Presentation is loading. Please wait.

Presentation is loading. Please wait.

PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 18 JAN 12 OPT Brief.

Similar presentations


Presentation on theme: "PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 18 JAN 12 OPT Brief."— Presentation transcript:

1 PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 18 JAN 12 OPT Brief

2 2 UNCLASSIFIED Roll Call CDS-7 State Dept – Mr. Weinz USNS MERCY AUS HQ JOC HQ JFNZ JSDF FLC-Yokosuka C7F C3F CTF 76 351 st Civil Affairs Command DLA Troop Support - Pacific ETG 30 th NCR HSC-21 DET 2 MCAST Blue: Normal participants not expected to attend VTC due to scheduling conflict.

3 3 UNCLASSIFIED PP 12 Weekly Planning Rhythm ThursFriSatSun 1300-1500W OPT VTC 1100W read ahead slides posted to APAN 1000W CA WG 1300W LOG WG 1200W MED WG 1300W FP WG Every other week MonTuesWed 1000W COMMS WG 1430W Comm Integration WG CPF N3 Semi-Monthly Update 1200W ENG WG Effective 09 JAN

4 4 UNCLASSIFIED SEPOCTNOVDECJANFEBMARAPRMAYJUNJULAUG Mission Planning/CONOPS (CPF) Meetings/Conferences (CPF/CDS) Force Sourcing (CPFN3) Interagency Coord (CPF N5) NGO Coordination (CPF N5) Partner Nations (CPF N5/C7F) Transit Plan (CPF/CDS) Funding/Authorizations (CPF) Communications (CPF N6) Assessment (CPF MAG) Detailed CONOPS (CDS) PDSS/Advanced Echelon (CDS) Deployment (CDS) Planning Timeline Advanced Echelon Deployment MOU Letters Signed PN Invitation letters Assessment plan EXORD Systems CPF RFF Mid Planning Conference Initial Planning Conference Initial PLANORD PDSS FSLO Letter Final Requirements

5 5 UNCLASSIFIED ADF Planning Status General Planning CJOPS Decision Brief for PP12 signed. Command Nomination of O-5 for position of COMASC submitted. Call for nominations for ASNCE staff sent via signal. Engineering Two (2) ADF engineers participated in Indonesia PDSS. Still awaiting Post Activity Report. Authorization to lead as FIE for Indonesia mission still to come from IPDIV. Medical Awaiting nominations for ADF Health PP12 positions from Services. No Change

6 6 UNCLASSIFIED ADF Participation Australia Command Element Engineering Section Medical Personnel contribution of 15 – 20 pers in each contingent Contingent 1 embark USNS MERCY in Guam and change out in Subic Bay Philippines Contingent 2: embark USNS MERCY in Subic Bay Philippines and disembark at the conclusion of mission in Cambodia Health manning TBC in late November HQJOC Health PP12 POC: CMDR Kenneth Walters (SO1 Reg / Dom & Joint Ex Hlth Plans) kenneth.walters@defence.gov.au kenneth.walters@defence.gov.au No Change

7 7 UNCLASSIFIED PP12 RFI Tracker NumberStatusDate ReqResponsibleQuestionOther ADF-001Closed11 Nov 11PACFLTRequest a copy of the Indonesian PDSS itinerary ADF-002Open11 Nov 11PACFLTStatus of Partner Nation invitation letter No Change

8 8 UNCLASSIFIED JSDF Planning Status CONOPS of Japan - Developing the CONOPS of Japan Country selection - Philippine - Vietnam Activities - Medical supports - Community service projects Introduction of culture etc. - Studying other activities - Decision after completion of PDSS Vehicles - JMSDF Ship (TBD× 1 ) - JASDF Aircraft ( C-130 or KC-767× 1) Medical team - Approximately 20~30 No Change

9 9 UNCLASSIFIED JSDF Planning Status PDSS -Request re-survey Philippines with U.S. survey team in FEB or MAR 2012 Humanitarian community in Japan - Not yet access POC PRI : LCDR Haga : j3haga@jso.mod.go.jp DSN:224-7714 or 7723 SEC: LCDR Yamaguchi : j3yamaguchi_m@jso.mod.go.jp No Change

