Copyright © 2013 Boeing. All rights reserved. FaST | PNST | AOE Status: MD-11 issue AOEmodifiedEOT_RT_Template.ppt | 1.

Slides:



Advertisements
Similar presentations
Publication Module using back end interface. Institution Data Entry Add Documents. Edit/Delete Documents that are added but not yet sent to Institution.
Advertisements

June 1, Current Status Technical Details Current Releases Issues Potential Use Cases Position Reporting Portfolio Reconciliation Cash Flow Matching.
B-RNAV OPERATIONS IN EUROPEAN AIRSPACE
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Autonomous Aircraft OSED CARE-ASAS Activity 3: ASM Autonomous Aircraft OSED.
APOLLO GX55 GPS Basic SAR Operations
Federal Aviation Administration S1P1/P2 Production System: DCL Route Rules DCIT#32 16 April 2014.
Presented to: REACT Workshop By: Jay Merkle Date:25 June 2008 Federal Aviation Administration High Density Airport Time- based RNAV/RNP NextGen/JPDO Demonstrations.
Federal Aviation Administration Data Communications Program DCIT Update MEM ATCT DCL Trials To:DCIT Plenary From: Matt Maki Date:
Presented to: DCIT By: Andy Fry, Thane Inc. Date: September 20, 2011 Federal Aviation Administration Data Communications DCIT #9 Flight Deck Working Group.
2 eGrants Coaching Unit 3 create/edit Service Opportunity Listings Grantee Recruiter search for listings, register, & apply to serve Applicants view.
What’s New The following slides describe the changes and system fixes that will be loaded to the production system on the 25 th January ‘Calogi Product.
Part 7: Flight Plan Exercise (Part 2)
1.06 ATC, Flight Planning, and Rules of the Air
Slide 1 FAA’s Special Technical Audit of Boeing and the Audit Resolution Plan.
DARP.
Area Nav: RNP Evolution
Users’ Perspective of PBN Achieving Improvements Joël Morin Head, ATM Harmonization.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Departure Clearance Trials (DCL) Test Status DCIT Meeting # 22 Washington,
Rendering / Servicing Provider. Introduction to IMPACT and Key Terms Application Process Resuming an Application Starting a New Application The Business.
101 P C O L S Recommended Role: New and Existing Resource Managers How to Redeem a Resource Manager Token in AIM I N T E R A C T I V E T U T O R I A L.
Tips & Tricks Groups are Great! August Use of a Group Record Individuals are not identifiable – EXAMPLE – all ten frogs look alike – EXAMPLE –
Solutions Summit 2014 Discrepancy Processing & Resolution Terri Sullivan.
CSA Release 2 CYBER Training. Training Purpose Review the new functionality in CYBER that will assist in the submission and review of Treatment Plans.
© 2003 The MITRE Corporation. All Rights Reserved. Cockpit Display of Traffic Information (CDTI) Enhanced Flight Rules (CEFR) Randall Bone October 7, 2003.
Federal Aviation Administration Data Communications Integration Team (DCIT) DCL Trials test activities Presented to:DCIT # 15 By:Peter Muraca FAA Date:May.
© Copyright 2013 TONE SOFTWARE CORPORATION. Confidential and Proprietary. All rights reserved. ® Operator Training – Release Alarms Suppression and.
Harris.com Michael Earl Systems Engineering, Trials and OPR Trials Status and OPR Update.
Motivation Collision Avoidance – Inefficient airspace utilization – Increased air traffic workload – Use of obsolete technologies 2.
Presented to: DCIT #12 Plenary By: Andy Fry, Thane Inc. Date: January 12, 2012 Federal Aviation Administration Data Communications DCIT Update Flight Deck.
Data Link Communications
Data Communications Implementation Team (DCIT)
1 Instruction Manual for the Arabtec mySupplier System | version 1.0.
POA / AOA Evaluation Recommendation
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
Federal Aviation Administration Data Communications Program Departure Clearance (DCL) Trials DCIT17 To:DCIT Plenary From: Matt Maki, Trials Lead Date:
BOEING is a trademark of Boeing Management Company. Copyright © 2011 Boeing. All rights reserved. OMWG and All Working Groups DCIT-39 report out 11 March.
Rev.04/2015© 2015 PLEASE NOTE: The Application Review Module (ARM) is a system that is designed as a shared service and is maintained by the Grants Centers.
Statewide Financial System Program 1 Commitment Control (KK): Refresher Training Key Points Commitment Control (KK): Refresher Training Key Points Welcome.
EWR DCL Flight Tests Capt Gregg Kastman MD-11 Flt Trng Sup.
EWR DCL Trial Update Capt Gregg Kastman MD-11 Flt Trng Sup.
Flight Planning Victor Airways1 Flight Planning Victor Airways with the G1000 Ted Spitzmiller.
CY Segment 1 Phase 1 Tower Services Initial En Route Services Departure Clearances (DCL) Transfer of Communications Initial Check-In.
Chapter 3 Automating Your Work. It is frustrating when you have to type the same passage of text repeatedly. For example your name and address. Word includes.
Vendor Bid System (VBS) Seminar. Agenda Vendor Bid System Overview Step-by-Step Advertisement Posting Editing Active Advertisements Recommended Practices.
Joining RNAV Approaches at a fix or waypoint Prepared by John D. Collins CFI/CFII.
Payroll/Personnel System Web-Based New Hire Presented by Payroll Services.
1 Archiving and Restoring Machine Waypoints 2015.
RTA Capability Status of Flight Operators Data as of January 2011 FAA ATCSCC August 27, 2010 Presented by: Ernie Stellings, NBAA *With data provided by.
CIS—100 Chapter 8—Tracking Changes 1. Turning on Track Changes On the Review tab, in the Tracking group, click Track Changes. The background of the Track.
Creating Manual Subledger Journal Entries Oracle Subledger Accounting.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCL Trials ”T e s t S t a t u s” Presented to:DCIT, Meeting #18 Presented.
Orders and Invoices Supply Chain Platform: Rolls-Royce Training for Indirect Suppliers March 2016.
Budgeting in Microsoft Dynamics AX BY: BRAD GEHRLS AND RYAN SEITZ.
DCIT Document Hierarchy End-to-End Procedures and operational system features effecting multiple organizations Systems Integration Document Detailed system.
Presented to: DCIT Flight Deck Working Group By: Andy Fry, Thane Inc. Date: October 12, 2011 Federal Aviation Administration Data Communications DCIT #10.
COPYRIGHT © 2013 BOEING. ALL RIGHTS RESERVED Identifying potential service enhancements to increase operator participation DCIT May 2013 Brad Cornell.
Допълнение 7 на PANS-ATM (ICAO Doc 4444)
EWR DCL Flight Tests Capt Gregg Kastman MD-11 Flt Trng Sup
GPSMAP 182C – Chartplotter on Windsong
BWI Roundtable Presentation
Return Shipment Manifest
Data Comm Departure Clearance End To End Summary: (DCIT #27 WG)
15-19 Nov 2010 Rockville, MD – Lockheed Martin
RAD in DFS – information for external stakeholders
The Financial Aid Office Award Package Mass Packaging Process
Presentation transcript:

