PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief.

Similar presentations


Presentation on theme: "PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief."— Presentation transcript:

1 PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief

2 2 Roll Call CDS-7 State Dept – Mr. Weinz USNS MERCY AUS HQ JOC HQ JFNZ JSDF FLC-Yokosuka C7F C3F CTF 76 351 st Civil Affairs Command DLA Troop Support - Pacific ETG 30 th NCR HSC-21 DET 2 MCAST Blue: Normal participants not expected to attend VTC due to scheduling conflict.

3 3 PP 12 Weekly Planning Rhythm ThursFriSatSun 1300-1500W OPT VTC 1100W read ahead slides posted to APAN 1000W CA WG 1300W LOG WG 1200W MED WG 1300W FP WG Every other week MonTuesWed 1000W COMMS WG 1430W Comm Integration WG CPF N3 Semi-Monthly Update 1200W ENG WG Effective 09 JAN

4 4 UNCLASSIFIED SEPOCTNOVDECJANFEBMARAPRMAYJUNJULAUG Mission Planning/CONOPS (CPF) Meetings/Conferences (CPF/CDS) Force Sourcing (CPFN3) Interagency Coord (CPF N5) NGO Coordination (CPF N5) Partner Nations (CPF N5/C7F) Final Transit Plan (CDS) Funding/Authorizations (CPF) Communications (CPF N6) Assessment (CPF MAG) Detailed CONOPS (CDS) PDSS/Advanced Echelon (CDS) Deployment (CDS) Planning Timeline Advanced Echelon Deployment MOU Letters Signed Assessment plan EXORD Systems CPF RFF Mid Planning Conference Initial Planning Conference Initial PLANORD PDSS FSLO Letter Final Requirements PN Invitation letters

5 5 ADF Planning Status General Planning CJOPS Decision Brief for PP12 signed. Command Nomination of O-5 for position of COMASC submitted. Call for nominations for ASNCE staff sent via signal. Engineering Two (2) ADF engineers participated in Indonesia PDSS. Still awaiting Post Activity Report. Authorization to lead as FIE for Indonesia mission still to come from IPDIV. Medical Awaiting nominations for ADF Health PP12 positions from Services. No Change

6 6 ADF Participation Australia Command Element Engineering Section Medical Personnel contribution of 15 – 20 pers in each contingent Contingent 1 embark USNS MERCY in Guam and change out in Subic Bay Philippines Contingent 2: embark USNS MERCY in Subic Bay Philippines and disembark at the conclusion of mission in Cambodia Health manning TBC in late November HQJOC Health PP12 POC: CMDR Kenneth Walters (SO1 Reg / Dom & Joint Ex Hlth Plans) kenneth.walters@defence.gov.au kenneth.walters@defence.gov.au No Change

7 7 UNCLASSIFIED PP12 RFI Tracker NumberStatusDate ReqResponsibleQuestionOther ADF-001Closed11 Nov 11PACFLTRequest a copy of the Indonesian PDSS itinerary ADF-002Open11 Nov 11PACFLTStatus of Partner Nation invitation letter No Change

8 8 JSDF Planning Status CONOPS of Japan - Developing the CONOPS of Japan Country selection - Philippine - Vietnam Activities - Medical supports - Community service projects Introduction of culture etc. - Studying other activities - Decision after completion of PDSS Vehicles - JMSDF Ship (TBD× 1 ) - JASDF Aircraft ( C-130 or KC-767× 1) Medical team - Approximately 20~30 No Change

9 9 JSDF Planning Status PDSS -Request re-survey Philippines with U.S. survey team in FEB or MAR 2012 Humanitarian community in Japan - Not yet access POC PRI : LCDR Haga : j3haga@jso.mod.go.jp DSN:224-7714 or 7723 SEC: LCDR Yamaguchi : j3yamaguchi_m@jso.mod.go.jp No Change

10 10 JSDF Planning Status NumberStatusdateWGRequests/QuestionsComments JPN -001 19 OCTPDSS Draft plan of PDSS in Philippine and Vietnam JPN-002 30 NOVPDSS Req. re-survey with US survey member in FEB or MAR. No Change