10 10 UNCLASSIFIED JSDF Planning Status NumberStatusdateWGRequests/QuestionsComments JPN -001 19 OCTPDSS Draft plan of PDSS in Philippine and Vietnam JPN-002 30 NOVPDSS Req. re-survey with US survey member in FEB or MAR. No Change

11 11 UNCLASSIFIED NZDF Planning Status Decision by COMD Joint Forces New Zealand is to deploy a small multi- disciplinary health team for the duration of the deployment to Vietnam 10 – 24 Jul 12. Contingent: Plan to embark USNS MERCY in Subic Bay Philippines / disembark at the conclusion of mission in Vietnam. MAJ BROOKS – will attend Main Planning Conference (30 - 31 Jan in San Diego) as HQ JFNZ Rep. Now registered into APAN, awaiting membership to PP12 accounts. Medical Personnel contribution: Manning TBC in early December (8 – 12 pers) New HQJFNZ Health PP12 POC: MAJ Andrew BROOKS DDI: +64 4 529 6124 andrew.brooks@nzdf.mil.nz No Change

12 12 UNCLASSIFIED CPF FOPS Update Manning Update -FFC change in sourcing priorities -Augmentation package is now out for Joint Sourcing w/ a suspense of 23 Jan -Commitment received for med personnel -32 non-med personnel still outstanding -CPF PLANORD released

13 13 Medical Update Medical WG Telcon held Tuesday, 17 January 2012, 1200 hrs Identified Medical Planner to assist with Medical CONOPS development Finalizing details for Medical Assessment visits to the Philippines and Cambodia

14 14 UNCLASSIFIED Engineering Update Site Survey Projects RecommendedSMEE Request Philippines3 schools & 1 medical clinicSeawall-Dr. Lin Cambodia3 health centersBldg; P&E; CCAD Indonesia3 health centers & 1 schoolSeismic; Disaster Vietnam2 health centersDisaster; Safety Australian Defence Force approval is approximately 90% complete. -ADF determination of FIE will follow site survey report Philippine Project Package preparation (ACB1 lead- BUC Sarmiento) Cambodia Project Package preparation (NMCB40 lead) Indonesia Project Package preparation (ADF lead/NMCB40 Alt) Vietnam Project Package preparation (NMCB40 lead) Completed On-trackOff-Track/RecoverableOff-Track not recoverable

15 15 UNCLASSIFIED Engineering Update NALO Flight request submissions. - Confirm ability to land NALO C-130 at Talaud Airport, Indonesia. Inability will require using a combination of Manado Airport and commercial surface shipping. - Confirm ability to land NALO C-130 at Calbayog City, Samar Philippines. - Vietnam mission will require NALO C-130 to land at Hanoi IOT clear customs, movement of equipment and PAX to Nghe An Province via contracted trucks and passenger bus. Identify all customs and entry requirements for Indonesa, Philippines, And Vietnam. - Visa requirements for PAX (30+ days) - Required documents for tools and equipment (customs process and US Embassy customs POC Completed On-trackOff-Track/RecoverableOff-Track not recoverable

16 16 UNCLASSIFIED Logistics Update Logistics WG held 17 Jan 12 Funding –APRI MTF MERCY received $600K of required $1.9M Pharmaceuticals and Consumables –Working with DLA to place initial orders Donation Material Next Logistics WG meeting scheduled for 24 JAN 12

17 17 PP12 Supply and Logistics Status FUNDING (17JAN12) 17 CompletedOn-trackOff-Track/RecoverableOff-Track not recoverable Item / TaskStatusActionDate ReqNotes APRICPF/ SUPPO 31JAN12 - APRI ($600K of $1.9M required received) ORFC7F/ SUPPO 07FEB12 - Requirements review in progress OCOCPF/ SUPPO 15APR12 - Requirements review in progress

18 18 Completed On-trackOff-Track/RecoverableOff-Track not recoverable Item / TaskStatusActionDate ReqNotes Indonesia Load List SUPPO 03FEB12 - Load list developed pending MPC update(s). - Final pharmaceutical list due to FLC Yokusuka contracting post MPC for contract award determination - Requisitioning of standard consumable items commencing week of 17 Jan 12 Philippines Load List SUPPO 03FEB12 - Load list developed pending MPC update(s) - Requisitioning of standard pharmaceutical and consumable items commencing week of 17 Jan 12 Vietnam Load List SUPPO 03FEB12 - Load list developed pending MPC update(s). - Final pharmaceutical list due to FLC Yokusuka contracting post MPC for contract award determination - Requisitioning of standard consumable items commencing week of 17 Jan 12 Cambodia Load List SUPPO 03FEB12 - Load list developed pending MPC update(s) - Requisition of standard pharmaceutical and consumable items commencing week of 17 Jan 12 PP12 Supply and Logistics Status PHARMACEUTICALS and CONSUMABLES (17JAN12)

