Modules components procurement EU Lead US Lead EU Scintillators US Scintillators EU Bond Paper US Bond Paper EU Straps US Straps EU BackPlate US BackPlate.

Slides:



Advertisements
Similar presentations
D-Cal production preparations in Japan Dec. 16, 2009, D-Cal meeting at CERN Tatsuya Chujo (Univ. of Tsukuba) for the D-Cal Project 1.
Advertisements

Some cryostat scintillator slides for Monday’s meeting Michigan State University.
Forward scintillators in ATLAS: cryostat and MBTS CERN Dubna Michigan State University University of Texas-Arlington presented by J. Huston Michigan State.
2 Introduction   MiniCal test-beam studies started at the beginning of March (till March 6 we only had 17 APD’s, then 33 APD’s)   A few days were.
HCAL RBX PRR Overview Jim Freeman RBX PRR March 1-2, 2001.
NOvA Module Manifolds & Bottom Plates Tom Chase University of Minnesota February 2006.
Cylinders or Space Frames ? David Hitlin September 16, 2005.
Photon Tagging in the Hall D Beamline James McIntyre University of Connecticut 13 May GlueX Graduate Student Workshop Newport News, VA.
EMCAL: project update - Italy - LNF - Frascati Fixture production Module assembly (proto) WLS fibers processing Lead procurement (proto) CT- Catania APD.
Polishing the Ferrules Howard Budd Sep Polishing Epoxy on the Ferrule We glued fibers in the 10 ferrules that Dave Warner gave us One problem.
1 Production 2 WLS QC Howard Budd University of Rochester Rochester Meeting Oct
Prototype Mechanical / optical considerations 1.Current LED system performance 2.New APD / Fiber /Strong Back integration scheme.
Sep 13, 2007CALICE Collaboration Meeting Prague 1 Long term test of LED pulsing  Long LED system stability measurement  Aging of part of optical system.
1 HF Laser/LED Calibration Studies L. Almeida, M. Baarmand, L. Caraway, M. Hohlmann, T. Qureshi, I. Vodopianov FLORIDA TECH 1->9 light splitter w/ pulsed.
NuMI Schematic View of the MINOS Scintillator System 8 m Scintillator Module WLS Fibers Optical Connector Clear Fiber Ribbon Cable (2-6 m) Multiplex Box.
Optical calibration system for EUDET AHCAL module Jaroslav Cvach IPASCR 1.Calibration system for SiPM photodetectors 2.QRLED driver photoelectron spectra.
Status of EIC Calorimeter R&D at BNL EIC Detector R&D Committee Meeting January 13, 2014 S.Boose, J.Haggerty, E.Kistenev, E,Mannel, S.Stoll, C.Woody PHENIX.
May 11, 2006CALICE Collaboration Meeting, McGill Uni, Montréal, Québec, CA 1 UV LED quality test  All 872 UV LEDs tested  Selection is about to finish.
LED calibration systems for CALICE hadron calorimeter Jiri Kvasnicka Institute of Physics, Prague June 11, 2011TIPP 2011, Chicago1 Under.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
Status of the PSD (Jan. 2009) F.Guber, INR, Moscow.
Cost for Large Liquid Scintillator Detector Ken Heller University of Minnesota Active Detector – Liquid Scintillator Target Material - Water Read Out –
PHOBOS TOF Construction Status
Status of Projectile Spectator Detector A.Kurepin (Institute for Nuclear Research, Moscow) I. Introduction to PSD. II. Conception and design. III. Development.
Chapter 8 Basic System Design. System factors for designing from scratch: Design Verification FactorAvailable choices Type of fiberSingle mode, multimode,
0 The LHCb Hadron Calorimeter Rustem Dzhelyadin, (IHEP, Protvino) INSTR02 Conference, BNPI, Novosibirsk, Russia Contents: Œ Design overview  Trigger with.
N 2 Laser 300  QQ 150m HF  HF + 9 PMT Boxes  QP Calib Box 1  4 Counting Room HF Calibration Optical Fiber Path 9 PMT Boxes / Quad 24 PMT Tubes.
THE FORWARD PROTON DETECTOR AT DZERO Gilvan Alves Lafex/CBPF 1) MOTIVATION 2) DETECTOR OPTIONS 3) FPD R&D 4) OUTLOOK Lishep 98 Lafex/CBPF Feb 17, 1998.
LCWA, ALCPG 2009 Albuquerque, NM Ivo Polák, FZU, Prague1 Calibration system of CALICE AHCAL detector Ivo Polák 1.Two calibration light distribution.
Insert Date Revision 0 Page 1 BRITESPOT FROM POWELL.
ALICE high p T workshop, LBNL, April 7, 2009 (T. Chujo) J-Cal Construction Plan Tatsuya Chujo University of Tsukuba (for the ALICE J-Cal Project) 1.
1 The fiber optic system for cross connection cabinets R&M FiberCurb.
R&D of MPPC for T2K experiment PD07 : Photosensor Workshop /6/28 (Thu) S.Gomi T.Nakaya M.Yokoyama H.Kawamuko ( Kyoto University ) T.Nakadaira.