11 11 NZDF Planning Status Decision by COMD Joint Forces New Zealand is to deploy a small multi- disciplinary health team for the duration of the deployment to Vietnam 10 – 24 Jul 12. Contingent: Plan to embark USNS MERCY in Subic Bay Philippines / disembark at the conclusion of mission in Vietnam. MAJ BROOKS – will attend Main Planning Conference (30 - 31 Jan in San Diego) as HQ JFNZ Rep. Now registered into APAN, awaiting membership to PP12 accounts. Medical Personnel contribution: Manning TBC in early December (8 – 12 pers) New HQJFNZ Health PP12 POC: MAJ Andrew BROOKS DDI: +64 4 529 6124 andrew.brooks@nzdf.mil.nz No Change

12 12 CPF FOPS Update Manning Update -FFC change in sourcing priorities -Augmentation package was due back from Joint Sourcing on 23 Jan -Army input still outstanding, needed for 351 st (16 pax) and 807 th (25 pax) support -FFC Staffing not submitted -Commitment received for med personnel -CPF PLANORD released

13 13 Medical Update Medical WG Telcon held Tuesday, 24 January 2012, 1200 hrs LT JG Ward to attend MPC and stay to assist with Medical CONOPS development –Funding provided by CPF and MERCY Medical assessment to Philippines is GTG Per ODC during 1/24 telcon, medical assessment to Cambodia rescheduled –26 March – 3 April

14 14 Engineering Update Site Survey Projects RecommendedSMEE Request Philippines3 schools & 1 medical clinicSeawall-Dr. Lin Cambodia3 health centersBldg; P&E; CCAD Indonesia3 health centers & 1 schoolSeismic; Disaster Vietnam2 health centersDisaster; Safety Australian Defence Force approval is approximately 90% complete. -ADF determination of FIE will follow site survey report Philippine Project Package preparation (ACB1 lead- BUC Sarmiento) Cambodia Project Package preparation (NMCB40 lead) Indonesia Project Package preparation (ADF lead/NMCB40 Alt) Vietnam Project Package preparation (NMCB40 lead) Completed On-trackOff-Track/RecoverableOff-Track not recoverable

15 15 Engineering Update Indonesia SMEEs: 1.Seismic Construction Practices 2.Disaster Response Plans Philippine SMEEs: 1.Project planning training using Microsoft Projects software 2.Repair and/or reconstruction of seawalls Vietnam SMEEs: 1.Construction Safety Practices 2.Engineer Disaster Response Plans Cambodia SMEEs: 1.Building Plan Development 2.Water Quality Completed On-trackOff-Track/RecoverableOff-Track not recoverable

16 16 Logistics Update Logistics WG held 24 Jan 12 Reviewing proposed Medical CONOPS to develop logistics support plan(s) Funding –APRI (No Change) MTF MERCY received $600K of required $1.9M Pharmaceuticals and Consumables –Working with DLA to assign Call Numbers for initial orders Donation Material (No Change) Next Logistics WG meeting scheduled for 7 Feb 12

17 17 PP12 Supply and Logistics Status FUNDING (25 JAN12) 17 CompletedOn-trackOff-Track/RecoverableOff-Track not recoverable Item / TaskStatusActionDate ReqNotes APRICPF/ SUPPO 31JAN12 - APRI ($600K of $1.9M required received) ORFC7F/ CDS-7/ SUPPO 07FEB12 - Requirements review in progress OCOCPF/ SUPPO 15APR12 - Requirements review in progress NO CHANGE

18 18 Item / TaskStatusActionDate ReqNotes Indonesia Load List SUPPO 03FEB12 - Load list developed pending MPC update(s). - Final pharmaceutical list due to FLC Yokusuka contracting post MPC for contract award determination - Working with DLA to assign Call Numbers for requisitioning of standard consumable items Philippines Load List SUPPO 03FEB12 - Load list developed pending MPC update(s) - Working with DLA to assign Call Numbers for requisitioning of standard pharmaceutical and consumable items Vietnam Load List SUPPO 03FEB12 - Load list developed pending MPC update(s). - Final pharmaceutical list due to FLC Yokusuka contracting post MPC for contract award determination - Working with DLA to assign Call Numbers for requisitioning of standard consumable items Cambodia Load List SUPPO 03FEB12 - Load list developed pending MPC update(s) - Working with DLA to assign Call Numbers for requisitioning of standard pharmaceutical and consumable items 18 Completed On-trackOff-Track/RecoverableOff-Track not recoverable PP12 Supply and Logistics Status PHARMACEUTICALS and CONSUMABLES (25JAN12)