Copyright © 2013 Boeing. All rights reserved. FaST | PNST | AOE Status: MD-11 issue AOEmodifiedEOT_RT_Template.ppt | 1

Copyright © 2013 Boeing. All rights reserved. EO&T | BR&T FaST | PNST | Airspace & Operational Efficiency Problem Description  Problem 1: If a UM79 does not repeat the “TO” point, after sequencing the last waypoint before the “TO” point the aircraft begins flying towards the last waypoint prior to the “TO” point from previous route data. The magenta line on the Nav Display between this point and the “TO” point disappears  Problem 2: If a um79 repeats the “TO” point, the FMC does not collapse the duplicate waypoints to one, forcing the airplane to do several turns after sequencing that waypoint before intercepting the Flight path unless the crew collapses them  Only applicable to um79  Prototype fix received and being checked  Awaiting documentation on the root cause  B , B747-8 checked  B777, B737, and B757/B767 complete by this Thursday AOEmodifiedEOT_RT_Template.ppt | 2

Copyright © 2013 Boeing. All rights reserved. EO&T | BR&T FaST | PNST | Airspace & Operational Efficiency Boeing Planned Actions  Updates in -922 FMC change (mid-2014 certification)  Problem 1 will be resolved (considered a must fix)  Problem 2 is lower priority, and is therefore fighting for space and funds (status not known yet)  Once the root cause has been confirmed by Honeywell, Boeing will issue the following two IOPs :  IOP 1 (simplified versions – draft IOP will be more complete): Part 1: When presented with UM79, after loading the message, the crew is to delete the last waypoint of the revised clearance from the UM79 message and re-enter it manually in order to avoid Problem 1. Parts 2: If Part 1 of this IOP is missed and the problem occurs in flight, after the anomaly is seen the crew should select a heading that will return the airplane to the cleared route of flight – Specific details on crew interactions with the MCDU and ND are in the draft IOP  IOP 2: After loading of the UM79, if duplicate waypoints are present on the MCDU, the crew should delete one of the waypoints. This is the work-around for Problem 2 AOEmodifiedEOT_RT_Template.ppt | 3

Copyright © 2013 Boeing. All rights reserved. EO&T | BR&T FaST | PNST | Airspace & Operational Efficiency Impact on FAA DCL Service  No change to TDLS / Operational system requirements  -922 will be available prior to IOC, so existing end-to-end requirements apply.  Specifically: For UM79, when the “TO” point is also an airway termination point for an airway that’s the last element in the routeinformation field, DTAP will include the “TO” point as the last element in the routeinformation field after the airway. For UM79, when the “TO” point is not an airway termination, DTAP will not include the “TO” point as the last element in the routeinformation field.  DTAP change to support MD-11 Revisions via UM79 For UM79, DTAP will include the “TO” point as the last element in the routeinformation field Crews will need to use IOP 2 Airbus confirms acceptable from their perspective AOEmodifiedEOT_RT_Template.ppt | 4