New Datum: Vertical (Geopotential) FGCS Silver Spring, MD. July 24, 2011 Mark C. Eckl NGS Chief of Observation and Analysis Division, New Vertical Datum.

Slides:



Advertisements
Similar presentations
National Ocean Service Budget Update for the NOAA Hydrographic Services Review Panel Glenn Boledovich, Chief NOS Policy, Planning and Analysis Division.
Advertisements

Assistant Administrator National Oceanic and Atmospheric Administration National Ocean Service September 18, 2008 John H. Dunnigan Toward National Height.
New Datums Are Coming in 2022!  Both a new geometric and a new geopotential (vertical) datum will be released in  The realization of the new datums.
National Height Modernization Program (NHMP) Update Great Lakes Region Height Modernization Consortium Meeting Columbus, OH October 13, 2011.
Federal Geodetic Control Subcommittee Update Federal Geographic Data Committee Coordination Group Meeting Tuesday, November 3, 2009 Juliana Blackwell Director,
NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Updating the International Great Lakes Datum Plan Overview Center for Operational Oceanographic.
Better Positions and Improved Access to the National Spatial Reference System  Multi-Year CORS Solution  National Adjustment of 2011  New NGS Datasheet.
Refinements to the North American Datum of 1983 Multi-Year CORS Solution and the National Adjustment of 2011 Dr. Neil D. Weston Chief, Spatial Reference.
Federal Geodetic Control Subcommittee Update to Coordination Group Ronnie Taylor alternate Subcommittee Chair Deputy Director, National Geodetic Survey.
VRSWG Update Renee Shields Height Modernization Manager National Geodetic Survey July 11, 2011.
DAVE REED HYDROLOGIST IN CHARGE NOAA/NWS LOWER MISSISSIPPI RIVER FORECAST CENTER Datums and Stages - Importance to the NOAA/NWS Hydrologic Services Program.
and IGLD 85 Hydraulic Correctors
Juliana Blackwell, Director National Geodetic Survey, NOAA
New Geometric Datum: plans Modernizing the U.S. National Spatial Reference System FGCS San Diego, California Monday 11 July 2011.
Using Aerogravity to Produce a Refined Vertical Datum D.R. Roman and X. Li XXV FIG Congress June 2014 Kuala Lumpur, Malaysia Session TS01A, Paper.
NGS HSRP Update Ronnie Taylor, Acting Director National Geodetic Survey, NOAA October 13, 2010.
Coordinate Systems & Vertical Datum Issues
Vicki Childers, Daniel Winester, Mark Eckl, Dru Smith, Daniel Roman
The Future of the National Geodetic Survey Dr. Dru A. Smith Chief Geodesist, NGS/NOAA CSRC, Coordinating Council Spring Meeting La Jolla, CA April 28,
National Geodetic Survey Update Providence, RI May 6, 2010 Juliana Blackwell Director, National Geodetic Survey.
GRAV-D Project Update Vicki Childers, Ph.D. GRAV-D Project Manager.
New Vertical Datum Implementation Plan FGDC Silver Spring, MD. July 30, 2013 Mark C. Eckl Chief of the Observation and Analysis Division, National Geodetic.
Who Needs New Datums? NGS Says… ftp://ftp.ngs.noaa.gov/pub/marti Marti Ikehara California Geodetic Advisor, Sacramento.
Geoid Modeling at NOAA Dru A. Smith, Ph.D. National Geodetic Survey National Ocean Service, NOAA November 13, 2000.
NOAA’s National Geodetic Survey Update Michael Dennis, RLS, PE ® Esri Survey Summit July 6-9, 2013 ● San Diego, CA.
Gravity for the Redefinition of the American Vertical: GRAV-D Anchorage, Alaska February 22, Alaska Surveying and Mapping Conference Renee.
Feedback on the New Datums 2015 Geospatial Summit April 13 to 14, 2015 Federal Emergency Management Agency Risk MAP Paul Rooney.
The National Geodetic Survey 10 Year Plan Mission, Vision and Strategy
Geoid Height Models at NGS Dan Roman Research Geodesist.
Integrated and Collaborative Organizations Create Geospatial Solutions Geospatial Solutions by DBZ Achieving Great Heights: Toward a Better Vertical Reference.
Federal Geodetic Control Subcommittee Update Federal Geographic Data Committee Coordination Group Meeting Tuesday, November 3, 2009 Juliana Blackwell Director,
National Geodetic Survey Programs & Geodetic Tools William Stone Southwest Region Geodetic Advisor NOAA’s National Geodetic Survey
Lecture 18: Vertical Datums and a little Linear Regression GISC March 2009 For Geoid96.
Socio-Economic Studies What? Why? How? April, 2014 Brett Howe NGS Geodetic Services Division Chief.
AEC Summit NOAA’s National Geodetic Survey Update Brian Shaw Geodesist.
20 FEB 2009 Salt Lake City, UTACSM-MARLS-UCLS-WFPS Conference 2009 Geoid Modeling, GRAV-D and Height Mod.
Who Needs New Datums? NGS Says… ftp://ftp.ngs.noaa.gov/pub/marti Marti Ikehara California Geodetic Advisor, Sacramento.
Terrestrial Gravity Plans at NGS Dru Smith Mark Eckl Vicki Childers Workshop on North American Gravimetry10/18/20101.
Feedback on the New Datums Reference Frames 2015 Geospatial Summit April 14, 2015 Amar Nayegandhi Dewberry Consultants LLC.
The GRAV-D Project and The Future of NAD 83 and NAVD 88 A briefing for FEMA leadership Dru Smith, Chief Geodesist NOAA’s National Geodetic Survey.
National Geodetic Survey 101 Brett Howe Geodetic Services Division Chief 28 June, 2013 geodesy.noaa.gov.
National Spatial Reference System: Present and Future Marti Ikehara, Geodetic Advisor NOAA’s NGS, Sacramento
The National Geodetic Survey Gravity Program Benefits and Opportunities Juliana Blackwell, Director National Geodetic Survey (NGS)
National Height Modernization Program Renee Shields Christine Gallagher Great Lakes Region Height Modernization Consortium Fall Meeting 2012 Lansing, Michigan.
Upcoming Changes to the National Spatial Reference System
Evaluating Aircraft Positioning Methods for Airborne Gravimetry: Results from GRAV-D’s “Kinematic GPS Processing Challenge” Theresa M. Damiani, Andria.
New Vertical Datum: plans, status, GRAV-D update FGCS San Diego, CA. July 11, 2011 Mark C. Eckl NGS Chief of Observation and Analysis Division, New Vertical.
OUTLINE:  definition and history  three major models  how are reference shapes used  geodetic systems G EODESY.
Federal Geodetic Control Subcommittee Update to Coordination Group Juliana Blackwell Subcommittee Chair Director, National Geodetic Survey
NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Updating the International Great Lakes Datum Laura Rear McLaughlin Center for Operational.
Initial Results of the Geoid Slope Validation Survey of 2011 Dru Smith 1, Simon Holmes 1, Xiaopeng Li 1, Yan Wang 1, Malcolm Archer-Shee 1, Ajit Singh.
Lecture 21 – The Geoid 2 April 2009 GISC-3325.
Confirming 1 cm differential geoid accuracy: The Geoid Slope Validation Survey of 2011 Dru Smith 1, Simon Holmes 1, Xiaopeng Li 1, Sbastien Guillaume 2,
The Height Modernization Program in the United States and the Future of the National Vertical Reference Frame 1 Renee Shields National Geodetic Survey,
VRSWG Update Renee Shields Height Modernization Manager National Geodetic Survey January 10, 2012.
Height Modernization in the U.S.: Implementing a Vertical Datum Referenced to a Gravimetric Geoid Model Renee Shields National Geodetic Survey, U.S.A.
VRSWG Update Renee Shields Height Modernization Manager National Geodetic Survey July 24, 2012.
Federal Geodetic Control Subcommittee Update to Coordination Group Juliana Blackwell Subcommittee Chair Director, National Geodetic Survey
National Height Modernization Program Strategic Plan Renee Shields, Height Modernization Program Manager.
Federal Geodetic Control Subcommittee Update to Coordination Group Juliana Blackwell Subcommittee Chair Director, National Geodetic Survey
Investigation of the use of deflections of vertical measured by DIADEM camera in the GSVS11 Survey YM Wang 1, X Li 2, S Holmes 3, DR Roman 1, DA Smith.
Progress towards a common North American Geoid in 2012 Daniel Roman, Yan Wang & Xiaopeng Li National Geodetic Survey Geosciences Research Division.
Federal Geodetic Control Subcommittee Update Federal Geographic Data Committee Coordination Group Meeting 11 January 2011 Ronnie Taylor Acting Director,
Proposal for a comprehensive vertical datum for North America, Central America and the Caribbean Dru Smith, Dan Roman, Vicki Childers, Mark Eckl, Monica.
Overview of Datums Commonly Used in Michigan and the National Spatial Reference System Michigan Society of Professional Surveyors 70 th Annual Meeting.
Evaluation of the Release-3, 4 and 5 GOCE-based Global Geopotential Models in North America M. G. Sideris (1), B. Amjadiparvar (1), E. Rangelova (1), J.
Initial Results of the Geoid Slope Validation Survey of 2011 Dru Smith 1, Simon Holmes 1, Xiaopeng Li 1, Yan Wang 1, Malcolm Archer-Shee 1, Ajit Singh.
Federal Geodetic Control Subcommittee Update to Coordination Group Juliana Blackwell Subcommittee Chair Director, National Geodetic Survey
Improvements to the Geoid Models
Lecture 17: Geodetic Datums and a little Linear Regression
Presentation transcript:

New Datum: Vertical (Geopotential) FGCS Silver Spring, MD. July 24, 2011 Mark C. Eckl NGS Chief of Observation and Analysis Division, New Vertical Datum Project Manager

Vertical Datum Status United States Gravimetric Geoid 2012 (USGG12) Hybrid Geoid 2012 (Geoid12) 2022 Definition of the Vertical Reference Surface

Vertical Datum Other Geopotential Products Leveling Online Computation User Service (LOCUS) Vertical Time Dependent Positioning (VTDP) Geoid Slope Validation Survey 2011 (GSVS11) Floodplain Mapping Pilot Project

Goals: –Analyze how FEMA floodplain mapping will be affected by the release of the new datums –Provide recommendations for FEMA, cooperating partners and NGS Conclusions –Existing software and methods need to handle significant coordinates shift Horizontal: ft/0.828 m Vertical: ft/ m –Larger impact on higher accuracy elevation data –Minimal changes in the floodplain, will depend on the location, the mapping method, and engineering judgment –The development of an implementation plan is extremely important for FEMA and other agencies 4 Full Report:

Vertical Datum Other Geopotential Products Gravity for the Redefinition of the American Vertical Datum (GRAV-D) NEWTON ISAAC

White = FY13 Orange = FY12 Green = FY11 and earlier Complete In FY13 GRAV-D

White = FY13 Orange = FY12 Green = FY11 and earlier GRAV-D

That’s All, Folks Questions?