19 19 Item / TaskStatusActionDate ReqNotes Load PlanMSC/ SUPPO 31JAN12- Load plan developed pending MSC MERCY approval - 240 pallet maximum established Project Handclasp SUPPO 15MAR12- Preparations ongoing with POC LDSSUPPO 15FEB12- Preparations ongoing with POC Worldwide VETs SUPPO 15MAR12- Preparations ongoing with POC 19 Completed On-trackOff-Track/RecoverableOff-Track not recoverable PP12 Supply and Logistics Status DONATION MATERIAL (25JAN12) NO CHANGE

20 20 Item / TaskStatusActionDate ReqNotes IT & Radio Operator Manning CPF N3/ CDS / 15JAN12 -Each MEDCAP = 1-IT (HEIS) - JCSE IEP (3 ea +OIC= 7 pers ) approved 05DEC - 4+Remote MEDCAP manning review. -Ashore Command Center Annex K / COMM Plan CPF/ C3F/CTF -76/CDS PRE-MPC - IAW NTTP 3-57 Navy HCA OPS -Based on PN/HN COMM interoperability assessments and simultaneous missions. -OPTASK COMMS required. BGAN SATCOM CPF N6/ CDS POST- MPC - Not required for PDSS. (17OCT11 CDS-7 N6 email). - OPTEST CPF BGANs (FEB12). - Develop CONOPS for BGAN use. Host Nation Spectrum Mgt C7F/CTF -76 /CDS PRE-MPC -Determine frequency restrictions for each host nation. 20 Completed On-trackOff-Track/RecoverableOff-Track not recoverable PP12 CIS Information Systems Status (25JAN12) No Change

21 21 Item / TaskStatusActionDate Req Notes PAO NetworkCPF PAO/N6 / CDS/ MERCY PRE-MPC -Defense Video & Imagery Distribution System (DVIDS) : PAO confirmed system is available. Ashore use only. - Verified Fast File Transfer (FFT) SW (version 2.43) Installed in MERCY. FFT ATO pkg in development at DMA. PAO assist requested PN-NGO Business Center (SSC LANT CHARLESTON) CPF N6 / CDS /MERCY APR12 -SPAWAR PN-NGO Business Center (Wireless and terminals) is the afloat solution. -MERCY to coordinate refresh/OPTEST/training in San Diego by SPAWAR. SOW in development (09JAN12). - CDS procure printer consumables for entire mission. -IA/business rules provided CDS-7 N6 03NOV11. Partner Nation Interoperability CPF N6 / CDS POST- MPC -Verify Partner Nation (PN) CIS POCs. -Verify APAN accounts for all PN CIS WG team members. -PN CIS capability review. -Develop CIS Interoperability Matrix in Annex K. Health Engagement Information System (HEIS) CIS WG/ CDS N6 TBD -HERS funded by MARFORPAC Experimental Center (MEC) is not available. -CIS and Medical WG reviewing alternatives. 21 Completed On-trackOff-Track/RecoverableOff-Track not recoverable PP12 CIS Information Systems Status (25JAN12)

22 22 Item / TaskStatusActionDate Req Notes Remote MED- DENCAP /CC Comms Arch CDS / CPF PRE- MPC -Draft CIS Element architecture and inventory under review at CDS-7 (20JAN12) Host Nation MIL C4 PDSS OIC PDSS AAR -PDSS OICs for assessment action. -Training provided to Blue Team 21OCT11. Host Nation CIVIL Comms PDSS OIC PDSS AAR -PDSS OICs for assessment action. -Training provided to Blue Team 21OCT11. Remote Site US Mission CIS Assessment PDSS OIC/ AOIC PDSS AAR -JCSE Planner not included in PDSS. PDSS AOIC to conduct assessments with provided checklists and guidance. -Command Center (CC) Comms assessment. -Training provided to Blue Team 21OCT11. PDSS CIS Comms CPF/ CDS PDSS OICs PRE- PDSS -Iridium Phones: CPF N6 issued phone to Blue OIC. -In country cell phones: MERCY to provide from PP10 mission phones. -Automated Data Collection (8 cell phones app) issued to OIC. 22 Completed On-trackOff-Track/RecoverableOff-Track not recoverable PP12 CIS Information Systems Status (25JAN12)

