Presentation is loading. Please wait.

Presentation is loading. Please wait.

PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 26 OCT 11 OPT Brief.

Similar presentations


Presentation on theme: "PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 26 OCT 11 OPT Brief."— Presentation transcript:

1 PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 26 OCT 11 OPT Brief

2 2 UNCLASSIFIED Roll Call CDS-7 State Dept – Mr. Weinz PACOM USARPAC USNS MERCY AUS HQ JOC HQ JFNZ JSDF FLC-Yokosuka C7F C3F CTF 76 351 st Civil Affairs Command DLA Troop Support - Pacific 30 th NCR HSC-23 MCAST

3 3 UNCLASSIFIED PP 12 Weekly Planning Rhythm ThursFriSatSun 1300-1500W OPT VTC 1000W read ahead slides posted to APAN 0900W CA WG 1300W LOG WG 1200W MED WG 1300W FP WG Every other week MonTuesWed 1000W COMMS WG 1000W Comm Integration WG CPF N33 Update CPF N3 Semi-Monthly Update 1200W ENG WG No Change

4 4 UNCLASSIFIED SEPOCTNOVDECJANFEBMARAPRMAYJUNJULAUG Mission Planning/CONOPS (CPF) Meetings/Conferences (CPF/CDS) Force Sourcing (CPFN3) Interagency Coord (CPF N5) NGO Coordination (CPF N5) Partner Nations (CPF/C7F) Transit Plan (CPF/CDS) Funding/Authorizations (CPF) Communications (CPF N6) Assessment (CPF MAG) Detailed CONOPS (CDS) PDSS/Advanced Echelon (CDS) Deployment (CDS) Planning Timeline PDSS Advanced Echelon Deployment MOU Letters Signed PN Invitation letters Assessment plan PLANORD EXORD Requirements Systems Final Initial FSLO Letter CPF RFF Mid Planning Conference Initial Planning Conference

5 5 UNCLASSIFIED ADF Planning Status General Planning CJOPS Decision Brief for PP12 signed Command Engineering Medical ADF Health manning to PP12 planning under way No Change

6 6 UNCLASSIFIED ADF Participation Australia Command Element Engineering Section Medical Personnel contribution of 15 – 20 pers in each contingent Contingent 1 embark USNS MERCY in Guam and change out in Subic Bay Philippines Contingent 2: embark USNS MERCY in Subic Bay Philippines and disembark at the conclusion of mission in Cambodia Health manning TBC in late November HQJOC Health PP12 POC: CMDR Kenneth Walters (SO1 Reg / Dom & Joint Ex Hlth Plans) kenneth.walters@defence.gov.au kenneth.walters@defence.gov.au MAJ Dominic Wade (SO2 Joint Ex Hlth Plans) dominic.wade@defence.gov.au (until 2 Dec 11)dominic.wade@defence.gov.au

7 7 UNCLASSIFIED PP12 RFI Tracker NumberStatusDate ReqResponsibleQuestionOther ADF-001

8 8 UNCLASSIFIED JSDF Planning Status CONOPS of Japan - Developing the CONOPS of Japan Country selection - Philippine - Vietnam Activities - Medical supports - Community service projects Introduction of culture etc. - Studying other activities - Decision after completion of PDSS Vehicles - JMSDF Ship (TBD× 1 ) - JASDF Aircraft ( C-130 or KC-767× 1) Medical team - Approximately 20~30 No Change

9 9 UNCLASSIFIED JSDF Planning Status PDSS - 5 persons / each country Philippine and Vietnam Planners - MED, Ship visit, and others Humanitarian community in Japan - Not yet access POC LCDR Haga j3haga@jso.mod.go.jp DSN:224-7714 or 7723 No Change

10 10 UNCLASSIFIED JSDF Planning Status NumberStatusdateWGRequests/QuestionsComments JPN -001 19 OCTPDSS Draft plan of PDSS in Philippine and Vietnam No Change

11 11 UNCLASSIFIED NZDF Planning Status -Decision brief has been prepared for COMD Joint Forces New Zealand based on FST deployment to Vietnam 10 – 24 Jul 12. No Change

12 12 UNCLASSIFIED Force Sourcing Update No Change 71 Unsourced Billets Updated breakdown will be provided next week. USAF sourcing 16 billets. Mass Comms Specialist LAD 23APR.

