV i.e = -6 Schedule performance indicator (SPI) = EV/PV i.e 13/19 = 0.68

8 Earned value analysis – actual cost Actual cost (AC) is also known as Actual cost of work performed (ACWP) In previous example, if –‘Specify module’ actually took 3 days (planned 5 days) –‘Code module’ actually took 4 days (planned 8 days) Actual cost = 7 days Cost variance (CV) = EV-AC i.e = 6 days Cost performance indicator (CPI) = EV/AC i.e = 13/7 = 1.86 Positive CV or CPI > 1.00 means project under budget or the work is completed better than planned

9 Earned value chart with revised forecasts (AC)(PV) (EV)