Www.company.com AE 221 Bio-behavioral Health Building Group members: Alec Canter Matt Gillis Mike Hardesty Jason Ellis Kevin Kelly Ben Mank Kevin Barth.

Similar presentations


Presentation on theme: "Www.company.com AE 221 Bio-behavioral Health Building Group members: Alec Canter Matt Gillis Mike Hardesty Jason Ellis Kevin Kelly Ben Mank Kevin Barth."— Presentation transcript:

1 www.company.com AE 221 Bio-behavioral Health Building Group members: Alec Canter Matt Gillis Mike Hardesty Jason Ellis Kevin Kelly Ben Mank Kevin Barth

2 www.company.com Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Usage Materials Building Sections Floor Plans Doors and Windows Animation

3 www.company.com Introduction The Biobehavioral Health Building 94,000 square feet to replace bridge Massaro CM Services Primarily Biobehavioral Helath, but includes Gerontology Center, the Center for Diverse Families and Communities, the Prevention Research Center for the Promotion of Human Development, and Information Systems and Services New Plaza adjacent to Hub Lawn Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

4 www.company.com Introduction The Biobehavioral Health Building The Foundation was poured Feb – May 2011 Steel was raised May – July 2011 Exterior completed by Feb 2012 Interior will be completed May 2012 Move-in November 2012 Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

5 www.company.com Structural Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

6 www.company.com Structural Foundation Foundation Consists of Slab on Grade Cast in Place Columns w/ Pads Support Steal Column Lowest Column at -21 below grade Cast in place Concrete Walls w/ Strip Footers The Reinforcing Steel WWF included in slab on grade Deformed Bars and Welded Reinforcing Bars – Grade 60 Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

7 www.company.com Structural Foundation The Concrete Type – 28 days compressive strength Footings – 4000 psi Slabs and Beams – 4000 psi ¾ Chamfer of Exposed Corners Slab on Grade WWF Control Joints with max. of 900 S.F. Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

8 www.company.com Columns & Beams Columns attached to footing or base pads Pads sit on 2 grout held in place by anchor bolts Beams are connected with both sheer and moment connections Decking Stud Framing All floors are supported by metal decking Walls have metal studs Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

9 www.company.com Site Location Layout Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

10 www.company.com Materials Façade Limestone Brick Glass Curtain Wall Roof Slate Roof Green Roof East North Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

11 www.company.com Building Sections East view of building Shows flights of stairs Conference rooms and department head offices Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

12 www.company.com Building Section South view of building Project offices Faculty rooms Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

13 www.company.com Lecture Hall located in Northeast corner of building Mechanical Room and High Density Storage Rooms Technicians and Managers Offices Ground Floor Plan Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

14 www.company.com Follows basic layout of ground floor plan Includes two classrooms in the middle of plan Project and Faculty offices 4 staircases Graduate Student Area 1 st Floor Plan Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

15 www.company.com 2 nd Floor Plan Receptionist and Visitor Area Faculty Offices with research space Interview rooms Lobby area Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

16 www.company.com 3 rd Floor Plan Directors Administrative Office Large Project Area rooms 3 stairwells Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

17 www.company.com 4 th Floor Plan Smaller in size Research offices Large Conference room Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

18 www.company.com 5 th Floor Plan Last floor Mechanical/Electrical room Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

19 www.company.com Rooms Types of rooms: Classroom Lecture Hall Laboratory Offices Conference Rooms Mechanical Rooms Corridors Storage Bathrooms Lecture Hall Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

20 www.company.com Materials Walls: Drywall Limestone Concrete Metal Paneling Ceiling: Acoustical ceiling tile Dry wall Floors: Carpet tile Linoleum Tile Concrete Brick Stainless steel paneling Wood paneling Metal paneling Granite Stone Tile Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

21 www.company.com Doors Styles All Glass Louvered Flush Full Glass [Solid Core] Full Glass [Rated System] Full Glass [Narrow Style] Full Glass [Historic Glass Panel] Materials Wood Aluminum Steel Glass Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

22 www.company.com Windows Types 11 different styles Materials Aluminum Windows Subsills Trim Manufacturers Custom Window Company EFCO Corporation Kawneer North America Wausau Window and Wall Systems Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

23 www.company.com Fire Resistive Joint Systems Device that provides a continuous transition in openings between fire resistive structures Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

24 www.company.com Fire Resistive Joint Systems Expansion joints/Control Joints- between floor structures Floor-to-wall joints- where a floor structure intersects a wall structure Head-of-wall joints- where a wall or partition intersects a roof or floor-ceiling assembly Control joints -within or between wall structures Types and Locations Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation 2 nd floor wall

25 www.company.com Fire Resistive Joint Systems Size, Color, Quantity Color- True white, limestone, sandstone Size- Joints are typically in the range of ½ to 6 inches wide depending on size of wall Used in all fire-rated walls, ceilings, and floors Sandstone Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