13 13 Medical Update Medical WG Telcon held on 25 Oct 11 Next one scheduled for Wed, 3 Nov 11, 1200 HST All medical team members for PDSS Blue and Gold teams identified

14 14 Engineering Update Engineering Working Group: Mondays 1500PST –PDSS teams have been assembled, 5 PAX total per country –CONOPS being developed to determine FIE/SIE feasibility. –Possible engagement in Exercise Pacific Angel, VNM phase. RFI’s –Can US provide transportation support for an AUS FIE? –What is the Commanders guidance for logistics support ashore? –What ship to shore capability exists to support engineer LOO? –How will PN, HN life support requirements be met? –Who is responsible for non-US PDSS funding? –What is the C4I/Comm plan for VNM phase? –What C4I support can be provided for AUS contingent? –From HN, what are priority SMEE topics for engineers? No Change

15 15 UNCLASSIFIED Logistics Update PDSS: –PDSS Logistic team set for departure Husbanding Requirements – ongoing discussions with SUPPO MERCY, FLC Yokosuka and FLC Singapore –Potential long-lead time requirements –Ports under Contracted support vs non-contracted

16 16 UNCLASSIFIED Civil Affairs Working Group No Change COMPACFLT VTC CONFIRMATION SHEET VTC HELP DESK PHONE NUMBER (808) 474-8506 / 4941 EMAIL vtc.cpf@navy.mil Set-up time for this VTC: ONE HOUR VTC CLASSIFICATION UNCLASSED CONFERENCE VTC Date and Time: 17 OCT 1930Z – 2100Z / 0930-1100 HST HOST and Participants,Area CodeVTC DIAL-UP NUMBER SPEED 1. (HOST) COMPACFLT808474-1760128 2. Participant: Commander Destoyer Squardon 7 808474-1761128 3. Participant: USNS MERCY808474-1762128 4. Participant: US ARMY 351st808474-1763128 5. Participant: MCAST808484-4910128 6. Participant: Naval Post Grad School808484-4911128 7. Participant: COE808484-4912128 9. Participant: AUDIO ONLY FOR UP TO 9 PARTICIPANTS 808-471-2663 Host Code 8506 WG time changed to 0900 Hawaii standard time. Location changed to Main VTC room

17 17 UNCLASSIFIED 17 Completed On-trackOff-Track/RecoverableOff-Track not recoverable Item / TaskStatusActionDate ReqNotes IT & Radio Operator Manning CPF N3/ CDS / 01DEC11 - CPF N3 Global Force Manager FORAC: Each MEDCAP = 2-IT (CHIME), 1-JCSE IEP (TBD). 4 MEDCAPS maximum (8 ITs, 4 IEP). Annex K / COMM Plan CPF N6/C7F/ C3F/ CDS PRE-MPC - IAW NTTP 3-57 Navy HCA OPS -Based on PN/HN COMM interoperability assessments and simultaneous missions. -OPTASK COMMS required. BGAN SATCOM CPF N6/ CDS PRE-MPC - Not required for PDSS. (17OCT11 CDS-7 N6 email). - OPTEST CPF BGANs (JAN12). - Develop CONOPS for BGAN use. Host Nation Spectrum Mgt C7F N6 /CDS PRE-MPC -Determine frequency restrictions for each host nation. PP12 CIS Information Systems Status (26OCT11)