23 23 Item / TaskStatusActionDate Req Notes Knowledge Management /Data Protection CDS/ MERCY TBD -MEDCAP/CDS/Mission Data storage and protection Command Center Ashore CIS CDSPDSS AAR -Identify configuration and location in each country. IT SMEE Requests CDSPDSS AAR -PDSS determine scope (SYSADMIN, repair, training, etc.). SATCOM Requests C3F/ C7F/ CDS FEB12 -Standard USN process. Mission COMMs Readiness CDS / MERCY APR12 -Pre-deployment COMM Checks (DVIDS, FTP, FFT, NMCI FAS, MERCY COMMs Suite) 23 Completed On-trackOff-Track/RecoverableOff-Track not recoverable PP12 CIS Information Systems Status (25JAN12) No Change

24 24 Item / TaskStatusActionDate Req Notes FSET on MERCY CPF / MSC TBD - Field Service Engineering Team (FSET) rqmt for San Diego to Guam cost estimate from SPAWAR received 11JAN12. SD-Guam SOW requested 20JAN12.. -Funding transfer to SPAWAR TBD End of Mission CIS Exit Plan CPF/ CDS TBD - Hardware: Transfer custody of loaned CIS items back to CPF -Data Exit Plan: TBD VHF Handheld Radios CPF/ CDS FEB12 -CDS determine required quantities ADVON CISCDSPre-MPC -CDS determine requirements. Embarked Documentary Team CDSOngoing -CDS determine requirements and set expectations -Afloat connectivity limited to NGO Business Center 24 Completed On-trackOff-Track/RecoverableOff-Track not recoverable PP12 CIS Information Systems Status (25JAN12)

25 25 Force Protection Update MFP Sourcing: Four Marines, possibly participation at MPC –C7F/CTF-76 tasking to re-analyze manning needs PIVA update MPC coordination Pre-Deployment travel Requirements –Updated ISOPREPs –APACS –iATP –AOR location specific brief –Level I ATFP –SERE 100 B

26 26 Public Affairs Update -Admin Mission PAO to DC 15-18 JAN for CHINFO/OSD/DOS meetings/coordination for mission roll-out -Media Coordination CAPT Breslau, LCDR Lohmeyer will meet with Warner Bros. and NAVINFO WEST in LA 25 JAN

27 27 Public Affairs Update Item/TaskStatusActionSuspense Date Notes PAGCDS PA CPF PA TBD Draft to CDRE 15 DEC Routing will happen D-30 to 45 days DC media trip/mission announcement NSCDS PAAPR 2012 PP Fact SheetCDS PA, CPF PA 30 DEC Mission info to NAVINFO WEST for vetting Smartphone SOP NSCIWG, CPF Social Media 15 MAR Online presence brief CDS PA, CPF PA 9 DEC Social media, websites, etc 27 Completed On-trackOff-Track/RecoverableOff-Track not recoverable

28 28 Public Affairs Update Item/TaskStatusActionSuspense Date Notes Equipment requirements CDS PA, NPASE TBD Dialogue initiated w/ MERCY on 04 JAN PO&AM inputsCDS PA, CPF PA 14 DEC Due to FOPS. PA-specific updates in progress Media Training Plan CDS PA TBD Training to CDS leadership and mission participants COMREL purchase list CPF PA TBD Will request final approval after MPC 28 Completed On-trackOff-Track/RecoverableOff-Track not recoverable

