DARREN'S PROJECT PRESENTATION 8051 Controlled Speedo For a Trolley On An Inclined Ramp
2
Background: Technology Being Replaced Outgoing technology includes: Bulky DC Power Supply Optical Sensor Portable Digital Scope Pen, Paper & Calculator
3
Background: Spec provided. Design Spec. provided by ANECTO Ltd. Simple device set-up User friendly display module Idiot-proof operation Easily verified output (by operator if possible) Clear & concise documentation
4
Operator Time Optimization Replacement device will eliminate slow & unreliable operator calculations Faster test set-up Errors will be avoided Reduced cost to the paying customer
5
Main Technologies Employed 8051 Microcontroller SX-461 Opto-switch LCD Display Capable of independent operation System to be expanded to relay it’s readings to PC Serial or USB? Reliability Issues? Connectivity?
6
8051 Development Board 62 Kbytes On-Chip Flash/EE Program Memory Sufficient for reasonably large source code Built in Interrupt based timer Can be configured for 16-bit operation On-board Serial communications
7
PC Based User Interface System to receive data from core test unit Data from various tests to be stored & easily accessed Statistical analysis to be carried out on acquired data PC Interface to transmit calibration data back to the core test unit
8
Research & Implementation Goals Re-acquaint myself with the 8051 Implement & test all basic functions required Much of the code design is completed Construct a standalone, fully enclosed unit ready for initial use & testing (ASAP) Testing of Serial/USB functionality thereafter Finally, a PC based application will be constructed
9
Goals (Monthly) November Installation of the basic unit for parallel operation with existing system December Functional system in place & verified January PC based application to be complete & in testing Febuary System complete & write-up underway
10
Review Schedule Reviews may be at any point you wish Weekly e-mail will detail progress Full review after each major milestone
11
Contingency for Change of Plan There will be several months available for tidying up the code & hardware towards the end of the project If a deadline is overshot the time will have to be made up ahead of the next one
12
Initial Strategy 1. Construction of the Development System as a test- bench unit 8051 Dev. Board & PSU LCD & PSU Optical sensor & PSU 2. Installation & test of a rudimentary unit Integrated system with only one PSU for the core unit 3. Further development to follow
13
Closing Slide Any Questions?