18 18 UNCLASSIFIED 18 Completed On-trackOff-Track/RecoverableOff-Track not recoverable Item / TaskStatusActionDate ReqNotes PAO NetworkCPF PAO/N6 / CDS/ MERCY PRE-MPC -Defense Video & Imagery Distribution System (DVIDS) : PAO determine if available. Ashore use only. - Verified Fast File Transfer (FFT) SW (version 2.43) Installed in MERCY. Verifying current IATO cert. PN-NGO Business Center (SSC LANT CHARLESTON) CPF N6 / CDS /MERCY APR12 -SPAWAR PN-NGO Business Center (Wireless and terminals) is the afloat solution. -MERCY to coordinate refresh/OPTEST/training in San Diego by SPAWAR. Determine coat/SOW. - CDS procure printer consumables for entire mission. -IA/business rules. Partner Nation Interoperability CPF N6 / CDS POST-MPC -Verify Partner Nation (PN) CIS POCs. -Verify APAN accounts for all PN CIS WG team members. -PN CIS capability review. -Develop CIS Interoperability Matrix in Annex K. Humanitarian Electronic Record System (HERS) CIS WG/ CDS N6 TBD -Mission funded by MARFORPAC Experimental Center (MEC) -PDSS Automated Data Collection training complete 21OCT11 at CPF. ADC capability deploying w/ PDSS. PP12 CIS Information Systems Status (26OCT11)

19 19 UNCLASSIFIED 19 Completed On-trackOff-Track/RecoverableOff-Track not recoverable Item / TaskStatusActionDate ReqNotes Remote MED- DENCAP /CC Comms Arch CDS / CPF/ JCSE TBD -UHF data and voice SATCOM/LOS Comms for CAP to air/ship. -JCSE IEP dynamic solution approval in progress. Host Nation MIL C4 PDSS OIC PDSS -PDSS OICs for assessment action. -Training provided to Blue Team 21OCT11. Host Nation CIVIL Comms PDSS OIC PDSS -PDSS OICs for assessment action. -Training provided to Blue Team 21OCT11. Remote Site US Mission CIS Assessment PDSS OIC/ AOIC PDSS -JCSE Planner not included in PDSS. PDSS AOIC to conduct assessments with provided checklists and guidance. -Command Center (CC) Comms assessment. -Training provided to Blue Team 21OCT11. PDSS CIS Comms CPF/ CDS PDSS OICs PRE- PDSS -Iridium Phones: CPF N6 issued phone to Blue OIC. -In country cell phones: MERCY to provide from PP10 mission phones. -Automated Data Collection (8 cell phones app) issued to Blue OIC. PP12 CIS Information Systems Status (26OCT11)

20 20 UNCLASSIFIED 20 Completed On-trackOff-Track/RecoverableOff-Track not recoverable Item / TaskStatusActionDate ReqNotes Knowledge Management /Data Protection CDS/ MERCY TBD -MEDCAP/CDS/Mission Data storage and protection Command Center Ashore CIS CDSPDSS -Identify configuration and location in each country. IT SMEE Requests CDSPDSS -PDSS determine scope (SYSADMIN, repair, training, etc.). SATCOM Requests C3F/ C7F/ CDS FEB12 -Standard USN process. MERCY COMMs Suite Groom CDS / MERCY APR12 -Determine groom requirements PP12 CIS Information Systems Status (26OCT11)

21 21 UNCLASSIFIED 21 Completed On-trackOff-Track/RecoverableOff-Track not recoverable Item / TaskStatusActionDate ReqNotes FSET on MERCY CPF / MSC TBD - Field Service Engineering Team (FSET) rqmt determination by CDS-7 pending -Funding transfer to SPAWAR TBD End of Mission CIS Exit Plan CPF/ CDS TBD -Transfer custody of loaned CIS items back to CPF Knowledge Management /Data Protection CDS/ MERCY TBD -MEDCAP/CDS/Mission Data storage and protection PP12 CIS Information Systems Status (26OCT11)

22 22 UNCLASSIFIED Force Protection Update FPWG held Tuesday, 25 Oct. Next FPWG, 8 Nov. PDSS Pre-Travel Requirements –Updated ISOPREPs –APACS –iATP –AOR location specific brief –Level I ATFP –SERE 100 B NCIS/Security Requirements: Informal N2 RFI

