1 World Meteorological Organization WMO Information System (WIS) Managing & Moving Weather, Water and Climate Information in the 21 st Century WORLD METEOROLOGICAL.

Slides:



Advertisements
Similar presentations
22-23 April 2004, the Fourth GEO Plenary Meeting at Tokyo, Japan Overview of Draft Outline, Process, and Schedule of the Implementation Plan Ivan B. DeLoatch,
Advertisements

WIS DATA-COMMUNICATIONS FUNCTIONS AND SERVICES WIS shall provide various types of services (with different quality of service) to meet the different requirements.
1 World Meteorological Organization WMO Information System (WIS) Managing & Moving Weather, Water and Climate Information in the 21 st Century WORLD METEOROLOGICAL.
World Meteorological Organization Working together in weather, climate and water WMO Information System (WIS) Meeting of the ET-WISC Feb 2010 David.
Status report on the implementation of GISC at CMA Li Xiang NMIC, CMA
World Meteorological Organization Working together in weather, climate and water Working Together at Regional Level for a better future W. Zhang, D/OBS;
WORLD METEOROLOGICAL ORGANIZATION Weather - Climate - Water
World Meteorological Organization Working together in weather, climate and water ET-WISC INTERFACES WMO; OBS/WISwww.wmo.int WMO.
WMO WMO Integrated Global Observing System (WIGOS) CBS EXPERT TEAM ON AIRCRAFT-BASED OBSERVING SYSTEMS 1st Session (Geneva, September, 2013) Dr I.
Understanding and Implementing WMO INFORMATION SYSTEM
1 World Meteorological Organization Report to WG-PIW RA VI September 2008 Presented by David Thomas (PM-WIS) WORLD METEOROLOGICAL ORGANIZATION Weather.
World Meteorological Organization Working together in weather, climate and water World Weather Watch (WWW) Programme Doc.3.1 WMO/OBSwww.wmo.int WMO Wenjian.
World Meteorological Organization Working together in weather, climate and water RA VI Workshop on the Implementation of WIS Sofia, Bulgaria, 1 – 3 November.
Managing & Moving Weather, Water and Climate Information in the 21 st Century WMO Information System (WIS) 4 th WCRP Observations and Assimilation Panel.
Project Planning Dr. Jane Dong Electrical and Computer Engineering.
1 Project Management & Project Management Software Yale Braunstein School of Information Management & Systems UC Berkeley.
Project Management The Gantt Chart. What is a Gantt Chart? Gantt charts are a type of bar chart used to monitor the progress of a project. Each element.
World Meteorological Organization Working together in weather, climate and water WIGOS R-WIP-RA III José Arimatéa de Sousa Brito, RA-III Focal Point WMO.
1 WMO Information System (WIS) and the Next Generation of Worldwide Weather Data Exchange by: Robert Bunge (August 2013)
Activities of the RA V WG-INFR Ms Agnes Lane Bureau of Meteorology.
World Meteorological Organization Working together in weather, climate and water WIGOS IMPLEMENTATION IN RA III José Arimatéa de Sousa Brito, Focal Point.
Guidelines for RTF Measure Economics Estimation Methods (formerly Cost and Non-Energy Benefits Guidelines) Progress Update to the Regional Technical Forum.
WMO WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS) Cg-17, Agenda Dr S. Barrell, Chair, ICG-WIGOS WMO; OBS.
BSBPMG503A Manage Project Time Manage Project Time Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
Query Health Concept-to-Codes (C2C) SWG Meeting #8 January 31,
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Unit Guide C ertificate IV in Project Management Qualification Code.
World Meteorological Organization Working together in weather, climate and water WIGOS Implementation in Region VI WMO Dieter Schröder Chair WG-TDI Deutscher.
Project UF Practical management of projects Randy Graff, PhD.
1 1 Japan Meteorological AgencyET-WISC-3, EUMETSAT Germany, Jun.2008 JMA’s Status Report related to WIS Toshikazu NISHIO JMA ET-WISC-III Jun.
1 World Meteorological Organization AR report to ADC May 2008 Presented by David Thomas (WMO) WORLD METEOROLOGICAL ORGANIZATION Weather – Climate.
1 World Meteorological Organization AR report to ADC September 2008 Presented by Don Middleton (NCAR), on behalf of WIS and Dave Thomas, Jean-Michel.
Project UF Practical management of projects Randy Graff, PhD.
The WMO Information System (WIS)
1 Group on Earth Observations WORLD METEOROLOGICAL ORGANIZATION Weather – Climate - Water Dr Donald Hinsman, WMO Secretariat Focal Point for GEO.
WP2-MESMA Framework. WP2 Aim and deliverables Aim: “Development of a generic and operational framework for the monitoring and evaluation of SMAs” Deliverables:
AR WMO Information System (WIS) UPDATE REPORT TO ADC FEB.2008.
May 2008 ET-CTS Toulouse 1 Debriefing on WIS Aspects Discussions from the ICM IMTN Cloud 1 (Washington Nov 2007) Jean-François Gagnon Telecommunications.
Region I WIS Pilot Projects. Background Inadequate resources to meet the costs of leased dedicated links. Frequent outages of the leased dedicated links.
Office Management Tool - II Institute of Management Sciences Muhammad Shahzad Ali Lec 7: Introduction to MS - PROJECT L E C T U R E 7 INTRODUCTION TO MS.
Seite 1 Updates – TGPSH PR task team Management Team Meeting 21/06/2011 By PR task team members Regine, Barbara, Vida and Birte HEALTH and HIV/AIDS.
[PROJECT] PROJECT KICKOFF PRESENTATION MONTH DAY, YEAR.
November 25, 2015 © IBM Corporation Unified Method Framework (UMF) RMC Reference Architecture Overview Kelli Houston
World Meteorological Organization (WMO) Observing and Information Systems Department WMO Information System (WIS) WMO Prepared by Timo Pröscholdt WIS Professional.
WMO Moving from the WIGOS Framework towards the Pre-operational Phase A. Makarau President of RA I.
WMO WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS) STATUS OF IMPLEMENTATION (Dr S. Barrell, Chair, ICG-WIGOS) WMO; OBS.
1 World Meteorological Organization WMO Information System (WIS) Managing & Moving Weather, Water and Climate Information in the 21 st Century WORLD METEOROLOGICAL.
Gold Rush SAC Meeting September 15, :00-6:00 PM Gold Mine Room.
World Meteorological Organization Working together in weather, climate and water THE GLOBAL FRAMEWORK FOR CLIMATE SERVICES (GFCS)
Program / Project Review PROGRAM/PROJECT REVIEW FORM
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO WMO World Meteorological Organization Working.
WMO RA I WIGOS Implementation Workshop, Walvis Bay, Namibia, 2-4 November 2015 WIS CENTRES SUPPORTING WIGOS Francis Mosetlho OPS-FABL-WMO RA I WIGOS_2-4.
World Meteorological Organization Working together in weather, climate and water WMO Information System (WIS) Progress Report Document 3.5 Prof G-R-Hoffmann.
World Meteorological Organization Working together in weather, climate and water RA VI Workshop on the Implementation of WIS Sofia, Bulgaria, 1 – 3 November.
1 World Meteorological Organization Report to ICT-ISS – Fourth Session November 2008 Presented by David Thomas (PM-WIS) WORLD METEOROLOGICAL ORGANIZATION.
World Meteorological Organization Working together in weather, climate and water 12th Asia - Pacific (APSDEU) 24th North American – Europe (NAEDEX) WMO;
* Project Name Progress Report 2 Date Presented by:
Brighton Product Lab Transforming lives and shaping futures Mark MilneTime and project Management.
Project Management & Project Management Software
MODULE 10 – PROJECT SERVER
AR report to ADC 14 May 2007 Presented by Hiroyuki Ichijo (JMA)
GEOSS Future Products Workshop March 26-28, 2013 NOAA
Ramsey/Washington County School Recycling Advisory Group
GUIDANCE ON PLANNING PROCESS GUIDANCE ON PLANNING PROCESS
ELC 347 Day 10.
Introduction. Presentation of the mandate of the Task Force
Toward WIS2.0 Shigeharu NISHIKAWA Japan Meteorological Agency
WIGOS Implementation in Region IV
The Survival Plan.
- Measurement of traffic volume -
SD5953 Successful Project Management FINAL PROJECT PLAN INSTRUCTIONS
Presentation transcript:

1 World Meteorological Organization WMO Information System (WIS) Managing & Moving Weather, Water and Climate Information in the 21 st Century WORLD METEOROLOGICAL ORGANIZATION Weather – Climate - Water Project & Implementation Plan ICG-WIS IV 4-7 September 2007

2 World Meteorological Organization Six Components –Introduction Vision, architecture, scope, environment, risks –Project Mgt framework, outreach, review –Components GTS, IGDDS, New –Related Projects –Implementation Plan –Ongoing support Overview

3 World Meteorological Organization Critical bits to review Scope (Table 1) Definitions of GISC, DCPC & NC (Sec3.3) Tasks, timelines, progress and sub tasks, leaders, risk & priority (Table 5.3) Ditto for pilot project and task contacts (App.A) Minimum critical success indicators (Sec5.5) Project office and ongoing support (Sec 6) Risk register (App F) Missing elements or tasks Gantt chart TOR for ETs (App C, D & E)

4 World Meteorological Organization PM Application PM using MS Project 2003 –Could task leaders create & maintain project files? –Reports could include latest copy of file. –Master file will just link to task files –Don’t need to be complex, Keys are links and timelines (i.e. Gantt Chart) Haven’t worried about resources, or actual work time Is there an easier alternative? i.e. twiki based

5 World Meteorological Organization What happens next Incorporate feedback from ICG-WIS (Sept – Oct 2007) Publish reviewed draft (Ver 0.5) on WIS web page Plan is presented to ECWG-WIGOS/WIS (Nov 2007?) Incorporate user requirements (App B) and feedback from ECWG. (Ver 0.6) Review & present to next ICG-WIS & CBS (May 2008?) (Ver 0.7 & 0.8) Remove draft label and publish as Ver. 1.0 Continue ongoing reviews