Presentation is loading. Please wait.

Presentation is loading. Please wait.

Spring 2013 Fidelity and SI 2013 Facilitative Team Time Design Team Meeting January 14, 2013.

Similar presentations


Presentation on theme: "Spring 2013 Fidelity and SI 2013 Facilitative Team Time Design Team Meeting January 14, 2013."— Presentation transcript:

1 Spring 2013 Fidelity and SI 2013 Facilitative Team Time Design Team Meeting January 14, 2013

2 Today’s Agenda

3 Welcome and Introductions Team MemberDivisionRole Adriane MingoERDLeader Donna AlbaughERD Content Design/NCEES Abbey FutrellERDContent Design/Technology Heather MullinsERDContent Design Becky PearsonERDContent Design Mary Keel/Cynthia MartinERDContent Design Spring 2013 Fidelity Check Design Sub-Team

4 Welcome and Introductions Team MemberDivisionRole Jessica GarnerERDLeader Dianne MeiggsERD Content Design/NCEES Jason RhodesERDContent Design/Technology Heather StewartERDContent Design Dan SparlinDigital Teaching and Learning Content Design TBDDST/C&IContent Design Summer Institute Content Design Sub-Team

5 Possible Team Norms for F2F and Virtual Meetings Respectfully communication as allies Be actively involved Contribute openly to discussions Volunteer for responsibilities Focus on established goals, and focus on solutions, not problems Thoughtfully involve others Assume the best of colleagues

6 Our Mission/Vision 2013 Spring LEA Fidelity Check SI 2013 Facilitative Team Time (FTT) LEAs to build upon the Fall Fidelity Check and to begin working and planning for SI 2013. LEAs to walk away with a plan for ensuring PD capacity

7

8 Shared Topics and Ideas SI Topics http://region1rttt.ncdpi.wikispaces.net/SI+2013+Topicshttp://region1rttt.ncdpi.wikispaces.net/SI+2013+Topics Learning Forward Content –https://www.dropbox.com/sh/pl9hl169g2l3i6f/_K6E1b1OOXhttps://www.dropbox.com/sh/pl9hl169g2l3i6f/_K6E1b1OOX Teacher Leadership SMART Goals LEA Collaboration –Need to develop a process Monitoring PD - Guskey 4 and 5 Sustainability Prep. work for PD Academy Making connections with agency initiatives Connection with Fall Fidelity –http://rt3nc.ncdpi.wikispaces.net/Fidelity+Checkshttp://rt3nc.ncdpi.wikispaces.net/Fidelity+Checks How to get the information down to the teacher level? Resources

9 Next Steps Set- up meeting schedule (Adriane, Jessica, Beth) Develop timeline for sub-team work (Fidelity content deadline February 22, 2013) (FTT Sub-team to determine once given timeline from Yvette) Design objectives/big rocks (Both teams to begin this work.)

10 Questions and Concerns


Download ppt "Spring 2013 Fidelity and SI 2013 Facilitative Team Time Design Team Meeting January 14, 2013."

Similar presentations


Ads by Google