29 29 CAWG Update (25 JAN) Item / TaskStatusActionDate ReqNotes CJ-CMCC Concept Paper Dev CPF N5 10 FEB -Awaiting chops from MTF - Chops received and incorporated from DESRON, PP 09, 10, 11 reps, COE-DMHA (IHC) -Next action: CMCC concept document will finalized during MPC TTX. CMCC Battle Rhythm Sych DESRON19 JAN - Inputs submitted to DESRON. Non-Medical SMEE CONOPS Draft Plan CAWG23 JAN -Complete - Plan details will continue to be added, as possible, between now and ADVON deployment. However, CONOP finalization will not occur until ADVON. Operational Assessment Plan CAWGMAR 12 - Assessment WG has produced draft task list which will be socialized and refined during WGs. -Geared toward MOPs Strategic Assessment Plan CAWGAPR 12 - Geared towards Theater Strategic Objectives NGO and Partner Nation Engagement Process CAWG / CPF N5 MPC - 80% plan post MPC but add-ins will be ongoing.

30 30 Projected Host and Partner Nation Participation by Port Host / Partner Nation Material / Platform Support Personnel Participation by Port SDHIGUIDRP VNKMGUHISD POC IndonesiaFP, Engineers, Medical LCDR Chris Giacomaro GiacomaroCM@state.gov Philippines FP, Engineers, Medical LCDR Scott Alms AlmsSC@state.gov Vietnam FP, Engineers, Medical LTC Wayne Turnbull TurnbullPW@state.gov Cambodia FP, Engineers, Medical LTC Kristin Means MeansKA@state.gov MeansKA@state.gov Australia Lead for ID Engineer FIE Medical 15-20 PAX Engineer Section CMDR Kenneth Walters: kenneth.walters@defence.gov.au SQNLDR Owen Gardner, owen.gardner@defence.gov.au. Canada Medical/Dental 9 May 15 Pax 4 July 15 Pax 4 Sep CAPT Lee Gagne LEE.GAGNE@forces.gc.ca Japan JMSDF Ship Aircraft (C-130 or KC-767) Medical Team: 20-30 pax LCDR Haga : j3haga@jso.mod.go.jp j3haga@jso.mod.go.jp LCDR Haga : j3haga@jso.mod.go.jp j3haga@jso.mod.go.jp New Zealand8-12 PAX Medical Team MAJ Andrew Brooks andrew.brooks@nzdf.mil.nz SingaporeMedical team Major Chow Weien: CHOW_Weien@starnet.gov.sg Thailand Medical, Engineers and CA LCDR Jason Starmer starmer@jusmagthai.org starmer@jusmagthai.org Chile 1 Pax Medical 5 July 24 July LCDR Julian Maldonado Julian.maldonado.cl@navy.mil

31 31 Projected NGO Participation by Port NGO Expected Contribution Personnel Participation by Port SDHIGUIDRP VNKMGUHISD POC UCSD PreDental Society Dental, Translators Dr. Irv Silverstein: 619-840- 3288 dsilverstein22@cox.net LDS CharitiesMedical Dr Susan Puls: PulsSu@ldschurch.org Mr. Fred Riley: RileyFM@LDSChurch.org 801-240-8580 Project Hope Medical Mr. Matt Petersen: mpeterson@projecthope.org 540-467-5524/ 540-837-9554 Hope World Wide Translators for Indonesia (awaiting number required from DESRON ) Mr. Charles Ham: charles_ham@hopeww.org Office: 62-21-600-9091 Project Handclasp TBD Mr. Paul Brown / Lt Aron Rotklein: aron.rotklein@navy.mil 619- 532-1492 Vets Without Borders TBD Dr Thomas Graham: tgraham@dcn.davis.ca.us Office 916-769-3696 World Vets TBD Dr Katie Horn: animalloverkate@gmail.com 509-290-0509 / 505-8949- 4093 University of Hawaii Medical, Engineers UNCLASSIFIED

32 32 Projected NGO Participation by Port NGO Expected Contribution Personnel Participation by Port SDHIGUIDRP VNKMGUHISD POC EWC TBDVricella, Gene VricellG@EastWestCenter.org VricellG@EastWestCenter.org VMAP 5 doctors fluent in Vietnamese and translators Nguyen K. Nguyen President of VNMAP Program nguyen.nguyen@vnmap.org Global Grins Donation of toothbrushes EWOB Engineers UNCLASSIFIED