26 www.company.com Fire Resistive Joint System Install forming materials and other accessories Install fill materials Seal all joint openings Installation Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

27 www.company.com Fire Resistive Joint System Owner shall engage a qualified independent inspection agency to inspect the system Keep areas of work accessible during inspection by authorities having jurisdiction Repair all deficiencies when found Inspection Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

28 www.company.com Materials Cast-in-place fire stop devices Latex Sealants Intumescent Composite Sheets Intumescent Putties Wrap Strips Mortars Pillows/ Bags Silicone Foams Fire Resistive Joint Systems Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

29 www.company.com Fire Resistive Joint System Manufacturer and Cost Cost(per joint): Construction joint floor slab at exterior wall Material Labor Total 2 wide joint $6.45 $2.66 $9.11 4 wide joint $12.90 $4.43 $17.33 Manufacturer: Specified Technologies Inc. Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

30 www.company.com HVAC Insulation Types and Locations Size Color Quantity Installation Cost of Material/ Labor Warranty Manufacturers Inspection 23 07 13 Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

31 www.company.com Types and Locations Size Color Quantity Installation Cost of Material/ Labor Warranty Manufacturers Inspection 800 series spin glass (ideal for commercial buildings) Ducts located between floor and ceiling of each floor HVAC equipment located on basement and 5 th floor HVAC Insulation Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

32 www.company.com Types and Locations Size Color Quantity Installation Cost of Material/ Labor Warranty Manufacturers Inspection Size, Color, Quantity 2 thick Foil finish Covers all ducts except; Exhaust ducts Factory insulated flex ducts plenums and casings and access panels and doors Flexible connectors Vibration control devices Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

33 www.company.com Installation HVAC Insulation Types and Locations Size Color Quantity Installation Cost of Material/ Labor Warranty Manufacturers Inspection Installed after complete HVAC is tested Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

34 www.company.com Cost of Material/ Labor HVAC Insulation Types and Locations Size Color Quantity Installation Cost of Material/ Labor Warranty Manufacturers Inspection 800 series spin-glass duct insulation Material Labor Total 2 thickness 1.5 lb./cu. density$0.33/S.F. $0.71/S.F. $1.26/S.F. Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

35 www.company.com Warranty, Manufacturers, Inspection HVAC Insulation Types and Locations Size Color Quantity Installation Cost of Material/ Labor Warranty Manufacturers Inspection Johns Manville(Insulation, Roofing Systems, and Engineered Products) 1 year warranty Ductwork randomly inspected Limited to 1 location/duct system Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

36 www.company.com Linoleum Tile Linoleum can be put in pretty much any room, except bathrooms Among one of the greenest floors (linseed oil, recycled wood flour) Very durable, scratch resistant, stain resistant Linoleum Tile is located in 21 rooms of the Bio-behavioral Health Building These include Corridors, Research Offices, Storage Rooms Why appropriate Location Size Color Samples Manufacturers Quantity Cost of Material/ Labor Tools Storage Installation Warranty Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

37 www.company.com Why appropriate Location Size Color Samples Manufacturers Quantity Cost of Material/ Labor Tools Storage Installation Warranty Linoleum Tile The flooring sheets come in rolls 12 long The color of the Tiles must be constant though the whole tile the same batch of dye must be used Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

38 www.company.com Why appropriate Location Size Color Samples Manufacturers Quantity Cost of Material/ Labor Tools Storage Installation Warranty Linoleum Tile Samples of Marmoleum Tile by Forbo Industry Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

39 www.company.com Why appropriate Location Size Color Samples Manufacturers Quantity Cost of Material/ Labor Tools Storage Installation Warranty Linoleum Tile Linoleum From Armstrong, Forbo Industries or Equal This Project will require around 4000 sqft The cost of linoleum is $4.28/sqft ($17120) The cost of labor is $0.91/sqft ($3630) The labor for this project has to have had a minimum of 5 installations in the last five years Each Room should take a couple hours to finish installing, but it will take 24 hours to dry Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

40 www.company.com Why appropriate Location Size Color Samples Manufacturers Quantity Cost of Material/ Labor Tools Storage Installation Warranty Linoleum Tile Square, chalk line, pen adhesive, tape, measuring tape, notched trowel, snips, utility knife, primer and adhesives The linoleum tiles will be delivered in marked packages and stored in rooms that are not less than 70 Degrees Fahrenheit. Dry Flat Surfaces Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

41 www.company.com Why appropriate Location Size Color Samples Manufacturers Quantity Cost of Material/ Labor Tools Storage Installation Warranty Linoleum Tile The floor must be dry, level, and clean Doors must be off and molding base bored Place Moisture Barrier Measure room and cut linoleum to fit with 3 extra Place floor in and trim excess Lift half the floor and place in adhesive with notched trowel Place adhesive on other half of floor Roll floor to smooth out adhesive Stay off for 24 hours Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