1 Prototype Calibration System for Forward Hadron Calorimeter L. Almeida, M. Baarmand, L. Caraway, M. Hohlmann, T. Qureshi, I. Vodopianov FLORIDA TECH.
Optical Part of the CMB for AHCAL-CALICE Jaroslav Zalesak Institute of Physics, Prague.
EMCal Status ALICE Technical Board November 20, 2008 News Schedule.
May - 20Ivo Polák, FZU, Prague1 LED notched fibre distributing system Calibration system for SiPM Ivo Polák, on behalf prague’s group
GlueX collaboration meeting, Bloomington, May 9-11, Task list for UConn construction contract 1.order clear light guide fibers from Saint Gobain.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
oct - 6Ivo Polák, FZU, Prague1 Calibration system for SiPM and LED notched fibre distributing system Ivo Polák, on behalf prague’s group
Linearity Tests The laser induced high noise pulses on the APD rendering it useless. We tried several methods to shield and filter the noise. With a stabilized.
Status and R&D development of Photon Calorimeter G. Atoian, S. Dhawan, V. Issakov, A. Poblaguev, M. Zeller, Physics Department, Yale University, New Haven,
first results from EMCal test beam
December Status of MRS photodiodes ND280 Convener’s Meeting, 9 June 2006 Yury Kudenko INR, Moscow.
UPDATE ON THE FORWARD PROTON DETECTOR Gilvan Alves Lafex/CBPF Introduction Accelerator Roman Pots Detector Future Plans April 1, 1998 (no kidding)
LC Muon Detector Development Overview Hardware R&D Goals Hardware Configuration Design Issues Procurement, Engineering, Manpower Additional Development.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
1 Diodes (APDs) for the Electromagnetic Calorimeter in the ALICE experiment Paola La Rocca University and INFN Catania Characterization of Avalanche Photo.
FT Prototype Test Purpose: test the prototype of the FT Calorimeter and Scintillator Hodoscope Technique: prototype is installed under the Hall B photon.
BRAKE UNIT Mr. Masters Tech Ed 12th. Caliper brake design Most cars from the 1990 and up are equipped with caliper brakes.
EMCal Meeting Nantes – July J-F Muraz  Grenoble Status  Assembly and test Hall.
Xtal Calorimeter with Fiber Readout work by diploma student  Ralph Dollan (HU) Achim Stahl DESY Zeuthen 10.Oct.2003 LumiCal BeamCal.
Christopher Cowden Advisor: Mario Spezziga Project: CMS HF (Forward Calorimeter)
Normal text - click to edit MAPD/MPPC Characterization & Axial PET 1.
The ICD Project Alan L. Stone Louisiana Tech University All D0 Meeting - 7 September 2001.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
April 27, 2004 ECAL meeting, Giessen A.Vinogradov Kurchatov Insitute, Moscow 1 PHOS APDs The APDs are very sensitive to Bias/Cooling variations within.
David Hitlin EMC R&D Meeting April 1, Responsibilities ItemResponsible institution/person LYSO crystal development, order optimization Forward EC.
FP7 Kick-off Workshop on G-APDs GSI 9-10 Feb A.Wilms H.Orth G-APD Avtivities at GSI G-APD Activities at GSI Title Present instrumentation for the.
USTileCal Planning UTA ITC Scintillator Project R. Miller May 13, E3 C10 B11 E1 D5 A14 - A15 B14 D6 A D4 A12 A13 B12 - B
Development of a low material endplate for LP1 and ILD Dan Peterson, Cornell At previous meetings, , showed the carbon fiber molded.
SiPM linearization status update
TRIPORT™ LIGHT/SIGHT GLASS SYSTEM
Baby MIND Collaboration Meeting #2
Vertical Pump Motor Manifold –D Operations and Maintenance
EMCal – France Status report, July 2008 Manpower Technical activities
Scintillator Detector
Power Steering Test Stand
Status of the EUDET Prototype
Presentation transcript:

Modules components procurement EU Lead US Lead EU Scintillators US Scintillators EU Bond Paper US Bond Paper EU Straps US Straps EU BackPlate US BackPlate EU FrontPlate US FrontPlate EU CompressionPlate US CompressionPlate

Modules components procurement EU Belleville Washers US Belleville Washers EU BW plunger pin US BW plunger pin EU WLS Fibers US WLS Fibers EU Fiber Bundle Terminator US Fiber Bundle Terminator EU Light Guide US Light Guide EU APD mount US APD mount EU APD manifold US APD manifold

Modules components procurement EU APDs US APDs EU preamps US preamps EU ferrule for calibration LED US ferrule for calibration LED EU Strongback US Strongback EU TCard US TCard fixation for TCard