19 19 Completed On-trackOff-Track/RecoverableOff-Track not recoverable Item / TaskStatusActionDate ReqNotes Load PlanMSC/ SUPPO 31JAN12- Load plan developed pending MSC MERCY approval - 240 pallet maximum established Project Handclasp SUPPO 15MAR12- Preparations ongoing with POC LDSSUPPO 15FEB12- Preparations ongoing with POC Worldwide VETs SUPPO 15MAR12- Preparations ongoing with POC PP12 Supply and Logistics Status DONATION MATERIAL (17JAN12)

20 20 PP12 Civil Affairs WG 20 CompletedOn-trackOff-Track/RecoverableOff-Track not recoverable Item / TaskStatusActionDate ReqNotes CJ-CMCC Concept Paper Dev DESRON17 JAN - Awaiting chops from: DESRON, MERCY, - Chops received from PP 09, 10, 11 reps, COE-DMHA (IHC) -19 JAN CAWG will focus on final inputs CMCC Battle Rhythm and Wagon Wheel Sych DESRON19 JAN - Discussed 13 JAN at C3F, awaiting DESRON battle rhythm to synch with. Non-Medical SMEE CONOPS Draft Plan CAWG23 JAN - On track Operational Assessment Plan CAWGMAR 12 - Assessment WG meeting 20 JAN to produce draft task list which will go out to all WG for validation. -Geared toward MOPs Strategic Assessment Plan CAWGAPR 12 - Geared towards Theater Strategic Objectives NGO and Partner Nation Engagement Process CAWG / CPF N5 MPC - 80% plan post MPC but add-ins will be ongoing.

21 21 Completed On-trackOff-Track/RecoverableOff-Track not recoverable Item / TaskStatusActionDate ReqNotes IT & Radio Operator Manning CPF N3/ CDS / 15JAN12 -Each MEDCAP = 1-IT (HERS) - JCSE IEP (3 ea +OIC= 7 pers ) approved 05DEC - 4+Remote MEDCAP manning review. -Ashore Command Center Annex K / COMM Plan CPF/ C3F/CTF -76/CDS PRE-MPC - IAW NTTP 3-57 Navy HCA OPS -Based on PN/HN COMM interoperability assessments and simultaneous missions. -OPTASK COMMS required. BGAN SATCOM CPF N6/ CDS POST- MPC - Not required for PDSS. (17OCT11 CDS-7 N6 email). - OPTEST CPF BGANs (FEB12). - Develop CONOPS for BGAN use. Host Nation Spectrum Mgt C7F/CTF -76 /CDS PRE-MPC -Determine frequency restrictions for each host nation. PP12 CIS Information Systems Status (18JAN12)

22 22 Completed On-trackOff-Track/RecoverableOff-Track not recoverable Item / TaskStatusActionDate Req Notes PAO NetworkCPF PAO/N6 / CDS/ MERCY PRE-MPC -Defense Video & Imagery Distribution System (DVIDS) : PAO confirmed system is available. Ashore use only. - Verified Fast File Transfer (FFT) SW (version 2.43) Installed in MERCY. FFT IATO cert. in progress at CYBERFOR. PN-NGO Business Center (SSC LANT CHARLESTON) CPF N6 / CDS /MERCY APR12 -SPAWAR PN-NGO Business Center (Wireless and terminals) is the afloat solution. -MERCY to coordinate refresh/OPTEST/training in San Diego by SPAWAR. SOW in development (09JAN12). - CDS procure printer consumables for entire mission. -IA/business rules provided CDS-7 N6 03NOV11. Partner Nation Interoperability CPF N6 / CDS POST- MPC -Verify Partner Nation (PN) CIS POCs. -Verify APAN accounts for all PN CIS WG team members. -PN CIS capability review. -Develop CIS Interoperability Matrix in Annex K. Humanitarian Electronic Record System CIS WG/ CDS N6 TBD -HERS funded by MARFORPAC Experimental Center (MEC) -System status: in development. PP12 CIS Information Systems Status (18JAN12)

