1 AAP 2009-10 NHM-Maharashtra Maharashtra State Horticulture & Medicinal Plants Board Pune

2 Contents of the presentation Basis for planning – SWOT analysis What has been done so far under NHM in Maharashtra Strategy for horticulture development Annual Action Plan 2009-10

3 SWOT analysis S.NStrengthsWeaknessesOpportunitiesThreats 1Strong knowledge base and area under horticulture Poor irrigation facilities 9.2 lakh ha of barren cultivable land Pests, diseases and Climatic factors 2Crop based associations and SHG Infrastructure base Absentee owners and selling of produce before harvest Productivity enhancement Price fluctuations and market gluts 3Nursery infrastructure Preponderance of small orchards Strengthening of SHG for adoption of GAP protocol Not so encouraging response from private sector to invest in PH infrastructure 4Diverse climatic conditions suitable for various crops Weak PH infrastructure Farmers’ direct markets thro SHG

4 SWOT analysis S.NStrengthsWeaknessesOpportunitiesThreats 5Premium varieties of Mango, Pomegranate and orange Retailers not keen to enter in contracts with large number of small farmers Vast domestic market which is yet untapped. 6.8 AEZs and the infrastructure developed in them Growers at the mercy of commission agents and APMC PH infrastructure through PPP and Marketing board Inadequate processing units Growing trend of consumption of processed foods

5 Sr. No. ComponentUnits 1 Area expansion under fruit crops161032 ha 2 New area under floriculture6139 ha 3 New area under Spices and Ar.Plants5724 ha 4 Vegetable area brought under improved varieties and hybrids 16255 ha 5 Area under Green houses24.8 ha 6 Area under shade net834 ha 7 Plastic mulches1093 ha 8 Assured water sources & MI3230 (no) 9 Area brought under Org farming4634 ha 10 Number of farmers trained 104548 11 Number of officers trained7049 12 Number of FFS organized 510 13 Technology demos6 Projects Achievements so far

6 Pre-harvest infrastructure sanctioned in NHM Sr. No.ComponentPhys (No.) Fin (Rs. in Lakh) Completed 1Model Nurseries (4 ha.)4035724 2Rehabilitation of TCL7447 2Seed Infrastructure8161.558 3Green houses24.8ha267.8524.8 ha 4Community tanks32309346.883230 5Technology Demonstration06109.476 6Disease Forecasting Units027.532 7Shade Net House8661.4786 8Seedling Production4521.3545 9Bio Control Lab23581.3218 10Plant Health Clinic06120.006 11Leaf Tissue Analysis Lab15275.2411 12 Post entry quarantine facility 04258.46- Total 11656.12

7 Post harvest infrastructure sanctioned under NHM Sr. No. ComponentPhy (No.) Fin (Rs. in Lakh) Completed 1Pack House1035679.66719 2Cold Storage12244.7212 3Pre Cooling Unit0314.753 4Collection & Grading0311.252 5Refer Van0314.113 6Onion Storage Structure21158.54211 7Post Harvest Handling231322.38231 8Apni Mandi1030.72 9 Extension Quality Awareness 04114.84- Total 15121490.95

8 Out put of the completed infrastructure S.NFacilityOutput 1 Bio-control lab (18) 1.9 types of bio-pesticides being produced 2.78% of capacity utilisation 3.5780 MT, 19.49 lakh Ltr of bio- pesticides & 51838 Trichocards produced 4.All of them running successfully 2 Leaf tissue analysis labs (11) 44507 samples of Grape, Pomegranate, Mandarin Orange and Guava were tested against a capacity of 56363 of the 11 labs 3 Rehabilitation of TCL (7) Additional production of 10.47 lakh banana saplings

9 Out put of the completed infrastructure S.NFacilityOutput 1 Nurseries (24)14.42 Lakh Grafts produced –Mango (Alphonso, Keshar), Pomegranate (Bhagawa), Mandarin (Nagpur Mandarin), Sweet Orange (Nucellar) etc. 2 Community tanks (3230) 20,000 ha. of assured irrigation provided 3 Seedling production (45) Seedling Production Capacity > 50.00 lakh / year 4 Plant health clinic (6) Samples tested - 2839 Nos.

10 Strategy for horticulture development- Area expansion : Strictly on cluster basis Area expansion only if, in a village, there is a minimum of 10 ha of fruit crops and Spices and 5 ha for floriculture crops Minimum orchard size of 1acre for fruit crops and spices Main thrust will be on utilisation of barren cultivable lands with access to water resources

11 Yield Gap Analysis For Major Fruit Crops ( MT/Ha) Sr. No. Crop State Average Potential Reported by SAU 1Mango3.5015.00 2Pomegranate10.2015.00 3Mandarin Orange9.1015.00 4Sweet Orange13.0015.00 5Cashew1.145.00 6Banana58.0087.50 7Kagzi Lime9.6510.00 8Guava12.1525.00 9Grapes28.2030.00

12 Strategy for horticulture development- Productivity enhancement Based on Yield Gap Analysis The important tools will be : training of farmers for scientific management, providing water resources, rejuvenation of old orchards, micro irrigation, protected cultivation and INM. Combined application of all these tools/ sub- components

13 Strategy for horticulture development- Post- harvest infrastructure Convergence of schemes of APEDA (AEZ), NHM, RKVY, NMPB and MSAMB (Marketing Board) Small Pack houses at farm level Micro cluster level collection centers through SHG of farmers