42 www.company.com Why appropriate Location Size Color Samples Manufacturers Quantity Cost of Material/ Labor Tools Storage Installation Warranty Linoleum Tile The Manufacturer and the Laborer will provide a 15 year warranty to cover the material and installation Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

43 www.company.com Why appropriate Location Size Color Samples Manufacturers Quantity Cost of Material/ Labor Tools Storage Installation Warranty Linoleum Tile 226 Research/ Budget Storage Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

44 www.company.com Metal stairs are appropriate for many type of buildings Durable Can carry normal loads of 100 lbs per sq. ft. Capable of carrying concentrated loads of 300 lbs on an area of 4 sq. in. Metal Stairs Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

45 www.company.com Location: By main entrance By the south end of the building By the east end of the building Size: Tread: typical 11 in. wide, 3/16 in. thick Riser: typical 7 in. tall, 1/8 in. thick Width and length vary depending on location, use, and load capability Metal Stairs Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

46 www.company.com Stairs: 23 flights of stairs throughout the building Color: Gray, silver, and metallic Due to the use of different types of metal Ferrous Metals: Steel, Cast Iron Non Ferrous Metals: Aluminum Metal Stairs Main Stairwell Manufacturer: Lapeyre Stair Inc. Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

47 www.company.com Zinc plated fasteners Bolts and nuts Anchor bolts Machine screws Plain washers Lock washers Welding rods Accessories for Installation Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation Steel-Cutting Saw Welding Tools

48 www.company.com 1)Install stair assembly in accordance with manufacturers instructions and approved shop drawings 2)Anchor components rigidly and securely to building structure 3)Make sure its plumb and level, accurately fitted, and free from distortions or defects 4)Clean bolted connections and touch up with shop primer 5)Repair galvanizing with galvanizing repair paint Metal Stair Installation Treads and risers 1)Perform cutting, drilling and fitting required 2)Set units accurately and aligned in location established by lines and levels 3)Treads and risers attached by welding steal angles 4)Field weld and smooth the surface to blend it with all other surfaces Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

49 www.company.com Cost for materials Cost for installation Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

50 www.company.com Warranty Lapeyre Stair warrants to the original purchaser that the products are free from defects in workmanship and materials for a period of one year from date of receipt by purchaser. Lapeyre Stair will repair or replace, at its sole option, any products of faulty material or defective workmanship under normal use or service. Purchaser shall not return any defective products without Lepeyre Stairs prior to written approval. Stairwell A Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

51 www.company.com Tolerances 1.Max variation from plumb: ¼ in. for full height of stairs 2.Max variation from level: 1/8 in. 3.Max angular variation of tread from true position: 3 degrees 4.Comply with NAAMM metal stairs manual Inspection 1.Verify that field measurements are acceptable to suit stair assembly tolerances 2.Verify supports and anchors are correctly and securely positioned 3.Verify installation conditions are acceptable for product installation in accordance with manufactures instructions Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

52 www.company.com Interior Flush Wood Veneer Doors These are basic interior, smooth wood panel doors made of fire rated material ranging from 20 to 90 minute fire ratings. They are used throughout the Biobehavioral Health Building for classrooms and office doors on each floor. Project Office Room #202 Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

53 www.company.com Location: Every floor Size: Focused on the 3 x 7 2 ½ Wood Flush Door with a thickness of 1 ¾ Color: Wood finish, but can be stained a variety of ways depending on the designers requests. Quantity: 162 Price: $95.50 for material, $43.00 for labor Total Cost with O&P is $171.00 Interior Flush Wood Veneer Doors Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

54 www.company.com Interior Flush Wood Veneer Doors Manfacturer: VT Industries, Inc. Warranty: Warrant solid core, interior doors for life of installation against warpage, delamination, and defects in materials and workmanship. Defects noted during warranty period shall be corrected at no cost to Owner. Corrective work shall include labor and material for repair, replacement, refinishing, and rehanging as required. Inspection/approval/tolerance – Approval may come from Architect if needed Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

55 www.company.com Interior Flush Wood Veneer Doors Installation Process Ensure frames are plumb, level, square, and within tolerance. Allow doors to become acclimated to building temperature and relative humidity for a minimum of 24 hours before installation. Install doors in accordance with manufacturers instructions. Install doors at locations indicated on the [Door Schedule] [Drawings]. Install doors plumb, level, and square. Install door hardware as specified in Section 08710 (08 71 00). Adjust doors to swing freely, without binding in frame. Adjust hardware to operate properly. Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