23 23 Completed On-trackOff-Track/RecoverableOff-Track not recoverable Item / TaskStatusActionDate Req Notes Remote MED- DENCAP /CC Comms Arch CDS / CPF PRE- MPC -UHF data and voice SATCOM/LOS Comms for CAP to air/ship. -Identify CIS Element architecture and inventory. Host Nation MIL C4 PDSS OIC PDSS AAR -PDSS OICs for assessment action. -Training provided to Blue Team 21OCT11. Host Nation CIVIL Comms PDSS OIC PDSS AAR -PDSS OICs for assessment action. -Training provided to Blue Team 21OCT11. Remote Site US Mission CIS Assessment PDSS OIC/ AOIC PDSS AAR -JCSE Planner not included in PDSS. PDSS AOIC to conduct assessments with provided checklists and guidance. -Command Center (CC) Comms assessment. -Training provided to Blue Team 21OCT11. PDSS CIS Comms CPF/ CDS PDSS OICs PRE- PDSS -Iridium Phones: CPF N6 issued phone to Blue OIC. -In country cell phones: MERCY to provide from PP10 mission phones. -Automated Data Collection (8 cell phones app) issued to OIC. PP12 CIS Information Systems Status (18JAN12) No Change

24 24 Completed On-trackOff-Track/RecoverableOff-Track not recoverable Item / TaskStatusActionDate Req Notes Knowledge Management /Data Protection CDS/ MERCY TBD -MEDCAP/CDS/Mission Data storage and protection Command Center Ashore CIS CDSPDSS AAR -Identify configuration and location in each country. IT SMEE Requests CDSPDSS AAR -PDSS determine scope (SYSADMIN, repair, training, etc.). SATCOM Requests C3F/ C7F/ CDS FEB12 -Standard USN process. Mission COMMs Readiness CDS / MERCY APR12 -Pre-deployment COMM Checks (DVIDS, FTP, FFT, NMCI FAS, MERCY COMMs Suite) PP12 CIS Information Systems Status (18JAN12)

25 25 Completed On-trackOff-Track/RecoverableOff-Track not recoverable Item / TaskStatusActionDate Req Notes FSET on MERCY CPF / MSC TBD - Field Service Engineering Team (FSET) rqmt for San Diego to Hawaii cost estimate from SPAWAR requested 22NOV. Requested SOW status (10JAN12). -Funding transfer to SPAWAR TBD End of Mission CIS Exit Plan CPF/ CDS TBD - Hardware: Transfer custody of loaned CIS items back to CPF -Data Exit Plan: TBD VHF Handheld Radios CPF/ CDS FEB12 -CDS determine required quantities ADVON CISCDSPre-MPC -CDS determine requirements. Embarked Documentary Team CDSOngoing -CDS determine requirements and set expectations -Afloat connectivity limited to NGO Business Center PP12 CIS Information Systems Status (18JAN12)

26 26 UNCLASSIFIED Force Protection Update MFP sourcing drop dead date and branch plan TA possibilities (hotels, routes, etc) HN/In country coordination update Pre-Deployment travel Requirements –Updated ISOPREPs –APACS –iATP –AOR location specific brief –Level I ATFP –SERE 100 B

27 27 UNCLASSIFIED Public Affairs Update -Admin Mission PAO to DC 15-18 JAN for CHINFO/OSD/DOS meetings/coordination for mission roll-out -Media Coordination CAPT Breslau, LCDR Lohmeyer will meet with Warner Bros. and NAVINFO WEST in LA 25 JAN

28 28 UNCLASSIFIED 28 Item/TaskStatusActionSuspense Date Notes PAGCDS PA CPF PA TBD Draft to CDRE 15 DEC Routing will happen D-30 to 45 days DC media trip/mission announcement NSCDS PAAPR 2012 PP Fact SheetCDS PA, CPF PA 30 DEC Mission info to NAVINFO WEST for vetting Smartphone SOP NSCIWG, CPF Social Media 15 MAR Online presence brief CDS PA, CPF PA 9 DEC Social media, websites, etc Completed On-trackOff-Track/RecoverableOff-Track not recoverable Public Affairs Update

