Presentation is loading. Please wait.

Presentation is loading. Please wait.

GISFI_SeON_201206274GISFI#09, Jun 18-20 20121 SeON WG (GISFI #9) Agenda GISFI # 09, Jun 18-20, 2012, Mumbai Chair: Parag Pruthi, NIKSUN Chair-Delegate:

Similar presentations


Presentation on theme: "GISFI_SeON_201206274GISFI#09, Jun 18-20 20121 SeON WG (GISFI #9) Agenda GISFI # 09, Jun 18-20, 2012, Mumbai Chair: Parag Pruthi, NIKSUN Chair-Delegate:"— Presentation transcript:

1 GISFI_SeON_201206274GISFI#09, Jun 18-20 20121 SeON WG (GISFI #9) Agenda GISFI # 09, Jun 18-20, 2012, Mumbai Chair: Parag Pruthi, NIKSUN Chair-Delegate: Ashutosh Dutta, NIKSUN Vice-Chair: Debabrata Nayak, Huawei Niranth, Huawei

2 Agenda Sharing of SeON WG GISFI #8 Report Status of SeON WG Deliverables Contributions for SeON WG GISFI #9

3 GISFI #8 Report Topics discussed during GISFI #8 –Deliverables SeON Business Models TR to be editorially reworked and published by 15 th Apr’12 SeON Framework, Gap Analysis and Architecture TR to be reviewed, reworked and published by 24 th Apr’12 –Liaisons GISFI brochure to be made available - LS to be sent to IEEE P1903, IETF Cloud Computing Group, ATIS SON/Cloud Services Forum and TEC by 27 th Apr’12 Next Steps –Document Status SeON Framework TR Information Management TR Cloud Computing TR –MOU/LS to IEEE P1903, IETF, ITU-T, and ATIS SON/Cloud Computing Forum

4 SeON WG Deliverables - Status 6 Task Forces –1 (Closed) –4 (In Progress) –1 (Moved to Security and Privacy WG) GISFI #9 –TRs status –Liaison steps –Telecom Billing and Revenue Mgmt. –Workshop with Indian stakeholders –Cloud computing discussions.

5 Task 1: SeON Framework document Rapporteur: NIKSUN Contributors: VNL, TCS, Huawei Type: Technical Report (TR) Deliverable No.: TBD Status: In Progress (95% complete) –Modify the existing frame work document from the perspective of Collaboration with the activities of other related WGs such as OMA, ATIS SON, IEEE NGSON and IETF. –Word format of the document to be uploaded by Ashutosh by mid of Jan’12 for further contributions. –GISFI #9 Merging the gap analysis with SeON Framework Making the document available for review (Formal)

6 Task 2: Business Models and Architecture Rapporteur: NEC, Contributors: VNL, TCS, NIKSUN, MPHASIS Type: Technical Report (TR) Deliverable No.: TBD [GISFI_SeON_20110675] Status: Completed. –Definition of the business models. –Mapping of service oriented architecture with the business models. –In particular, the team will define a few use case scenarios where both a third party service provider and existing service provider can make use of the standards developed by GISFI to create service creation environment for the end users. –Deliverable format could be a word document or a set of annotated view graphs.

7 Task 3: Gap analysis with other SDO Rapporteur: NIKSUN Contributor: Ericsson, Huawei Type: Technical Report (TR) Deliverable No.: TBD Status: COMPLETED –Conduct a gap analysis with other SDOs (e.g., ATIS SON, NGSON, 3GPP, OMA, IETF). –In particular, the report will include thorough analysis of ATIS SON’s WG documents and provide recommendations as to which specific work items can be carried out within GISFI and the work items that can complement the work items within SON. –Similar analysis to be conducted on IEEE-P1903 Std. (IEEE NGSON) –Gap analysis at Network infrastructural level. –GISFI #9 Merging Gap Analysis with SeON Framework

8 Task 4: Security Models Rapporteur: TCS Contributors: NEC, VNL, NIKSUN, Huawei Type: Technical Report (TR) Deliverable No.: TBD Status: Closed in SeON WG (MOVED TO “SECURITY AND PRIVACY WG”) –Define the security models and produce threat analysis document. –In particular, the security task group will look at the following Ongoing security work within 3GPP (e.g., security and identity aspect as single-sign-on) and will conduct a study on how security, identity and location thing will work together. – Security for Cloud Computing –The task group will clarify requirements for rural India

9 Task 5: Information Management Rapporteur: MPHASIS Contributor: NIKSUN Type: Technical Report (TR) Status: In Progress –Information migration is beginning to play an important role as there is a gradual shift towards convergence of IT and Telco taking place. –Information migration from Legacy to Next generation systems (3G, 4G) based on context of data using rule models. TMF’s SID model is considered as the foundation upon which best practices and end state of information model will be drawn. –The deliverable format could be a word document and set of annotated view graphs. –GISFI #9 Telecom Billing and Revenue Mgmt presentation by Basavaraj.

10 Task 6: Cloud Computing Framework Rapporteur: TBD Contributor: Huawei, NEC, TCS, NIKSUN Type: Technical Report (TR) Status: In Progress –GISFI #9 Scope: Cloud computing issues globally and particularly in Indian context. Aim: Technical Gaps in Cloud computing. Partners: Operators, IT Service Providers, IT Vendors, ICT Vendors, Integrators, Academia? TCS - QoS for Cloud

11 GISFI #9 Contributions SeON Framework Document Discussion - Ashutosh Liaisons Report (Informal) –LS to IEEE P1903 – Niranth, Huawei on behalf of Chair, SeON WG –LS to ATIS SON/Cloud – Ashutosh, NIKSUN Telecom Billing and Revenue Mgmt – Basavaraj Hooli (Ashutosh to present) VoLTE Framework Workshop Proposal – Ashutosh (NIKSUN), Niranth (Huawei)

12 Thank You!


Download ppt "GISFI_SeON_201206274GISFI#09, Jun 18-20 20121 SeON WG (GISFI #9) Agenda GISFI # 09, Jun 18-20, 2012, Mumbai Chair: Parag Pruthi, NIKSUN Chair-Delegate:"

Similar presentations


Ads by Google