Presentation is loading. Please wait.

Presentation is loading. Please wait.

GISFI_CSeON_201209309GISFI#10, Sep 10-12 20121 CSeON WG (GISFI#10) Agenda GISFI # 10, Sep 10-12, 2012, Delhi Chair: Parag Pruthi, NIKSUN Chair-Delegate:

Similar presentations


Presentation on theme: "GISFI_CSeON_201209309GISFI#10, Sep 10-12 20121 CSeON WG (GISFI#10) Agenda GISFI # 10, Sep 10-12, 2012, Delhi Chair: Parag Pruthi, NIKSUN Chair-Delegate:"— Presentation transcript:

1 GISFI_CSeON_201209309GISFI#10, Sep 10-12 20121 CSeON WG (GISFI#10) Agenda GISFI # 10, Sep 10-12, 2012, Delhi Chair: Parag Pruthi, NIKSUN Chair-Delegate: Ashutosh Dutta, NIKSUN Vice-Chair: Niranth, Huawei

2 Agenda Sharing of CSeON WG GISFI #9 Report Status of CSeON WG Deliverables Contributions for CSeON WG GISFI #10

3 GISFI #9 Report Topics discussed during GISFI #9 –Deliverables CSeON Framework and requirements to incorporate NTP 2012 objectives, operator views, use cases like VoLTE, merge other analysis and include cloud computing perspective from NPIT 2011 VoLTE Framework was discussed to be included into the CSeON requirements as use case. Telecom Billing and Revenue Mgmt was discussed and decided to be presented again in GISFI #10 by the author. –Liaisons Liaison reports were presented and it was decided to send all liaisons before GISFI#10. –Joint Workshop with Operators proposal was discussed. Next Steps –Document Status CSeON Requirements and Framework TR (Progress) Information Management TR (Progress) Cloud Computing TR (Progress) Business Models (To close) –MOU/LS to IEEE P1903, IETF, ITU-T, and ATIS SON/Cloud Computing Forum

4 SeON WG Deliverables - Status 6 Task Forces –2 (Closed) –3 (In Progress) –1 (Moved to Security and Privacy WG) GISFI #10 –TRs –Liaison progress –Information Systems migration challenges –Cloud networks discussions.

5 Task 1: CSeON Framework Rapporteur: NIKSUN Contributors: Huawei, VNL, TCS Type: Technical Report (TR) Deliverable No.: TBD Status: In Progress (95% complete) –Incorporate NTP 2012 objectives, operator views, use cases like VoLTE, merge other analysis, clean up the requirements, include cloud computing perspective from NPIT 2011 –Need more contributions from Operators, Vendors and Integrators. –GISFI #10 New version to be presented.

6 Task 2: Business Models and Architecture Rapporteur: NEC, Contributors: VNL, TCS, NIKSUN, MPHASIS Type: Technical Report (TR) Deliverable No.: TBD [GISFI_SeON_20110675] Status: Completed. –Definition of the business models. –Mapping of service oriented architecture with the business models. –In particular, the team will define a few use case scenarios where both a third party service provider and existing service provider can make use of the standards developed by GISFI to create service creation environment for the end users. –Deliverable format could be a word document or a set of annotated view graphs.

7 Task 3: Gap analysis with other SDO Rapporteur: NIKSUN Contributor: Ericsson, Huawei Type: Technical Report (TR) Deliverable No.: TBD Status: COMPLETED –Conduct a gap analysis with other SDOs (e.g., ATIS SON, NGSON, 3GPP, OMA, IETF). –In particular, the report will include thorough analysis of ATIS SON’s WG documents and provide recommendations as to which specific work items can be carried out within GISFI and the work items that can complement the work items within SON. –Similar analysis to be conducted on IEEE-P1903 Std. (IEEE NGSON) –Gap analysis at Network infrastructural level. –GISFI #9 Merging Gap Analysis with SeON Framework

8 Task 4: Security Models Rapporteur: TCS Contributors: NEC, VNL, NIKSUN, Huawei Type: Technical Report (TR) Deliverable No.: TBD Status: Closed in SeON WG (MOVED TO “SECURITY AND PRIVACY WG”) –Define the security models and produce threat analysis document. –In particular, the security task group will look at the following Ongoing security work within 3GPP (e.g., security and identity aspect as single-sign-on) and will conduct a study on how security, identity and location thing will work together. – Security for Cloud Computing –The task group will clarify requirements for rural India

9 Task 5: Information Management Rapporteur: MPHASIS Contributor: NIKSUN Type: Technical Report (TR) Status: In Progress –Information migration is beginning to play an important role as there is a gradual shift towards convergence of IT and Telco taking place. –Information migration from Legacy to Next generation systems (3G, 4G) based on context of data using rule models. TMF’s SID model is considered as the foundation upon which best practices and end state of information model will be drawn. –The deliverable format could be a word document and set of annotated view graphs. –GISFI #10 Information Systems migration challenges

10 Task 6: Cloud Computing Framework Rapporteur: TBD Contributor: Huawei, NEC, TCS, NIKSUN Type: Technical Report (TR) Status: In Progress –GISFI #10 Huawei: Private Data Cloud for CSeON TCS: QoS for Cloud

11 GISFI #10 Contributions CSeON Requirements and Framework Document – Niranth, Huawei Private Data Cloud for CSeON – Niranth, Huawei CSeON Business Models – Anand, NEC Liaisons Report –IEEE NGSON LS Response – Ashutosh, NIKSUN Information Systems Migration Challenges – Basavaraj, GG Sub 1 GHz RF Solutions for India – Viral Gosalia, Freescale

12 Thank You!


Download ppt "GISFI_CSeON_201209309GISFI#10, Sep 10-12 20121 CSeON WG (GISFI#10) Agenda GISFI # 10, Sep 10-12, 2012, Delhi Chair: Parag Pruthi, NIKSUN Chair-Delegate:"

Similar presentations


Ads by Google