29 29 UNCLASSIFIED Item/TaskStatusActionSuspense Date Notes Equipment requirements CDS PA, NPASE TBD Dialogue initiated w/ MERCY on 04 JAN PO&AM inputsCDS PA, CPF PA 14 DEC Due to FOPS. PA-specific updates in progress Media Training Plan CDS PA TBD Training to CDS leadership and mission participants COMREL purchase list CPF PA TBD Will request final approval after MPC 29 Completed On-trackOff-Track/RecoverableOff-Track not recoverable Public Affairs Update

30 30 UNCLASSIFIED PP12 Communication Integration Finalizing products to support detailed communication planning and assessment for each location (due 30 JAN) Coordinating communication assessment support for PP12 (MAY – SEP 12) –Include “baseline” and post-mission support Next CIWG meeting scheduled for: 19 JAN 12 AMEMB Cambodia, Vietnam Telecons being coordinated

31 31 PP12 Communication Integration 31 CompletedOn-trackOff-Track/RecoverableOff-Track not recoverable Item / TaskStatusActionDate ReqNotes Stakeholder Analysis CIWG15 NOV - Initial product completed. Briefing with Commodore Morgan scheduled for early Dec. Characterize Information Environment CPF N2/N39 15 NOV – 30 JAN -Political Military Economic Social Infrastructure and Information (PMESII) product status is as follows: Cambodia 100%, Indonesia 100%, Vietnam 99%, Philippines 95%. Communication Strategy/ Implementation Plan CPF N2/N39 31 DEC - This product will detail integrated approach for internal, external messaging. This product will be a draft until finalized as an Annex to the CPF PP12 Campaign Plan. Identify/Coordinate key messaging events CIWG15 JAN - Identified; coordinating CIWG support: -- ETG Leadership Training -- MPC Assessment planning -- SLV support Develop messaging products CIWG/ CPF N2/N39, PA 15 APR - Not started.

32 32 PP12 Communication Integration 32 CompletedOn-trackOff-Track/RecoverableOff-Track not recoverable Item / TaskStatusActionDate ReqNotes Develop communication MOE Indicators CIWG/ N2/N39 15 JAN - Part of overall PP12 assessment effort. Define Communication assessment methodology CPF N2/N39 30 JAN - Part of overall PP12 assessment effort. Coordinate and monitor communication during execution CPF N2/N39 During PP12 - Not started. Part of overall PP12 assessment effort. Conduct communication assessment CIWGDuring PP12 - Not started. Develop AARCPF N2/N39, PA 30 SEP - Not started.

33 33 Planning Timeline UPDATED: 18JAN12 INDICATES UPDATE

34 34 Mission Commander Priorities Country CONOPS Development –23-Jan-12COUNTRY CONOPS (DRAFT) TO CDRE –30-Jan-12MPC (PRESENT DRAFT CONOPS) –C2/Task Organization Proposal (next slide) CMCC / ENG / MED / EST / Shore FP – requires additional C2 slides to show organization and relationships –Issues: Dedicated medical planner –Prioritized list of MEDCAPs to aid in SOM development Veterinarian – tasked w/ COBRA GOLD & day job; adversely affects contribution to CONOPS Need refined SMEE list for each country EAP input Determining Medical contingent for ADVON / Mission –LT Owens – incorrect specialty code, may be ineligible for ADVON –CDR Currie – unable to participate in mission/deploy –LTJG Ward – only med planner

35 35 NOTE: CMCC, ENG, MED, EST, Shore FP – requires additional C2 slides to show organization and relationships

