First Baptist Church Donelson Nashville, Tennessee.

Similar presentations


Presentation on theme: "First Baptist Church Donelson Nashville, Tennessee."— Presentation transcript:

1 First Baptist Church Donelson Nashville, Tennessee

2 Qualifications  29 Years of Experience (1981- 2010)  Exclusively Serving the Church Market Specializing in Renovations  Church Interiors is a licensed corporation in the State of North Carolina. Church Interiors serves churches from New York to Florida and all states east of the Mississippi. Also included is Texas and Louisiana. We have been in business since 1981, and have participated in over 10,000 partial or complete renovations.  Church Interiors has an unlimited general contractor's license in the State of Tennessee (#00061818). All of our projects are covered by a general liability policy (#BOP9027389) in the amount of $5,000,000.00. All workers on the job site are fully covered individually and backed up by a worker's compensation policy (#WC9035340).  Church Interiors has rendered services to over 100 renovations in the Nashville area alone.  Church Interiors is endorsed and recommended by Lifeway Christian Books Stores and The Lifeway Architectural Department

3 Construction A. Demolition 1. Remove existing sound control table. 2. Demo front wall as needed to remove old baptistery. 3. Remove old grill cloth from 2 boxes on sanctuary ceiling, choir ceiling. B. Construction 1. Build Sound Booth a. Frame new sound booth in same location. b. Install sheetrock in the inside and wainscot on the outside with an oak cap. c. Install laminated counter top with six drawers underneath. c. Install laminated counter top with six drawers underneath. 2. Baptistery a. Reframe as needed for new baptistery. b. Install new plumbing for baptistery. c. Furnish, deliver and Install a new fiber glass (Dry Minister) baptistery model #8 D/E with window. Overall width 3’-7 ½”, height 3’-6”, length 11’-5”, and depth 3’-5”. c. Furnish, deliver and Install a new fiber glass (Dry Minister) baptistery model #8 D/E with window. Overall width 3’-7 ½”, height 3’-6”, length 11’-5”, and depth 3’-5”. d. Baptistery will be pre-plumbed. e. Baptistery to have Aqua-Seal. f. Install 5.5 KW auto fill system with drain and overflow. g. Repair front wall where it was demoed for baptistery installation. 3. Grill Cloth a. Install new grill cloth on 2 boxes on sanctuary ceiling, choir ceiling.

4 Painting Furnish all labor, materials, and expenses to provide the following painting per the following specifications: 1. All walls shall be sanded, caulked and dusted clean prior to any finish applications. 2. We will remove any loose caulking around trim and re-caulk all trim throughout to facilitate good quality finish in all areas to be painted. 3. All walls, ceiling and trim shall receive two coats of paint or as many as needed to achieve a good quality journeyman level of work. All paint materials will be top of the line as manufactured by ICI Dulux or Sherwin Williams Paints. We will leave paint formulas and one gallon of each color for the church’s future use. 4. Our painters will be responsible for touch-up work as needed throughout the duration of work done by Church Interiors, Inc. AREAS TO PAINT (walls, ceiling and trim): Main sanctuary Chancel / Pulpit area BalconyNarthex

5 Painting

6 Floor Covering A. Furnish, deliver and install our high quality 20-year warranty Churchlon Ovation carpet direct glue down wall to wall for the following areas: carpet direct glue down wall to wall for the following areas: Main Sanctuary Floor. Main Sanctuary Floor. Steps and landings leading up to the balcony. Steps and landings leading up to the balcony. Balcony Steps and Risers. Balcony Steps and Risers. Border treatment in the vestibule Border treatment in the vestibule Churchlon Ovation is a 40-oz. extremely durable, 100% nylon cut and loop style commercial carpet and has a 20 year wear warranty. Because of its unique construction, it will show less tracking, have better appearance retention, will reflect sound better, will be more durable, and will help hide soil better than standard cut pile carpet. Ovation is an ideal floor covering for worship areas. Churchlon Ovation is constructed on a 1/8" gauge with 12 stitches per inch with a density factor of 5,929 ounces per cubic yard. Churchlon Ovation has permanent anti-static control and has been treated with Teflon. B. Furnish deliver and install Churchlon Reflection carpet direct glue down in the following areas: Narthex field Churchlon Reflection is a 38 oz extremely durable, 100% continuous filament nylon textured heather loop style commercial carpet. Churchlon Reflection is manufactured using the Ultra Performance Backing System which gives the carpet a lifetime edge ravel warranty and a lifetime wear warranty. Because of its unique construction Churchlon Reflection will not show tracking, have superior appearance retention and will reflect sound better than standard cut pile carpet.

