GlueX collaboration meeting, Bloomington, May 9-11, 2011 1 Task list for UConn construction contract 1.order clear light guide fibers from Saint Gobain.

Similar presentations


Presentation on theme: "GlueX collaboration meeting, Bloomington, May 9-11, 2011 1 Task list for UConn construction contract 1.order clear light guide fibers from Saint Gobain."— Presentation transcript:

1 GlueX collaboration meeting, Bloomington, May 9-11, 2011 1 Task list for UConn construction contract 1.order clear light guide fibers from Saint Gobain 2.fabricate glass ferrules for square fiber fuser 3.cut and rough-polish 500 scintillating fiber sections 4.fine-polish one end of the scintillating fibers 5.cut and rough-polish 500 clear light guides 6.fuse light guides to the scintillators 7.fine-polish the end of the clear light guides 8.paint the contact surfaces of the fibers 9.epoxy the scintillating fibers into 5x5 modules 10.attach reflective mylar to the upstream module ends Richard Jones

2 GlueX collaboration meeting, Bloomington, May 9-11, 2011 2 UConn construction contract, continued 11.construct the detector housing 12.construct extended motorized rail system 13.install rail system in the detector housing 14.install several fiber modules on the rail system, verify tolerances 15.install test pulser system in the detector housing

3 GlueX collaboration meeting, Bloomington, May 9-11, 2011 3 UConn construction contract, part II 1.order the SiPM’s 2.order parts for the electronics boards 3.send off design, parts for PCB construction and assembly 4.construct electronics housing 5.install chimneys in electronics housing 6.insert subset of fiber modules into chimneys 7.receive boards from manufacturer, test in dark box 8.install boards in housing 9.install duct between detector and readout housing 10.test subset of modules using the test pulser

4 GlueX collaboration meeting, Bloomington, May 9-11, 2011 4 UConn construction contract, continued 11.disassemble and ship to JLab

5 GlueX collaboration meeting, Bloomington, May 9-11, 2011 5 UConn construction contract, part III 1.order diamond plates from vendor 2.assess original plates using X-rays at CHESS 3.submit one set of plates to Sinmat for thinning 4.submit second set of plates for laser cutting 5.assess thinned plates a second time at CHESS 6.if ok, submit cutout plate and thinned plate to Sinmat for bonding together 7.mount bonded radiator assembly on HT mount 8.assess assembled and mounted radiators at CHESS 9.ship to JLab for mounting on GlueX goniometer target ladder