March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.

Slides:



Advertisements
Similar presentations
M1 Installation Schedule Plans Burkhard Schmidt Muon Meeting
Advertisements

CSC upgrade for LS1 USA-15 rack: layout, construction and installation 11 th February 2013.
Large Wheel Installation Helped with initial installation in 2005 Installed EML and EMS chambers in sector frame. Last chamber installed 31 October 2006.
Problems with UPS racks last week... During the DSS tests on the weekend Jun 1-2 all racks connected to „interruptable“ UPS were cut by DSS at some point.
19 March 2012Muon Week - Operations1 Muon Week Muon Operations Session Introduction Status and LHC Schedule Detector Readiness + Preparation for Physics.
Saverio MINUTOLITIG meeting, 10 February Report on T1 installation activities and achievements made during this shutdown.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D. J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D SAFETY J.Pothier (GLIMOS) C.Schäfer (deputy GLIMOS) DISMANTLING.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling on YB Fabio Montecassiano INFN PH/CMM.
8 June 2006A.Ciocio - SCTSG1 SCT Services Installation Type IV PP3 Type II-III and PP1 Testing & Installation Plan Workpackage
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
Muon System Safety Issues Burkhard Schmidt.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
ATLAS Muon System WBS 3.5 DoE/NSF M&O Evaluation Group Review BNL 19-Jan-06 Frank Taylor MIT V1.3.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
Technical Support Activities in PH-ADO-PO
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
Main priorities for the next years. Where do we stand Muon system in good shape (in my opinion) – Sub-systems hardware quite robust (see later for main.
EN-CV interventions during YETS
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 12/10/2005 LHCb - Install Meeting 12/10/05 TS/CV/DC Installations STATUS Ongoing works 1.chilled / mixed.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
SCTSG - 17 October 2006 A. Ciocio1 SCT Services Installation Update Recent Full Report: September ID week SCT Cables Web page:
1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.
TS May 9-12 – Schedule SL instructions: Both magnets ramped down Monday May 9 th 7:00 latest Thursday: check with CCC before restarting magnets: – TE-EPC.
Services in GIF++ A pictorial record of the work HV Cables LV cables DCS cables Signal Cables Ian Crotty 17 Dec 2014.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
Michel RAYMOND – July 1 st, 2013 Technical Support Activities in PH-ADO-PO Summary of 2013 activities.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
26/03/2014L-Ph. DE MENEZES & F. MERLET CERN/PH-DT-DI New recuperation system for n-Pentane:  Installation of the module in parallel of the first.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
Status of HO Installation Shashi Dugad Tata Institute of Fundamental Research India-CMS Collaboration Meeting, Chandigar April 2007.
Joerg Dubert’s Questions as you all aware we currently do not yet know how the final mechanical design of the new Small Wheel will look like. Nevertheless,
Beampipe Installation Status Ray Veness For the Beampipe team in AT/VAC and TS-MME.
Michel RAYMOND – December 7 th, 2012 Technical Support Activities in PH-ADO-PO Statement of 2012 activities Schedule & Organization on LS1.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
Claudio Bortolin. pump: replaced outlet filter: replaced demineralized cartridge: replaced mechanic filter on air control: replaced SSD chilled water.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
February 26 th 2013Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
ALICE 5 o’clock meeting Wk INDICO You’ll find this meeting here: – The full shutdown planning.
1 Drift Tubes TC activities up to LS2 1.Implement remaining Phase 1 upgrades :  in USC ⁻ TwinMux ⁻ microROS 2.Refurbish HV & LV Power Supply Systems ⁻
Atlas status report. LHC Cooldown Status LHC is proceeding with the cooldown and the hardware commissioning L.Evans is asking the experiments to close.
Interventions on electrical distribution and racks’ infrastructure still to be done during LS1 and their impact W.Iwanski.
TC meeting P2 planning wks 3&4 A.Tauro
CALO News Pascal Perret LPC Clermont 22 January 2012.
GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
ATLAS Plenary, Feb. 18th, 05Commissioning1 Report on the commissioning activities G. Mornacchi, P. Perrodo and Sub-Systems Collaborators.
Muon works in the next months. MDT Up to May 15 Commissioning of EE From May 15 for (at least) 2 moths DCS works – Installation of new hardware – New.
P. 1Mario Deile – TOTEMino: Status and Schedule Mario Deile Zone 2.Gas system 3.Cooling water 4.Cables 5.Safety 6.Schedule, Project Plan 7.Schedule.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
Safety Issues (TF, June 15, 2005)
CMS Area Working Group Meeting
PMD PMD Plans Detector Issues and solution Plans for LS1 29 June 2012.
CSC Electronics Installation and Commissioning CSCE I&C
CSC Electronics Installation and Commissioning CSCE I&C
Needed for Team A on -End
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions Zhen Yan March 12 th 2012

March 12 th 2013 Muon LS1 operation meeting2 Recap of last week March 6 th : –Muon(CSC,MDT and TGC) services disconnection done on SWC –All SWC flexible chains were disconnected. March 7 th : –SWA moved to standard opening position. (Thanks MDT and TGC supporting teams) March 8 th : –EELA15 service installation. ( LV, Fiber, DCS, Grounding, HV done ) –USA15 Rack Y26.16A cleaning up done. –SWC movement to HF truck at afternoon. –Turbine failed on RPC Rack Y4202X4 in UX15. –MDT gas system unexpected stopped after the SGX intervention. one bad coupler in the profibus PA line was replaced and fixed problem. March 11 th : –TGC HV test on BW chambers with portable power supply. ( 1 of 9 back to work ) –Broken turbine was replaced on Rack Y4202X4.

March 12 th 2013 Muon LS1 operation meeting3

March 12 th 2013 Muon LS1 operation meeting4 Muon related activities this week From March 11 th : –UX15 accessible from 7 am to 7 pm, Monday to Friday –Please follow the safety rule in the cavern Helmet, safety shoes, badge, harness etc March 12 th : –No access to barrel region due to TRT leak test March 13 th afternoon or 14 th morning: –SWC lift to surface March 11 th to 15 th : –EELA sector 1 mechanics installation –Everything go smoothly, then install the chamber March 15 th afternoon

March 12 th 2013 Muon LS1 operation meeting5 Other issues and discussions IMPACT IMPACT was approved for providing the access of USA15 works during LS1. –50+ names in the list. –Several peoples showed “denied” status mainly due to the missing dosimeter or training course. Need to prepare the IMPACT for SWC access in buffer zone after the lifting –Only provide the access for the relevant experts (CSC,MDT and TGC) Re-submit all PPSPS documents (no progress so far) Intervention –March 4 th to 12 th Muon Cooling intervention. –4 weeks USA15 cooling intervention will finish on March 20 th. Already asked the TGC DAQ resources back to available on March 21th. –April 11 th to 15 th limitation of barrel access due to Pixel extraction –April 15 th to 19 th Intervention on sectorisation of chilled water. DSS action need to be modified to ensure the EE commissioning) Unknown extra cables were disconnected on SWC sector 9 below the CSC HV splitter box ( see pictures in next page )

March 12 th 2013 Muon LS1 operation meeting6