36 36 MPC –Official agenda released in announcement message (CDS7 062325ZJAN12) –29JAN12 – Civilian Participant Planning and Discussion (USNS MERCY) –30-31JAN12 – MPC (Admiral Kidd Conference Center) DUE DATECOGTOPICTASK DESCRIPTIONSTATUS 18-Nov-11CPF / CDS7 - N1MPCOBTAIN VENUE (RESERVATION) FOR MPC (ADMIRAL KIDD)COMPLETED 18-Nov-11CPFMPCFUNDING APPROVED FOR MPCCOMPLETED 2-Dec-11CDS7 - N3MPCOBTAIN DRAFT AGENDA FROM PREVIOUS MPCCOMPLETED 16-Dec-11CDS7 - CS1 RUBIOMPC DV GIFT TRACKER (TBD - DEPENDS ON RFI TO CPF) - GIFT FOR MPC = COINSCOMPLETED 16-Dec-11CDS7 - CS1 RUBIOMPCORF FOR DV GIFTS (TBD - DEPENDS ON RFI TO CPF)IN PROGRESS 16-Dec-11CDS7 - N3MPCSOCIAL - DETERMINE VENUECOMPLETED 16-Dec-11CPF - LCDR RIOSMPC RFI: DV GIFTS (PRIVATE) - DETERMINE PROTOCOL / APPROPRIATENESSCOMPLETED 16-Dec-11CPFMPCOBTAIN POC INFO FOR WELCOME LETTERS / PACKAGESCOMPLETED 28-Dec-11CPF / CDS7 - N1MPC SEND OUT MPC INVITATIONS [INCLUDE SOCIAL FEES, UNIFORM REQUIREMENTS, BRIEF SUBMISSION GUIDELINES, INTERPRETERS, POC INFO, RSVP DATE & TRAVEL INFO, NO HOST SOCIAL, ATTIRE, AGENDA, DELIVERABLES]COMPLETED 28-Dec-11CPF / CDS7 - N1MPCLODGING ARRANGEMENTS [COURTYARD MARRIOT - LIBERTY STATION]COMPLETED 28-Dec-11CDS7 - N3MPCSEND OUT ANNOUNCEMENT MESSAGECOMPLETED 28-Dec-11CDS7 - N3MPCPROMULGATE AGENDA FOR PP12 MPCCOMPLETED 28-Dec-11CDS7 - N3MPC PROMULGATE BRIEF COLLECTION / TIMELINE FOR SUBMISSION (PLACE IN MSG - UNCLAS ONLY, NO FOUO)COMPLETED 28-Dec-11CDS7 - N3MPCSOCIAL - RESERVATIONCOMPLETED 11-Jan-12CPFMPCGOV PURCHASE CARD / CONTRACTCOMPLETED 11-Jan-12CPFMPC ARRANGE REFRESHMENT/SETUP PACKAGE (WATER, COFFEE, LINEN, PODIUM, MICROPHONE, PROJECTORS)COMPLETED 20-Jan-12CPF / CDS7 - N3MPC ARRANGE VANS/TRANSPORTATION [6 VANS / 4X HN DV, 2X TRANSPORTATION]IN PROGRESS Mission Commander Priorities (continued)

37 37 DUE DATECOGTOPICTASK DESCRIPTIONSTATUS 20-Jan-12CPF / CDS7 - N3MPC SOCIAL - TRANSPORTATION REQUIREMENTS (1 VAN - REQUEST TO BE ROUTED)IN PROGRESS 23-Jan-12CPFMPCDV TRANSPORTATION / TRAVELIN PROGRESS 23-Jan-12CPFMPC IDENTIFY DV ESCORTS [TENTATIVE LIST - PENDING FORMAL RSVP]IN PROGRESS 23-Jan-12CDS7 - N1MPCASSEMBLE PARTICIPANT LIST (RSVP) / POC LISTIN PROGRESS 23-Jan-12CPFMPCARRANGE INTERPRETERS FOR PN / HOST NATIONIN PROGRESS 23-Jan-12CDS7 - FPOMPCBASE ACCESS REQUESTIN PROGRESS 23-Jan-12CDS7 - N3MPC VENUE PARKING ARRANGEMENTS [COORDINATE WITH ADMIRAL KIDD]COMPLETED 24-Jan-12CDS7 - PAOMPCCDRE OPENING / CLOSING REMARKS [SPEECH]IN PROGRESS 25-Jan-12CDS7 - N3MPCSTAFF PLAN (ROLES & RESPONSIBILITIES)IN PROGRESS 25-Jan-12CDS7 - N3MPCVENUE SETUP PLANIN PROGRESS 25-Jan-12CDS7 - N3MPC SECURE ADDITIONAL PERSONNEL TO ASSIST WITH MPC EXECUTION: VAN DRIVERS, PARKING ATTENDANTS, CHECK- IN DESK, SET-UP/BREAKDOWN TEAMIN PROGRESS 27-Jan-12CDS7 - N1MPCNAMETAGS / BADGESIN PROGRESS 27-Jan-12CDS7 - N1 / N2 / PAOMPC WELCOME PACKAGE: AGENDA, POC LIST, LOCAL ESTABLISHMENTS, MAPS/DIRECTIONS, SOCIAL EVENT INFOIN PROGRESS 27-Jan-12CDS7 - N2 / N3 / PAO / N6MPC VENUE SETUP: SIGNAGE, CHECK-IN TABLE, FOOD TABLES, MAIN AREA, BREAKOUT SESSION, DV ASSIGNED SEATING/NAME PLACARDS, A/V, WHITEBOARDS / EASELS, DRY ERASE MARKERS [RFI - WHEN CAN SETUP BEGIN]IN PROGRESS 27-Jan-12CDS7 - N3MPCDRAFT CONOPS PRINTED IN BINDERS FOR DVSIN PROGRESS 30-Jan-12CDS7 - N1MPC CONFERENCE [SOCIAL] FEES / COLLECTION / PRICING / RECEIPT BOOKIN PROGRESS 30-Jan-12CDS7 - N1MPCSOCIAL - FUNDINGIN PROGRESS 30-Jan-12CDS7 - N6MPCELECTRONICS SETUP (PROJECTOR / LAPTOPS)IN PROGRESS 30-Jan-12CDS7 - PAOMPCPHOTO SESSION - EQUIPMENT, PHOTOGRAPHER, LOCATIONIN PROGRESS 3-Feb-12CDS7 - N3MPC DISTRIBUTE BRIEFS POST MPC (APAN) [UNCLAS ONLY, NO FOUO]IN PROGRESS Mission Commander Priorities (continued) MPC - POA&M (continued)