14 PHM infrastructure projects envisaged by MSAMB S.NProposalFund required (in Rs. Crore) 1 Grading and packing centers for export (7) a) Pomegranate at Malegaon, Dist. Nashik b) Fruits and Vegetables, at Rahata, Dist. Ahmednagar c) Banana at Indapur, Dist. Pune d) Mandarin orange at Amravati. e) Banana at Yaval, Dist. Jalgaon f) Keshar mango at Beed g) Pomegranate at Atpadi, Dist. Sangali 33.0 2 Vapour heat treatment plant, Aurangabad 14.5 3Maharashtra Agricultural Competitiveness project 663.10

15 Crop-wise road map and strategy Vision statements and road maps are being prepared for 8 major horticulture crops – Mango, Cashew, Pomegranate, Mandarin orange, Sweet Orange, Grapes, Banana and Onion. – Crop-wise steering groups constituted – The reports will be ready in a month’s time Comprehensive District Agriculture Plans are in final stages of preparation Cluster-wise infrastructure mapping is being completed as a part of the C-DAP

16 Fund utilisation in 2008-09 (Rs. In crore) S.NComponent(Rs. in Crore) 1Fund released by GOI+USB 130.22+ 86.32 2Fund released by state22.98 3Fund utilized in 2008-09195.42 4Unspent balance as on 1 st Apr.,200953.36 5Unspent balance as on 1 st Apr., 2009 – GOI Share46.11 6Unspent balance as on 10 th May,2009 – (GOI share)22.88

17 Component wise fund utilization in 2008-09 (in Rs. crore) Sr. No. ComponentExp. % to Total 1Planting infrastructure6.053.09 2Area expansion & Rejuvenation119.3361.06 3Protected cultivation3.972.03 4INM/IPM & org. farming10.575.40 5Community tanks40.0620.49 6HRD & Tech demos4.102.09 7PHM infrastructure6.843.50 8Innovative activities2.451.25 9Mission management2.271.16 Total 195.42

18 Abstract of the AAP 2009-10 (Rs. In crore) S. NComponentOutlay% to total 1Planting infrastructure2.140.9 2Area expansion & Rejuvenation88.1135.8 3Pending claims of GMP for BBD82.8433.6 4Protected cultivation4.521.8 5INM/IPM & org. farming10.024.1 6Community tanks32.9713.4 7HRD & Tech demos6.072.5 8PHM infrastructure13.655.5 9Innovative activities1.820.7 10Mission Management4.161.7 Total 246.34

19 Proposal for AAP 2009-10 (Rs. In Lakh) S.NComponent/ sub-componentPhysicalFinancial IPlantation infrastructure a) Planting material prod1362.50 b) Vegetable seed production540 ha151.25 IIEstablishment of new gardens a) Fruits (perennials) New Plantation37312 ha3424.20 Maintenance 1 st year42876 ha1682.27 Maintenance 2 nd year33426 ha1892.20 b) Fruits (non-perennials)4039 ha586.77 Details

20 AAP Continued…. Rs. In Lakh. S.NComponent/ sub-componentPhysicalFinancial C) Flowers2656 ha577.94 D) Spices1291 ha145.28 Total45318 ha8308.66 IIIRejuvenation of old plantation i) Rejuvenation5333 ha502.05 ii) GMP for control of BBD66422 ha8284.38 Total 717558786.43 IVCommunity tanks18423296.58

21 S.NComponent/ sub-componentPhysicalFinancial VProtected Cultivation a) Green houses8.4 ha156.32 b) Mulching715 ha50.05 c) Shade net315 ha220.50 d) Plastic tunnel5125.50 Total 1165452.37 VIINM/IPM i) Promotion8000 ha80.00 ii) Disease forecasting unit14.00 iii) Bio control lab8226.98 iv) Plant health clinic9130.00 v) LTAL572.50 Total 528.48 AAP Continued….. (Rs. In Lakh)

22 S.NComponent/ sub-componentPhysicalFinancial VIIOrganic farming a) Adoption of O.F.4050 ha389.74 b) Certification4050 ha83.86 Total 4050 ha473.60 VIIIHRD a) FFS515181.80 b) Farmers’ study tours and training3530 farmers98.00 c) Officers’ training & foreign tour635.05 d) Gardeners’ training227.08 Total 341.93 IXTech demonstrations8265.42 AAP Continued….. (Rs. In Lakh)

23 S.NComponent/ sub-componentPhysicalFinancial XPost Harvest Management a) Pack Houses1023639.38 b) Cold Storage16248.27 c) Refer Van 420.53 d) Pre-cooling Units 1060.00 e) Rural Market 1141.25 f) Collection & Grading Centers 27.50 g) Extension Quality Awareness 2200.00 h) Post Harvest Handling 284148.23 Total 13521365.16 XIInnovative Projects243182.25 XIIMission Management–415.50 Grand Total24633.58 AAP Continued….. (Rs. In Lakh)

24 Compliance of the observations made by GOI Plan size for regular NHM activities is limited to Rs. 163.49 crore. Planting material sub-plan for 3 years prepared. sufficient planting material is available. Cluster based planning –A village with a minimum area of 10ha is considered as a cluster. All the components of NHM will be allocated only to these villages Convergence of schemes – as explained earlier Allocation on PHM is based on projects in hand

25 Compliance contd. Base line data of 2004-05 and APY figures 2007- 08 are submitted District-wise plans – District-wise plan is prepared and submitted. Progress report of 2008-09 - Progress report uploaded on website. HRD - Training manuals have been prepared based on the TNA and they are strictly followed

26 THANK YOU

27 Adoption of Organic Farming along with certification Area under adoption – 5777 ha. No. of farmers involved – 5503 No. of Districts covered – 18 No. of NGO’s involved – 23 Provision for spillover – Rs. 473.60 Lakh All projects under 2nd & 3rd year conversion