Endcap assembly update C Buttar, R French UK-V Cluster RAL 8 th Sept 2004.

Slides:



Advertisements
Similar presentations
Endcap assembly update C Buttar UK-SCT-MB RAL 2 nd Sept 04.
Advertisements

Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
23-Aug-2005 VELO Production UCD VELO Module Production at Liverpool T. Bowcock.
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
April 05 Jason Tarrant CCLRC1 PRR of SCT off-detector cooling system l Cooling System »Design - Off-cylinder & On-cylinder »Installation – Off-cylinder.
Sandblasted, repainted fender brackets. Mudflaps and rubber buttons to attach them.
MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
MICE Hall – South Mezzanine Jason Tarrant - STFC l Contents »Device checks with current South Mezzanine »South Mezzanine change summary »Conclusion.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of construction, assembly, integration Production: - Ladder integration - Installation on planes Inner tracker assembly:
Opto Harness FDR 19/10/01 T. Weidberg1 Opto Harness FDR Scope and aims of review, system overview Available documentation Status of Project & Schedule.
EMCal Meeting CERN – July 2 nd 2007 LPSC Status 1 J-F Muraz LPSC Status LPSC Status.  Assembly Hall. - Removal starts and is in progress. - Main infrastructure.
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
Irradiation Scanning System suitable for silicon & passive materials (with cooling) H Marin-Reyes R French P Hodgson K Parker P Dervan J A Wilson D. Parker.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
I Wilmut CCLRC1 End-cap Engineering 8 September 2004 Ian Wilmut, RAL.
Low Mass Tapes Report UK-V, 2nd February 2005 William Bell, Craig Buttar, Arthur Moraes, Val O’Shea, Aidan Robson Glasgow University.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
ATLAS SCT End-Cap C Integration 1.Introduction: to the SCT within ATLAS 2.End-Cap C Reception at CERN 3.Final Assembly 4.Integration with the TRT 5.Combined.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
November 04 Jason Tarrant CCLRC1 SCT EC Interconnects l Progress of SCT EC Interconnects »Services (Required for Disc Insertion 2004 / Integration 2005)
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
SCT Barrel 6 Support Bearing A full-scale model of the barrel 6 support bearing has been machined at UCL (drawing G.Barbier ) It was tried out on both.
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
Update on Module Mounting on Staves and Stavelets 25/8/11 1.
Neil Jackson University of Liverpool Hiroshima Symposium June THE ATLAS SEMICONDUCTOR TRACKER (SCT) A PRESENTATION ON BEHALF OF THE ATLAS.
D. Greenfield CLRC1 End-cap Engineering Status Report Debbie Greenfield, RAL UK-V 30 October 2002.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
EC Cu-LMTs -Status Report- Ulrich Parzefall Universität Freiburg.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
Vrije Universiteit amsterdam Milan, September 25, 2000 VELO System J.F.J. van den Brand LHCb Vertex Detector System: Status Report J.F.J. van den Brand.
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
M. TYNDEL 1 LHCC Interactions May 2003 ATLAS SCT SCT Production Status ‘Snap-shot’ of the status of the SCT production (May 2003) 1. Barrel Modules 2.
31 January 2006A.Ciocio - SCTSG1 Type ii-iii and PP1 Production Timescale for installation Plan PP1and Testing.
August 04 Jason Tarrant CCLRC1 SCE EC Design & Manufacture l Progress of SCT EC »Support Structure (Required for Disc Assembly 2004) »Services (Required.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
Upgrade activities DT-LHCb coordination meeting 14 March 2016.
WP F/L Dom production. KM3Net meeting 2012 Erlangen - Edward Berbee - Nikhef22/06/20121.
VELO Replacement Girish Patel University of Liverpool.
EC: 7 DISK concept Preliminary considerations
5 November 2002J.Pater - Systemtest Report1 Endcap Systemtest Current Grounding/Shielding status Recent Upgrades to sector Measurements with 6 Modules.
ATLAS Internal ID Service Integration
DT-LHCb coordination meeting 18 April 2016
Resource Loaded Schedule and Budget Profile
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
Roadmap for triplet cryostats
BSS Prep work at CERN and Acceptance of Parts
End-cap Mechanics FDR Overview of the Project
MICE Target Report Video Conference 29/11/07
Mechanics: (Tim).
Installation step 4. (3 days)
LUCID Mechanical support and cooling proposal Status of the current design development Erik Richards, Raphael Vuillermet December 10th 2013.
Cryomodule Assembly Plan
Presentation transcript:

Endcap assembly update C Buttar, R French UK-V Cluster RAL 8 th Sept 2004

Nikhef disk  cylinder assembly tooling

TPPCs 4x32ch PCBs Thermal plug access windows Cooling pipes LMT trays Service Handling

Disk insertion tooling

Disk  cylinder tooling Shielding foil added to cylinder Thermal feedthrough prepared Cylinder and stub wings assembled onto tooling 4 disk alignment tools made by Manchester  delivered to Liverpool Disk grabber-design by Nikhef- manufactured by Sheffield/Lancaster; tested with a disk CCDs and lighting now added and tested Disk fixations from Nikhef and Liverpool-delivered alignment target holders designed (Nikhef) and manufactured (Lancaster) z-alignment tool needs to be finished Still to do….. Disk-grabber and disk alignment, perform 2 nd test How to mount and de-mount the central beam concept ready, need to test

Cylinder  tooling Pre-aligment of rear stub wing mounting point Rear stub wing mounted onto frame Cylinder placed over beam and left on table with foam supports Cylinder bolted to rear stub-wing front wing offered up using sling for support and mounted Disk placed on disk grabber and cylinder aligned Disk moved through cylinder Very useful exercise! - lots of details to be sorted/have been sorted

Disk  cylinder insertion Capture and align a disk need to consider disk masses

Service status LMTs Testing of UK tapes at Glasgow Preparation of LMTs before assembly into trays  JT TIs Will be tested as part of LMT-TI harness at Glasgow First 100 delivered, full order soon ‘String test’ LV/HV  test cable  TPPC  TI  LMT  PPF0  wiggly tape  hybrid/module at Liverpool Fibres Lancaster has volunteered to take on reception testing Fibres for disk testing (D1+D2) at Liverpool, D9 at the end of Aug (?) Cooling pipes Now too late to assemble cooling on cylinder at Liverpool, now retro-fitted at CERN ? Assume no cooling pipes initially and connect direct to disk as for disk testing, then connect at STFT if pipes are delivered

TPPC string test (J.Voosebeld+P.Dervan) String test Test cable  TPPC  TI  LMT harness  PPF0  wiggly tape  hybrid direct to hybridString test TPP-C String-test on single channel test board complete TPP-C ordered, string test on 32 channel pre prod board (1ch only) complete try and do 2ch test ? (need additional LMT)

Service handling Thermal plug ordered and being manufactured in Sheffield (caravans!) PPF1 trays for LMTs in production PPF1 tray holders order placed last week-being modified temporary PPF1 for fibres Lancaster have volunteered to make this, awaiting design from Nikhef At Liverpool we need to ensure we can connect in the cold room Cooling-replicate disk testing system and connect direct to the disk-or similar re-evaluate when cooling pipes/connects start to be available

Test cable installation Test Cables for endcap testing installation started—Ray Thompson, Andy Elvin, Richard French Basic mapping ready

Thermal plug

Status, going forward Assembly tooling is ~ready needs to be tested –cylinder mounted and disk moved through on the beam –Still to do: 2 nd test run of disk alignment, capture and removal done but need accurate disk masses Z-alignment tool Removal and insertion of the beam interface to disk holder floor, bracing and wheels, move in and out of cold room scaffolding for working on the cylinder

Status, going forward Service handling is progressing –thermal plug being assembled – arrives in Liverpool 13/9 –LMT trays and tray holders in production –Still to do: DCS to be investigated Fibre holder design to be finalised Cooling, connect direct to disks at Liverpool, otherwise interfaces must be defined now to allow disk insertion+testing to go forward  assume HEX that we connect to disks/pipes at STFT so no longer need cooling pipes in service handling -how to make connections in the cold room-design manifold?  replicate disk test system and connect to disks –Need services (LMTs+Fibres) to start developing methods for putting services on what tooling is required how to make test-fibre connections !

Status, going forward Developing tests for disk  cylinder assembly –test cooling on disk with services –during assembly to check connections eg LMTs, check thermistors on modules Similar tests to those made on populated disks