23 23 UNCLASSIFIED Public Affairs Update -Request PAO workspace in Bldg 55 -ADSW on track for 1 DEC start Integrate with CPF staff 7-23 NOV -Media Coordination Discovery Channel embark Thai Channel 5 embark Social media embeds -Drafting Mission PAG -Coordinate DVIDS training for PA team Equipment request No Change

24 24 UNCLASSIFIED PP12 Communication Integration Initial Stakeholder analysis complete Working draft communication “plan” to include assessment Communication Framework: Pacific Partnership (2012) brings enhanced capability, opportunity for subject matter expert exchange and a venue for broadened regional relationship building at HN invitation The story of Pacific Partnership (2012): Will have shared ownership (providers, recipients, enablers) and be told from these individual perspectives Will be told by the HN, PNs and NGOs Will be focused on key, distinctive audiences vice single audience saturation and will leverage emerging media Will be synchronized across time and space to ensure consistency (or approach and message) and stakeholder engagement to achieve desired goals Will be echoed by other activities, operations and engagements (PVST, SMEE) Will be captured, assessed and archived No Change

25 25 UNCLASSIFIED Mission Commander Current Priorities PDSS Preparations –Confirm / Finalize Participants –Status of: VISAs, FP requirements, medical requirements, passports, travel arrangements –Current Concerns? PDSS Planning –In country transit/Site visit schedule/Agenda for OIC and AOIC in Manila Identify Personnel Augments –PAO, PA team –Protocol Officer (CDS 7 Staff Action) –CIV-MIL officer (CDS 7 Staff Action) Mission Training –Identify Mission Rehearsal Dates (March?) –PA/Integrated Communications Training Budget –Confirm funds available –Execution plan? CMOC –Mission Statement –Structure/Deliverable No Change

26 26 UNCLASSIFIED Closing Questions/Comments CPF Staff State Dept – Mr. Weinz PACOM USARPAC USNS MERCY AUS HQ JOC HQ JFNZ JSDF FISC-Yokosuka C7F C3F CTF 76 351 st Civil Affairs Command DLA Troop Support - Pacific 30 th NCR HSC-23 MCAST CDS-7

27 27 UNCLASSIFIED 27 BACKUPS

28 28 Contact List Working Group CPF MedicalDean Tano 808 471 2463 dean.tano@navy.mil LogisticsLCDR Leigh Kisnorbo 808 474 2492 leigh.kisnorbo.as@navy.mil CommsMike Gurath 808 474 6382 michael.gurath@navy.mil Force Protection Capt James McKeon 808 471 8229 james.mckeon@navy.mil Comm Integration CDR Ingrid Rader ingrid.rader@navy.mil 28 Working Group CPF EngineeringMr. Gary Basham 805 982 6102 gary.basham@navy.mil Civil AffairsCDR Joyce Blanchard 808 474 6954 joyce.blanchard@ navy.mil Country Desk RP, CB, VN LCDR John Rios 808 474 9633 john.j.rios@navy.mil Country Desk ID Mr. Takashi Yamamoto 808 4746912 takashi.yamamoto@ navy.mil

29 29 Contact List ORGContact CPFLCDR Rob Hulse 808 474 8526 robert.g.hulse@navy.mil CPFLCDR Dave Leather 808 471 8661 David.leather@navy.mil CPFCDR Joyce Blanchard 808 474 6954 joyce.blanchard@ navy.mil C3FMAJ Sean Williams 619 767 4803 sean.p.williams@navy.mil C7FCDR Tom Long thomas.long@ lcc19.navy.mil 29 ORGContact CTF-76CDR Lance Moritz 011 81 98 954 1605 lance.moritz@fe.navy.mil AUSCDR Kenneth Walters 02 6128 4473 Kenneth.walters@ defence.gov.au JPNLCDR Haga j3haga@jso.mod.go.jp NZMAJ Mark Walters DDI: +64 4 529 6702 mark.walters@nzdf.mil.nz


Download ppt "PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 26 OCT 11 OPT Brief."

Similar presentations


Ads by Google