38 38 Mission Commander Priorities (continued) CMCC TTX (01FEB12) –Initial objectives: Organization review Job description assignment Workspace familiarization Communications familiarization CMCC problem solving (scenario – walk-thru/talk-thru) –Participant List TBD SLV preparations –Issues: CPF participant requested Vietnam visas Agenda / KLE Miscellaneous –Manning / Billet gaps –Proposed Mission Planning Rhythm in development –CMCC Watchfloor products in development: SORM / SOPs Watchbills PPRs

39 39 UNCLASSIFIED Closing Questions/Comments CPF Staff State Dept – Mr. Weinz AUS HQ JOC HQ JFNZ JSDF FLC-Yokosuka C7F C3F CTF 76 351 st Civil Affairs Command DLA Troop Support - Pacific 30 th NCR ETG HSC-21 DET 2 MCAST USNS MERCY CDS-7

40 40 UNCLASSIFIED 40 BACKUPS

41 41 Contact List Working Group CPF MedicalMr. Dean Tano 808 471 2463 dean.tano@navy.mil LogisticsLCDR Tim Graham 808 474 7814 timothy.graham@navy.mil CommsMr. Mike Gurath 808 474 6382 michael.gurath@navy.mil Force Protection Capt James McKeon 808 471 8229 james.mckeon@navy.mil Comm Integration CDR Ingrid Rader ingrid.rader@navy.mil 41 Working Group CPF EngineeringMr. Gary Basham 805 982 6102 gary.basham@navy.mil Civil AffairsLCDR Ric Arthur 808 474 4458 richard.c.arthur@navy.mil Public AffairsLT Lauren Gammache lauren.gammache@navy.mil 808 471 3769 Country Desk RP, CB, VN LCDR John Rios 808 474 9633 john.j.rios@navy.mil Country Desk ID Mr. Takashi Yamamoto 808 4746912 takashi.yamamoto@navy.mil

42 42 Contact List ORGContact CPFLCDR Rob Hulse 808 474 8526 robert.g.hulse@navy.mil CPFLCDR Dave Leather 808 471 8661 David.leather@navy.mil CPFCDR Joyce Blanchard 808 474 6954 joyce.blanchard@navy.mil C3FMAJ Sean Williams 619 767 4803 sean.p.williams@navy.mil C7FCDR Tom Long thomas.long@lcc19.navy. mil 42 ORGContact CTF-76LTJG Joel Hammen joel.hammen@fe.navy.mil AUSSQNLDR (O4) Owen Gardner +612 6128 4027 owen.gardner@defence.gov.au JPNLCDR Haga j3haga@jso.mod.go.jp NZMAJ Andrew Brooks DDI: +64 4 529 6124 Andrew.brooks@nzdf.mil.nz


Download ppt "PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 18 JAN 12 OPT Brief."

Similar presentations


Ads by Google