7

8 Border Treatment

9 New Furnishings Furnish, deliver and install the following church furniture manufactured by Rugel Church Furnishings, Jefferson City, Tennessee Main Sanctuary floor: 30 pews 12’-0” 16 pews 15’-0” 2 pews 9’-0” 2 pews 10’-0” Balcony: 2 pews 7’-0” 2 pews 8’-0” 4 pews 10’-0” 2 pews 13’-0” 4 pews 14’-0” 8 pews 13’-6” 2 pews 20’-0”

10 New Furnishings (cont.)  Our proposal is based on a white waterfall Colonial pew end 2 ¼” thick 2 ply maple with stained caps and bases.  The pew body will be upholstered on the seat, back and rear side of back.  All intermediate supports will be 1 1/2" thick, 2- ply solid Northern Red Oak with a stained finish.  The pews will come complete with hymnbook racks which have communion cup holders, card and pencil holders.  The bookracks will be manufactured of solid Northern Red Oak.  Fabric style, fabric color, and stain color to be chosen at a later date.

11 General Requirements  This renovation project includes the following general requirements:  General Liability Insurance $5,000,000.00  Workmen’s Compensation Insurance  Co-ordination meetings  Dumpster  Professional Clean-Up at end of project

12 Proposal Summery I. Construction$33,400.00 II. Painting $33,116.00 III. Floor Covering $24,768.00 IV. New Furnishings $69,470.00 V. General Requirements$ 8,500.00 Grand Total for Proposed Renovation Project $169,254.00 NOT INCLUDED: -Electrical -Job Permitting ALTERNATES: Theater seating in balcony in lieu of Pews Add…………………………….$5,000.00 NOTE: This contract is for the scope of work outlined in this proposal. The church should add an allowance of 7% to cover unforeseen items and changes that arise during the renovation process. This contract is for the scope of work outlined in this proposal. The church should add an allowance of 7% to cover unforeseen items and changes that arise during the renovation process.

13

14 Audio  We will install a YAMAHA M7CL-48 48 channel digital console in the sanctuary  We will also install five new AUDIX MB1250 choir microphones and new cable  We will also pull and terminate all new microphone/signal cabling.

15 Audio  We will install two TANNOY I7 low profile column monitors one each on the side walls of the choir; these speakers are designed to have even vertical coverage and wide horizontal coverage to help support the choir as needed  We will also install a new QSC CX302 power amplifier to drive the new choir monitors.

16 Video  Install 2 60” flat screen plasma monitors on left and right side of baptistry opening  Provide all cabling for this installation  Provide video switcher - scaler  Includes all equipment, labor, engineering, delivery, installation and training.

17 Electronic Dimming System  This dimming system will have 12 scenes with multiple preset zones of light  4 Entry stations with preset easy on buttons  This Electronic Dimming System allows full control of the entire lighting system from master locations such as an audio and video booth.  It controls such individual areas (zones) of the sanctuary nave, choir, sconces, pulpit, altar, cross, communion table, instrument areas and balcony.  Dimmers pay for themselves.  Dimming the lights 25% will save 20% on electrical costs and makes incandescent lights lasts 4 times longer and dimming the lights 50% returns a 40% savings on electricity and incandescent lights will last 20 times longer.

18 Audio/Video Proposal Summary  Audio$35,435.00  Video$11,491.00  Dimming$ 7,434.00  A/V Total$54,360.00

19 Renovation Summary  Sanctuary $169,254.00  Audio/Video $ 54,360.00  Total Renovation $223,614.00