ArchSD ARCHITECTURAL SERVICES DEPARTMENT Case Study Project Data Sheung Shui Slaughter House Project Cost $1.8 Billion Total GFA58,000m 2 Project Inceptionmid.

Similar presentations


Presentation on theme: "ArchSD ARCHITECTURAL SERVICES DEPARTMENT Case Study Project Data Sheung Shui Slaughter House Project Cost $1.8 Billion Total GFA58,000m 2 Project Inceptionmid."— Presentation transcript:

1 ArchSD ARCHITECTURAL SERVICES DEPARTMENT Case Study Project Data Sheung Shui Slaughter House Project Cost $1.8 Billion Total GFA58,000m 2 Project Inceptionmid 1995 Commencement on SiteFeb 1997 Completion DateJun 1999 Completion of CommissioningMar 2000

2 ArchSD ARCHITECTURAL SERVICES DEPARTMENT Case Study Project Goal Sheung Shui Slaughter House Environmental Benefits Land use Benefits Cost Benefits Triple Benefits

3 ArchSD ARCHITECTURAL SERVICES DEPARTMENT Case Study Sheung Shui Slaughter House Publicly operated abattoir was running with a deficit Privatize operation for cost-effective reasons Cost Benefit

4 ArchSD ARCHITECTURAL SERVICES DEPARTMENT Case Study Land use Benefits Sheung Shui Slaughter House Re-provision the 3 existing abattoirs Releasing 4.19 hectares of land for new developments which are more compatible with the surrounding areas Sheung Shui Slaughter House

5 ArchSD ARCHITECTURAL SERVICES DEPARTMENT Case Study Environmental Benefit Sheung Shui Slaughter House Existing facilities built in the 60s, creating environmental nuisance to the densely populated area New slaughter house located away from built- up areas but convenience to rail Sheung Shui Slaughter House

6 ArchSD ARCHITECTURAL SERVICES DEPARTMENT Case Study Environmental Benefit Sheung Shui Slaughter House Trains no longer have to go into town and people living along the railway line need not suffer the noise and odour nuisance caused by the pigs & cattle Purposely built railway : direct off-loading of livestock from train to lairage

7 ArchSD ARCHITECTURAL SERVICES DEPARTMENT Case Study Procurement Strategy Sheung Shui Slaughter House Design + Construct + Commissioning Contract One point control from design to operational stage Contractor to ensure compliance to performance criteria Novation Contract Appoint consultant to produce design for tender Awarded contractor to employ the consultant Adv : retain control of design to ensure needs being met

8 ArchSD ARCHITECTURAL SERVICES DEPARTMENT Case Study Environmental Management Sheung Shui Slaughter House Construction Stage Contractor to implement mitigation measures as recommended in the EIA report Operation Stage Operator to implement ISO to ensure satisfactory environmental performance during operation

9 ArchSD ARCHITECTURAL SERVICES DEPARTMENT Case Study Hygienic Slaughter Lines Sheung Shui Slaughter House Designed to highest international standards of hygiene, e.g. EC (European Community) & USDA (U.S. Department of Agriculture) standards Fully automatic mechanized devices throughout the process

10 ArchSD ARCHITECTURAL SERVICES DEPARTMENT Case Study Solar Hot Water System Sheung Shui Slaughter House Consumption of hot water 630m 3 per day Provision of 450 solar panels to pre-heat water

11 ArchSD ARCHITECTURAL SERVICES DEPARTMENT Case Study Heat Pump for Energy Efficiency Sheung Shui Slaughter House Utilize rejected heat from air-cooling operation to further heat up water

12 ArchSD ARCHITECTURAL SERVICES DEPARTMENT Case Study Waste Water Treatment Sheung Shui Slaughter House 5000 m 3 waste water / day Concentration 10 times higher than domestic waste water Pre-treat waste water using bacteria and other micro-organisms to achieve domestic effluent standard before passing to Shek Wu Hui Sewage Treatment Plant

13 ArchSD ARCHITECTURAL SERVICES DEPARTMENT Case Study Use of Grey Water Sheung Shui Slaughter House Effluent water from Shek Wu Hui Sewage Treatment Plant for cooling the condenser of the A/C plant Sheung Wu Hui Sewage Treatment Plant Sheung Shui Slaughter House

14 ArchSD ARCHITECTURAL SERVICES DEPARTMENT Case Study Odour Control Sheung Shui Slaughter House Odour generated = 1,000 OU vs. Acceptance standard = 5 OU Chemical scrubbers & odour neutralizing agent system for odour control 5 OU is achieved at sensitive receivers

15 ArchSD ARCHITECTURAL SERVICES DEPARTMENT Case Study Noise Mitigation Sheung Shui Slaughter House Operation hours from midnight to early morning Acoustic louvres installed at lairage block Perimeter noise barrier walls along railway off-loading areas


Download ppt "ArchSD ARCHITECTURAL SERVICES DEPARTMENT Case Study Project Data Sheung Shui Slaughter House Project Cost $1.8 Billion Total GFA58,000m 2 Project Inceptionmid."