Presentation is loading. Please wait.

Presentation is loading. Please wait.

VRSWG Update Renee Shields Height Modernization Manager National Geodetic Survey July 11, 2011.

Similar presentations


Presentation on theme: "VRSWG Update Renee Shields Height Modernization Manager National Geodetic Survey July 11, 2011."— Presentation transcript:

1 VRSWG Update Renee Shields Height Modernization Manager National Geodetic Survey July 11, 2011

2 Identify common objectives, and find opportunities for cooperative projects, tasks (near-term) – Tri-lateral agency datum standardization (NOAA/USGS/USACE) – USGS Stream gage datum updates – USACE levee datum updates Vertical Reference System Work Group Work Plan USGS Stream Gage at Pacific Creek near Moran, WY

3 Identify Products and Services within each agency impacted by new vertical datums (near-term) – Develop strategy to address changes that will be required to P&S (near- to mid-term) – Develop pilot projects to address agency needs (near- to mid-term) Update existing guidelines, standards, specifications to support transition to new datums (long-term) Vertical Reference System Work Group Work Plan

4 Education, Outreach, Capacity Building for users (ongoing) Brief FGCS on accomplishments (ongoing) Identify POCs in agencies to join workgroup, perform tasks (ongoing) Vertical Reference System Work Group Work Plan

5 Teleconferences now held quarterly – next meeting October 6, 2011 – Attendance by NGA, USGS, USACE, NPS, FCC, FEMA – Meeting notes posted on FGCS web site Developed worksheet for each agency to identify their products/services that rely on vertical datums VRSWG Accomplishments: May 2010-Present

6 Agency Tracking Plan – DHS/FEMA

7 Agency Tracking Plan – USACE

8 Monthly teleconferences to inform users – value-added with guest speakers Education and outreach activities Support projects designed to enhance vertical component of NSRS, present and future – NC/FEMA Floodplain mapping pilot – see Poster session – TX Geoid Slope project – Surveys: So. LA, IGLD, MS and others Height Modernization Program Accomplishments: May 2010-Present

9 Discuss transition strategies with new datum project managers Support for GRAV-D and geoid model updates Develop National Height Modernization Plan (NHMP) – Internal Draft by end of FY2012 – Tie to NGS 10-year plan; incl. strategic plan and short-term operating plan – Emphasize coordination with federal partners – Include budget requirements/strategy Height Modernization Program Accomplishments: May 2010-Present

10 Infrastructure – Gap analysis – Modernize NGS geodetic control datasheets Guidelines, Models, Tools – Geoid12 – H- AND VTDP – OPUS: e.g. OPUS Projects workshop, July 11-12, San Diego – Update HM Guidelines, NGS58 and 59 Align NHMP with NGS Business Plan model

11 Education, Capacity Building – Update height modernization web site – Lidar workshop – August 18, 2011, Silver Spring, MD – 2 ND Federal Geospatial Summit, July 2012, San Diego, CA Align NHMP with NGS Business Plan model

12 Questions Renee Shields Height Modernization Manager 301-713-3231, x116 Renee.Shields@noaa.gov http://www.ngs.noaa.gov/heightmod/EventsArchive.shtml Fast is fine, but accuracy is everything. – Wyatt Earp A witty saying proves nothing. - Voltaire


Download ppt "VRSWG Update Renee Shields Height Modernization Manager National Geodetic Survey July 11, 2011."

Similar presentations


Ads by Google