33 33 PP12 APRI/OHDACA Status: 17JAN11 PP12 PACOM approved APRI budget$2,500,000.00 APRI Expended by PACFLT$727,786.25 APRI on-hand at PACFLT$522,213.75 APRI remaining at PACOM$1,250,000.00 Total APRI Remaining $1,772,213.75 PP12 PACOM Tentative OHDACA budget$912,000.00 OHDACA Expended by PACFLT$0.00 OHDACA on-hand at PACFLT$0.00 OHDACA remaining at PACOM$912,000.00 Total OHDACA Remaining$912,000.00 APRI Summary OHDACA Summary

34 34 Canadian Team Two CA Teams –Team One: HS support to Indonesia and Philippians Duration - 8 May to 3 Jul 12 Embark - PEARL HARBOR 9 May 12 Disembark - SUBIC BAY 4 Jul 12 –Team Two: HS support to Vietnam and Cambodia Duration – 3 Jul to 4 Sep 12 Embark – SUBIC BAY 4 Jul 12 Disembark – PEARL HARBOR 4 Sep 12

35 35 Canada: HSS TO&E *Focus – Primary Care* 1x GDMO (Capt/Maj)1x DO (Capt/Maj) 1x Liaison Officer (Capt)1x Physio (Lt/Capt) 3x GDNO (Lt/Capt)1x Dent Tech (Cpl/Sgt) 7x Med Tech (1x Sgt QL6A, 2x MCpl QL5A, 4x Cpl/Pte) TOTAL: 15

36 36 PP12 Communication Integration Finalizing products to support detailed communication planning and assessment for each location (due 30 JAN) Coordinating communication assessment support for PP12 (MAY – SEP 12) –Include “baseline” and post-mission support –Linguist support Next CIWG meeting scheduled for: 26 JAN 12 AMEMB Cambodia, Vietnam Telecons being coordinated

37 37 PP12 Communication Integration 37 Completed On-trackOff-Track/Recoverable Off-Track not recoverable Item / TaskStatusActionDate ReqNotes Stakeholder Analysis CIWG15 NOV - Initial product completed. Briefing with Commodore Morgan scheduled for early Dec. Characterize Information Environment CPF N2/N39 15 NOV – 30 JAN -Political Military Economic Social Infrastructure and Information (PMESII) product status is as follows: Cambodia 100%, Indonesia 100%, Vietnam 99%, Philippines 95%. Communication Strategy/ Implementation Plan CPF N2/N39 31 DEC - This product will detail integrated approach for internal, external messaging. This product will be a draft until finalized as an Annex to the CPF PP12 Campaign Plan. Identify/Coordinate key messaging events CIWG15 JAN - Identified; coordinating CIWG support: -- ETG Leadership Training -- MPC Assessment planning -- SLV support Develop messaging products CIWG/ CPF N2/N39, PA 15 APR - Not started.

38 38 PP12 Communication Integration 38 CompletedOn-trackOff-Track/RecoverableOff-Track not recoverable Item / TaskStatusActionDate ReqNotes Develop communication MOE Indicators CIWG/ N2/N39 15 JAN - Part of overall PP12 assessment effort. Define Communication assessment methodology CPF N2/N39 30 JAN - Part of overall PP12 assessment effort. Coordinate and monitor communication during execution CPF N2/N39 During PP12 - Not started. Part of overall PP12 assessment effort. Conduct communication assessment CIWGDuring PP12 - Not started. Develop AARCPF N2/N39, PA 30 SEP - Not started.

39 39 Planning Timeline UPDATED: 18JAN12 INDICATES UPDATE

40 40 Mission Commander Priorities Country CONOPS Development –30-Jan-12MPC (PRESENT DRAFT CONOPS) Mid Planning Conference (29-31JAN) –29JAN Civilian Participant Planning and Discussion (USNS MERCY) –30-31JAN MPC Agenda (next slide) (ADMIRAL KIDD CONF CENTER) CMCC TTX (01FEB12) –Notification/agenda/objectives provided; participants confirm via RSVP SLV preparations –Big-block travel arrangements made –Issues: CPF participant requested Vietnam Visas (What is the backup plan?) Agenda / KLE Miscellaneous –Manning / billet gaps (lacks a clear path to resolution) –Landside FP sourcing (lacks a clear path to resolution) –Proposed Mission Planning Rhythm in development –CMCC Watchfloor products in development: SORM / SOPs / Watchbills / PPRs