56 www.company.com Interior Flush Wood Veneer Doors Environmental requirements for storage and installation Do not subject doors to extreme conditions or changes in temperature or relative humidity in accordance with WDMA I.S.1-A Accessories Needed Frames Door Hardware Doorknobs Hinges Screws Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

57 www.company.com Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation Grouting Appropriateness Helps fill the voids Effectively transfers load Helps prevent rust staining of the column Location For use under steel column base plates, steel joists, and beam bearing plates

58 www.company.com Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation Grouting Size 1 or 2 inches in height for Non-metallic, No Slip Grout Color Grey Tools

59 www.company.com Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation Grouting Manufacturers Master Builders Masterflow 928 L&M Chemicals Crystex Euclid Chemical Company NS Grout U.S. Mix Products Co. MP Grout Or approved equal Quantity Grouting is used wherever steel columns, steel joists, and beams meet the structural concrete

60 www.company.com Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation Grouting Cost of Material Basis of Measurement: By cubic yard (cubic meter) Dry packs come in 50lb. Bags 64 per pallet Cost of Labor Basis of Payment: This payment includes full compensation for all labor, materials, tools, equipment and other items as necessary to complete the work as described in the contract documents. 2011 Bare Costs 03 62 13 Non-Metallic Non-Shrink GroutingMaterialLaborTotal Total with O&P 1" deep7.39.3516.6521.5 2" deep14.6513.0527.735

61 www.company.com Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation Grouting Warranty The companies warrant that the materials will be of good quality. Will conform with the published specifications in force on the date of acceptance of the order. Inspection Grout is place only after inspectors have verified proportions of site-prepared grout. Storage Materials must be delivered in original, unopened containers with the manufacturers labels including product name and batch numbers Do not apply material when temperature is below 45 o F or when temperature is expected to fall below 45 o F within 48 hours Protect from freezing and store above ground in a cool, dry place

62 www.company.com Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation Grouting Installation First you want to remove all grease, oil, dirt laitance, and unsound concrete. Then saturate the area that will receive the grout with water. You want to make sure you remove any puddles of water before placing the grout. You also want to maintain a temperature between 45 o F and 90 o F prior to application and throughout the initial 24 hours. Finally mix, install, and cure the grout according to the manufactures specifications. Completely fill the grout under the beam and column bearings, erection blockouts, connections blockouts or pockets, and elsewhere are required.

63 www.company.com Ornamental Railings Why appropriate Location Size Color Samples Materials Manufacturers Quantity Cost of Material/ Labor Materials Installation Warranty Ornamental railings accompany nearly every stair Guards, handrails, protect occupants at open-sided floor areas Guidance and support High quality, nonferrous metals such as stainless steel, brass, and aluminum are options. Located in the stairwells Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

64 www.company.com Ornamental Railings Why appropriate Location Size Color Samples Materials Manufacturers Quantity Cost of Material/ Labor Materials Installation Warranty Size and Colors The railings come in 1.9 and 2.5 inch diameters with the glass being at least.5 inches thick Stainless steel is used throughout the building Samples of ornamental railings from Couturier Iron Craft Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

65 www.company.com Ornamental Railings Why appropriate Location Size Color Samples Materials Manufacturers Quantity Cost of Material/ Labor Installation Warranty Materials Stainless Steel Performance requirement of 60 % of minimum strength Tubing, pipe, castings, plates, and flat bars Glass Tempered Glass Clear.5 inches thick Curtain glass side Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

66 www.company.com Ornamental Railings Why appropriate Location Size Color Samples Materials Manufacturers Quantity Cost of Material/ Labor Installation Warranty Ornamental Railings from Couturier Iron Craft This Project will require over 520 feet of railing Cost according to RS Means 2011 Edition for a composite steel and glass @ 36 high, posts @ 6 Off Center is MaterialLaborTotal Min10243145 Max20464.5268.5 Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

67 www.company.com Ornamental Railings Why appropriate Location Size Color Samples Materials Manufacturers Quantity Cost of Material/ Labor Installation Warranty Fit exposed connections together to form hairline joints. Install ornamental railings plumb and level. Locate railings as indicated on Drawings and at heights that are in accordance with applicable code. Set to right height Anchor to substrates in strict accordance with tested anchorage system, free from distortion or defects detrimental to appearance or performance. Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

68 www.company.com Ornamental Railings Why appropriate Location Size Color Samples Materials Manufacturers Quantity Cost of Material/ Labor Installation Warranty The Manufacturer and the Laborer will provide a 10 year warranty to cover the material and installation of railing Laminated Glass has a warranty period of five years from date of substantial completion Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

69 www.company.com Ornamental Railings Why appropriate Location Size Color Samples Materials Manufacturers Quantity Cost of Material/ Labor Installation Warranty 2 nd Floor Stairs Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

70 www.company.com Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

71 www.company.com

72

73

74

75

76

77

78