Presentation is loading. Please wait.

Presentation is loading. Please wait.

Bond Construction Update Citizens Oversight Committee Long Beach Community College District January 23, 2012 EDUCATE  ENGAGE  EMPOWER 1.

Similar presentations


Presentation on theme: "Bond Construction Update Citizens Oversight Committee Long Beach Community College District January 23, 2012 EDUCATE  ENGAGE  EMPOWER 1."— Presentation transcript:

1 Bond Construction Update Citizens Oversight Committee Long Beach Community College District January 23, 2012 EDUCATE  ENGAGE  EMPOWER 1

2 Agenda Current Construction Projects LAC Building A – Student Services Retrofit LAC Building I (Bookstore) LAC Master Landscape LAC Stadium Parking Lot Lights and Veterans Stadium Lights PCC MDAB (Multi-Disciplinary Academic Building) PCC Building CC Retrofit Upcoming Construction Projects LAC Math Technology Building PCC Building GG LAC Building C Retrofit Q & A 2

3 Current Construction Projects LAC Building A – Student Services Retrofit Measure E 2008 3 Considerable progress since last update Exterior envelope & roof sheeting being installed Structural walls on new addition in progress End of construction anticipated Fall of 2012

4 Current Construction Projects 4 Building construction complete; casework in progress Punch list items and fire alarm almost complete Move in scheduled for February 2012 LAC Building I - Measure E 2008

5 Current Construction Projects 5 Exterior landscape has started Landscape includes privacy wall and dense planting Project expected to be complete in March 2012 LAC Building I - Measure E 2008

6 Current Construction Projects 6 Phase 1, South of Bldg. A will bid Spring 2012 Construction to start in Summer 2012 Passive Storm water retention system Low water use plants and trees Pedestrian pathway alignment LAC Master Landscape - Measure E 2008

7 Current Construction Projects 7 Phase 2, North of Bldg A will bid Spring 2013 Construction to start in summer 2013 Active Storm water retention system Low water use Plants and trees Pedestrian pathway alignment LAC Master Landscape - Measure E 2008

8 8 Stadium Parking Lot Lights and Stadium Lighting Measure E 2008 Current Construction Projects Stadium parking lot lights Construction completed 1/6/2012 All old fixtures removed, bases demoed and asphalt patched Energy efficient lights and late night feature Stadium lighting retrofit Awaiting final DSA approval

9 Current Construction Projects PCC MDAB (Multi-Disciplinary Academic Building) Measure E 2008 9 MDAB building remodel project Phase 1 of 2 currently under construction Exterior envelope currently being constructed Roof membrane 100% complete

10 Current Construction Projects PCC MDAB (Multi-Disciplinary Academic Building) Measure E 2008 10 Interior walls under construction HVAC and mechanical being installed Phase 1 Project to be completed Summer 2012

11 Upcoming Construction Projects PCC Building CC Retrofit - Measure E 2008 11 Building CC Fitness Center, offices and restrooms Demolition and hazmat removal mostly complete Duration of project approximately 12 months Anticipated end of construction Fall 2012

12 Upcoming Construction Projects Will house Math and Culinary Arts instructional program as well as Reprographics Design Build delivery method Final 3 Qualified Design Build Entities (DBE) selected Design proposals from 3 DBE’s received and are currently being reviewed Anticipate awarding at the February Board meeting Anticipated start of construction 2013 LAC Math Technology Building – Measure E 2008 12

13 Upcoming Construction Projects PCC Building GG - Measure E 2008 13 Design Build delivery method Request for Qualifications (RFQ) have been received and under review 16 Design Build Entities (DBE) submitted qualifications Building to house Health Services, EOPS, DSPS, Financial Aid, Cashier, A&R, and Counseling Estimated start of construction December 2013

14 Upcoming Construction Projects LAC Building C Retrofit - Measure E 2008 14 Hired Architect to do design work Program phase is currently ongoing Work includes modernization of structure, classrooms spaces, and office areas

15 l i b e r a l a r t s Liberal Arts Campus Site Plan

16 p a c i f i c c o a s t Pacific Coast Campus Site Plan

17 QUESTIONS & ANSWERS EDUCATE  ENGAGE  EMPOWER 17


Download ppt "Bond Construction Update Citizens Oversight Committee Long Beach Community College District January 23, 2012 EDUCATE  ENGAGE  EMPOWER 1."

Similar presentations


Ads by Google