1 Bond Construction Program Long Beach City College District November 2006

2 Cordoba Corporation

3 CORDOBA CORPORATION is a civil engineering and construction management firm specializing in educational facilities, transportation systems, and water infrastructure. Cordoba is headquartered in Los Angeles and has an office in Oakland, California. Cordoba has successfully completed hundreds of projects throughout its 23 year history, and has evolved into one of the leading firms in the nation. Cordoba Corporation was founded in 1983 by George L. Pla as a specialized urban planning firm, and has been heavily involved in the development of California’s infrastructure. Cordoba’s business model has been regaled for its efficiency, speed, and for its multifaceted approach toward projects, and has been featured as a case study at the Harvard Business School. m a n a g e m e n t

4 Cordoba Corporation Cordoba Corporation combines the technical expertise of our engineers and construction managers with an understanding of public policy and infrastructure development to shape the world around us. Cordoba has consistently been recognized by Hispanic Business Magazine to be among the 200 largest firms in the United States, the 50 largest "high tech" businesses in the nation, and among the 10 largest service providers in California. The Los Angeles Business Journal has ranked Cordoba one of the top ten most established minority-owned firms and one of the fastest growing companies in Los Angeles. m a n a g e m e n t

5 The BMT Team

6 Bond Management Team, Cordoba Bill Adams Program Director Angel Alvarez Deputy Program Director Gene Farrell Project Advisor m a n a g e m e n t

7 Bond Management Team, Cordoba Laura Tocco Cost Engineer Lisa Jones Contracts Administrator Tony Gilbert Financial Analyst m a n a g e m e n t

8 Bond Management Team, Cordoba Gilbert Esquibel Document Control Joe Johnson, Jr. Scheduler Dave Hall CADD/IT/Move Mgmt. m a n a g e m e n t

9 Bond Management Team, Cordoba Mike Soto Sr. Construction Manager Ann Kovara Sr. Construction Manager Jim Espinosa Sr. Construction Manager m a n a g e m e n t

10 Bond Management Team, Cordoba Lisa Hernandez Asst. Construction Manager Gerardo Jimenez Field Engineer Tracie Powell Field Engineer m a n a g e m e n t

11 Bond Management Team, Cordoba Jill Hayes Administrative Asst. Graphic Designer Sharon Stureman Administrative Asst. Document Control Nicole Velarde Administrative Asst. Consultant m a n a g e m e n t

12 Bond Management Team, Cordoba Sonia Babian Intern Field Engineer Ashi Martin Intern Jose Jimenez Intern m a n a g e m e n t

13

14 Liberal Arts Campus Featured Projects

15 South Quad Complex A new state-of-the-art building will be constructed on the "Golf Mall" area of the Liberal Arts Campus. The modern facility will house both academic and administrative offices. The instructional portion of the complex will provide needed "smart" classrooms for the Creative Arts and Applied Science, History and Political Science, and Public Service Departments. Additionally, the facility will house the Superintendent's offices as well as other administrative offices. Construction has begun on the relocation and improvement of site utilities including replacement of obsolete data and telecommunication lines. l i b e r a l a r t s

16 South Quad Complex l i b e r a l a r t s

17 Interim Facility - Vet's Stadium/District Facilities & Warehouse Complex During the construction of the Technology Phase 2 project the existing building requires demolition. Interim housing must be provided as early as June, 2005 for the existing occupants. The southeast corner of the Veteran's Stadium parking lot has been chosen as the preferred option for the interim site. Once the occupants vacate and move into their new facility at PCC the space will be retrofitted and become the new Facilities and Maintenance home. l i b e r a l a r t s

18 Interim Facility - Vet's Stadium/District Facilities & Warehouse Complex l i b e r a l a r t s

19 Building R Façade Replacement The LAC Gymnasium (Building R) Façade Replacement was undertaken with great care to restore it to its original beauty. Water and earthquake damage caused the façade to fail requiring a much needed face lift. The completion of this project contributes to the progress of campus upgrade and development. l i b e r a l a r t s

20 Building R Façade Replacement l i b e r a l a r t s

21 Pacific Coast Campus Featured Projects

22 Child Development Center Construction is completed on this new comprehensive academic/vocational child development teaching facility, which trains students for immediate employment and/or transfer to a four- year institution. The state-of-the-art facility provides a dynamic classroom experience covering physical, motor, cognitive, social, emotional, and linguistic growth and development. p a c i f i c c o a s t

23 Child Development Center p a c i f i c c o a s t

24 New Industrial Technology Phase 1 A new state-of-the-art facility will be constructed at the north end of PCC to replace antiquated facilities. The facility will provide integration of computer and media technology for the training and retraining of students in the industrial trades, including video-enhanced demonstration labs and lecture classrooms. p a c i f i c c o a s t

25 New Industrial Technology Phase 1 p a c i f i c c o a s t

26 Completed Construction Projects PCC CDC – 4/06 District Facilities & Warehouse Complex – Opened 1/17/06 Men’s Gym Boiler Replacement – 4/06 PCC MM/NN Lighting Upgrade – 4/05 LAC Athletic Field – 3/06 South Quad Complex - Bid Pkg. #1 – 12/05 LAC/LRC Utilities–6/06 LAC Men’s Gym Façade Replacement (FEMA & Insurance Funded)

27 Current & Upcoming Construction Projects South Quad Complex – Bid #2 LAC Central Plant Structure LAC Learning Resource Center - Interim South Quad Complex Structure PCC Central Plant & Utilities PCC Learning Resource Center PCC Industrial Tech Phase 1 PCC Industrial Tech Phase 2 PCC Economic Development & Culinary Arts Facility