41 41 PP12 MPC Agenda 30JAN12 0700-0800 REGISTRATION 0800-0805 PP12 MISSION COMMANDER OPENING REMARKS (CDS7 N00) 0805-0815 ADMIN REMARKS (CDS7 N3) 0815-0900 CONOPS - INDONESIA (CDS7 PDSS/ADVON GOLD OIC) 0900-0910 BREAK 0910-0955 CONOPS - PHILIPPINES (CDS7 PDSS/ADVON BLUE OIC) 0955-1005 BREAK 1005-1050 CONOPS - VIETNAM (CDS7 PDSS/ADVON GOLD OIC) 1050-1100 BREAK 1100-1145 CONOPS - CAMBODIA (CDS7 PDSS/ADVON BLUE OIC) 1145-1300 MPC GROUP PHOTO / LUNCH BREAK 1300-1600 FUNCTIONAL WORKING GROUPS 1600-1630 WRAP UP MEETING / WAY AHEAD FOR 31JAN (WORKING GROUP LEADS, PDSS/ADVON OIC/AOIC, COORDINATORS) 1800-2000 SOCIAL (SAMMY'S WOODFIRED PIZZA, POINT LOMA/LIBERTY STATION) 31JAN12 0730-0745 ADMIN REMARKS (CDS7 N3) 0745-1200 FUNCTIONAL WORKING GROUPS (CONT) 1200-1300 LUNCH 1300-1530 FUNCTIONAL WORKING GROUPS (CONT) 1530-1550 DELIVERABLES / WRAP-UP (CDS7 N3) 1550-1600 PP12 MISSION COMMANDER CLOSING REMARKS (CDS7 N00)

42 42 Closing Questions/Comments CPF Staff State Dept – Mr. Weinz AUS HQ JOC HQ JFNZ JSDF FLC-Yokosuka C7F C3F CTF 76 351 st Civil Affairs Command DLA Troop Support - Pacific 30 th NCR ETG HSC-21 DET 2 MCAST USNS MERCY CDS-7

43 43 BACKUPS

44 44 Contact List Working Group CPF MedicalMr. Dean Tano 808 471 2463 dean.tano@navy.mil LogisticsLCDR Tim Graham 808 474 7814 timothy.graham@navy.mil CommsMr. Mike Gurath 808 474 6382 michael.gurath@navy.mil Force Protection Capt James McKeon 808 471 8229 james.mckeon@navy.mil Comm Integration CDR Ingrid Rader ingrid.rader@navy.mil Working Group CPF EngineeringMr. Gary Basham 805 982 6102 gary.basham@navy.mil Civil AffairsLCDR Ric Arthur 808 474 4458 richard.c.arthur@navy.mil Public AffairsLT Lauren Gammache lauren.gammache@navy.mil 808 471 3769 Country Desk RP, CB, VN LCDR John Rios 808 474 9633 john.j.rios@navy.mil Country Desk ID Mr. Takashi Yamamoto 808 4746912 takashi.yamamoto@navy.mil 44

45 45 Contact List ORGContact CPFLCDR Rob Hulse 808 474 8526 robert.g.hulse@navy.mil CPFLCDR Dave Leather 808 471 8661 David.leather@navy.mil CPFCDR Joyce Blanchard 808 474 6954 joyce.blanchard@navy.mil C3FMAJ Sean Williams 619 767 4803 sean.p.williams@navy.mil C7FCDR Tom Long thomas.long@lcc19.navy. mil ORGContact CTF-76LTJG Joel Hammen joel.hammen@fe.navy.mil AUSSQNLDR (O4) Owen Gardner +612 6128 4027 owen.gardner@defence.gov.au JPNLCDR Haga j3haga@jso.mod.go.jp NZMAJ Andrew Brooks DDI: +64 4 529 6124 Andrew.brooks@nzdf.mil.nz 45


Download ppt "PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 25 JAN 12 OPT Brief."