Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with.

Slides:



Advertisements
Similar presentations
Liverpool LHCb Planning. April (2001) –Clean room (production facility) handover and qualification (April 19) (delayed to May 10) –Thermal model Results.
Advertisements

23-Aug-2005 VELO Production UCD VELO Module Production at Liverpool T. Bowcock.
1 Liverpool Production Status Week of 23 February 2007.
Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
1 Liverpool Production Status Week of 02 March 2007.
Clean Room Plans Monday, August 23, Hybrids--- Frames--- SensorsModules.
Present Assembly Status Three important milestones completed: – We tried the entire assembly procedure on real modules and it worked – The construction.
Stave Hybrid Status Ashley Greenall 1. Current Status Current build of hybrids (Version 3) distributed to 6(+1) sites: Cambridge, DESY, Freiburg, LBL,
ATLAS Module building at Glasgow
FEATURES – Displays the job features on the screen. Additional features are available by touching the tabs. TOUCH SCREEN – displays all the available features.
Hybrid assembly at Glasgow. Placing ASICs Arrange 20 ASICs in ASIC tray with strip bond pads facing outwards – ASICs to be used in ‘Cat A’ sample boxes.
Design Ash finished electric hybrid tracing to connector fields –Changes to allow for HCC-less and HCC running on one hybrid awaiting final confirmation.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Construction and Status of the Origami Module Prototype C. Irmler HEPHY Vienna.
Tony Smith LHCb Velo Hybrid Meeting CERN 29/07/04 1 VELO HYBRID STATUS CONSTRUCTION of composite SUBSTRATE – best flatness obtained with TPG central core.
Andy Blue Glasgow Update. Andy Blue WP3 Meeting UV Glue In November, I sent UV Glue, hybrid panel + jig to Anglo Production Process LTD –UK supplier of.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
Irradiations/ Birmingham Status Paul Dervan The University of Liverpool, UK ATLAS12 Sensor Testing Meeting 16/01/141.
Tooling and assembly of US stavelet at Berkeley S. Díez Cornell, C. H. Haber, M. Defferrard, R. Witharm Sept 6th, 2012 Berkeley mechanical meeting, 5th-7th.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
WP3 Meeting 21/05/ Liverpool Status: Thermo-Mechanical Hybrids Have now received a full complement of 240 Thermo-Mechanical Hybrids from Stevenage.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
Hybrid Integrated Circuit
Design and Performance of Single-Sided Modules within an Integrated Stave Assembly for the ATLAS Tracker Barrel Upgrade Ashley Greenall The University.
1 WP3 Bi-Weekly Meeting Activities at Liverpool 1.Evaluation of Compact DCDC converter Designed to match up to an ABC130 module 2.Status of FIB’d hybrid/module.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
Stave Module Status Tony Affolder The University of Liverpool On behalf of cast of thousands… ATLAS Upgrade Week November 10,
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
March OsC Report and Restructuring WP4. OsC Report 4.1 Tapes Bus tape designs have been completed for modules with 130nm ASICs which incorporate options.
Manchester Qualification M-O-048. Mechanical dummy. Check that tuning of alignment parameters had correct sign and adjustment of transfer chucks Z was.
SCT Week 2 Oct 2002N.P. Hessey NIKHEF1 Status ATLAS SCT 2002 NIKHEF Contributions to ATLAS: Magnets – discussed by Frank Trigger DCS Muon MDT and alignment.
Module mounting. Status Stave 250 received… damaged – Repair now complete (see extras) Friday at 8:30 it will be collected by RAL driver and transported.
The Inclusive (Measurement ) FVTX aka iFVTX sponsored by LANL-DR in FY ‘06-08 FPIX Chip Module/Hybrid Testcard Pixel Plane Assembly/Integration.
A thermo-mechanical petal Sergio Díez Cornell Petal discussion, 24 Oct 2014.
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
Status of Glasgow module production Richard Bates The University of Glasgow K.Smith, R. Bates, A. Cheplakov, V. O’Shea W. Bell, J. Melone, F. Doherty,
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
Hybrid panel heated plate study Currently the curing of the ASIC glue for the hybrid panels are done at room temperature. This is a study to determine.
Stave Hybrid/Module Status. Modules Stave Module Building 2 Mechanical Chip Gluings Mechanical Wirebonding Electrical Chip Gluings Electrical Wirebondings.
Gluing, measuring and shearing Heated plate curing Is the process feasible? Tests with 130nm hybrids Measure resulting glue thickness Determine the shear.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
SCT week: 14th - 16th Dec 04 Spine progress R. Bates University of Glasgow.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
Gluing trials continuing: Loctite is favourite (for Dispensemaster) Bonding: exercising the machine; practising in laying down patterns (Simon and.
EMCal Meeting Nantes – July J-F Muraz  Grenoble Status  Assembly and test Hall.
WP7&8 Progress Report ITS Plenary meeting, 10 June 2014 LG, PK, VM, JR.
WP2: On Detector Systems 2.1 Strip Sensors Layout Evaluation 2.2 ASICs Digital Design Evaluation Wafer Test 2.3 Hybrids Layout & Manufacture Die Attach.
Pixel Pilot system Hardware Status Simon Kwan August 28, 2012 CMS Pixel Upgrade Workshop, Grindelwald1.
Stave Tooling & Plans for Future Stave-building (Tim)
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
July 20, 2007Anita Topkar, BARC PSD Production: Present Status Dr Anita Topkar BARC.
Module Radiation Length. Goals Estimate the expected radiation length of a module, based on the design and measurements on as-built modules Determine.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Thermo-mechanical petals Volker Prahl, Sergio Díez, on behalf of the petal community CERN AUW, 3 rd Nov 2014.
Andy Blue WP3 - Glasgow Update Andy Blue. WP3 Meeting Update Module Building –2 nd Module (FZ1) wire bonded last week –Tested on Mon –Re-works yesterday/today.
2 Oct C. Irmler (HEPHY Vienna) BPAC Preparation and SVD Schedule 6 th Belle II VXD workshop.
On-Module Interconnection and CNM Projects DEPFET Meeting, Bonn, February Ladislav Andricek, MPI für Physik, HLL  update on thinning  samples.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -
Infrastructure & issues and solutions for ATLAS Upgrade Hybrid/Module strip bonding Fred Doherty, Joe Ashby, Fiona McEwan & Calum Gray ATLAS Upgrade Module.
ATLAS pixel module assembly flow
T. Bowcock University of Liverpool
Glue curing studies (contd)
SCHEDULE Nov 1st - Assembly Table Complete
ITK Strip Module Meeting; 12st October 2015
Module building: plans & inventory
ATLAS Upgrade Module Bonding Trials Using Glass Asics
Presentation transcript:

Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with Cambridge with a complete set of jigs – Cambridge took extensive notes/photos/videos and is making web page to start a set of training documentation Second set is be made ready for UCSC/LBL – Last week during final commissioning of the set, the metal stencil was damaged for the chip tray and had to be re-glued yesterday – The jigs could be sent out next week but I would like to discuss the timing Worried about shipping during Christmas and would like to send include a new hybrid panel which is delayed (see next slide) We are making 3 additional wire bonding jigs to be ready when other sites are ready to start – Should be finished late Jan/early Feb – Will send one to DESY with a hybrid panels with 3 sets of ASICs attached (1 bonded, 2 unbonded) – Could send one to Freiburg if interested

Hybrid Delivery Originally, I planned on shipping out jigs to the west coast with one of the new hybrid panels – With one hybrid bonded and 2 more with chips attached to start the process at UCSC – The hybrid shipment was due 2-3 weeks ago but was delayed due to bad weather and an increased work load due to an eminent VAT increase in the UK. Hope to receive at the beginning of next week Shifts SMD attach to the week of Jan. 11 th Would be able to send this panel ~ week of Jan. 18 th So I can either delay shipment until these hybrids are ready or ship the jig now with 1 bonded hybrid (maybe)

Near term plans (1) Before Christmas – Will finish bonding/testing of all the hybrid/modules assembled during the training sessions – Work on finishing the commissioning the last jigs at Liverpool Extra pickup tools and module testing jigs – Define and start manufacture of testing system for irradiated modules – Receive and inspect hybrid delivery to prepare for SMD attachment – Finish gathering the needed components for the hybrid-to- sensor gluing study Have epoxies in hand, Glasgow is dicing glass dummies for ASICs, hybrids in process at Stevenage, ordering glass sensors from Schott Ltd. (Germany)

Near term plans (2) January – Focus on finalization of glue layer Determine maximum achievable glue layer with Epolite Decide if we need to “load” epoxy to increase viscosity to increase thickness and to improve accuracy of glue placement Use glass ASICs/sensor to determine glue coverage and to determine optimal glue patterning for hybrid-to-sensor gluing – Make 2 panels that have some hybrids with ASICs for UCSC/LBL, DESY and Freiburg (??) – Sending additional panel to Cambridge – Starting another order of 15 hybrid panels – Testing of DC/DC convertors on module frame – Testing of irradiated modules at CERN