January 26, 2011 TG3: Oil Mud Testing Procedures Report To SC13 Exploration & Production Winter Standards Meeting Renaissance Worthington Hotel, Fort Worth,

Slides:



Advertisements
Similar presentations
SC19 report to SC18 January 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas Lift, Barrier Valves, Completion.
Advertisements

Subcommittee On Pressure Relief Systems CRE Meeting Spring 2011 Meeting Clark Shepard.
Sub-Committee 13 API SC13 Drilling Completion and Fracturing Fluids June 13, 2012 Westminster, Colorado Paul Scott, Chair Johnna Smith, Secretary David.
2013 Exploration & Production Standards Conference Subcommittee 10 June 25 & 26, 2013 Capitol Hyatt Regency Washington D.C.
TG-8, Drilling Fluid Materials ( Xanthan WG) Develop addendum to current xanthan gum specifications in API 13A/ISO that address anomalies observed.
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
1 API SC6 Winter Meeting Update on CSOEM MARG Activities Tim Haeberle Chief Consulting Engineer – Materials and Processes GE Oil & Gas 4 February 2015.
January 26, 2011 TG 3: Oil Mud Testing Procedures While we welcome open participation, non- task group members are asked to hold questions and comments.
SPEC 13A Sec. 16 Drilling-grade Starch
Standards Governance Update Budget Overview SC Chair Rotation 2010 E&P Summer Standards Conference July 2, 2010 Washington, DC.
June 29, 2011 TG3: Oil Mud Testing Procedures Report To SC13 Exploration & Production Summer Standards Meeting Hyatt Regency San Francisco, California.
1 Accredited Standards Committee C63 ® - EMC ANSI ASC C63 Subcommittee 7 Spectrum Etiquette Report to C63 H. Stephen Berger Chair, SC7 November 13, 2014.
TG2: Publications SC13 – Report on Work Groups and Publications Sheraton Chicago Hotel & Towers Chicago, Illinois June 19, 2014.
TG # 6 API SC13 Meeting Winter Standards Meeting January 24 – 28, 2011 Fort Worth, Texas.
SC13 API SC13 Drilling Completion and Fracturing Fluids Jan 26, 2011 Fort Worth, TX Paul Scott, Chair Johnna Smith, Secretary David Ekas Vice-Chair.
SC13 Summer 2011 API SC13 Drilling Completion and Fracturing Fluids June 29, 2011 San Francisco, CA Paul Scott, Chair Johnna Smith, Secretary David Ekas.
TG7 Issues on RP 13D Rheology and Hydraulics Mario Zamora Exploration & Production Standards Conference API Subcommittee 13 June 27 – July 1, 2011.
API SC18 Work Group 2 API Exploration & Production Standards Conference on Oilfield Equipment and Materials Westminster, Colorado June 23, 2009 Ed Durante.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
API SC13 TG08 WG05 SPEC 13A Sec. 16 Drilling-grade Starch SC13 – Drilling Completion and Fracturing Fluids June 17, 2014.
Doc.: IEEE /0748r2 Submission May 2011 Tom Siep, CSRSlide 1 Process for Creating TGai Draft Date: Authors:
DICOM to ISO-DICOM Report to joint ISO TC215/WG2 – DICOM WG10 meeting January 24, 2004, San Diego.
ISO Liaison Report Hidenori Shinoda Charles Parisot.
3GPP2 Publication Process Training TSG-S PMT. December Presentation Overview Background OP Input and Intent Publication Process Overview The Revised.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC-18 Liaison Report TG-3: Definition of.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
2010 API Summer Standardization Conference Task Group 8, Work Group 4 Report to TG 8 6/29/2010.
SC13 –TG 2 PUBLICATIONS ISO / TC67 / SC3 / WG1 Worthington Renaissance – Ft. Worth, TX 26 Jan 2011 – 8:00 am.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
Task Group 8, Work Group _ API Reference Materials Work Group Work Group Members: BAKER HUGHES INC.; Don Krause* CHEVRON : Keith Morton HALLIBURTON – BAROID.
SC13 –TG 2 PUBLICATIONS ISO / TC67 / SC3 / WG1 Hyatt Regency – San Francisco 29 Jun 2011 – 8:00 am.
1 Accredited Standards Committee C63 ® - EMC ANSI ASC C63 Subcommittee 7 Spectrum Etiquette Report to C63 H. Stephen Berger Chair, SC7 May 1, 2014.
WG05: Well Abandonments CSOEM – SC 10 – Subcommittee on Well Cements 2016 Exploration & Production Winter Standards Meeting Austin, TX Joe Shine – Chair.
WG or TG # API SC13TG 10 API 19C Meeting July 15, 2014 Rapid City, South Dakota.
2016 Exploration & Production Winter Standards Conference Subcommittee Workgroup formed to address rewrite:
WG05: Well Abandonments CSOEM – SC 10 – Subcommittee on Well Cements 2016 Exploration & Production Summer Standards Meeting Washington D.C. Joe Shine –
API 2017 Exploration and Production Winter Standards Meeting
API SC 10, Work Group 13 Update:
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
Task Group API 19SS Sand Screens
API SC19 HPHT Template (Proposed as SC19TR1)
TG Chair: Mark Brinsden Shell
API SC 10, Work Group 3 Update:
Brent Estes, Chair Carl Stouffer, Secretary Saleh Al-Amari, Vice-Chair
API SC 10 Task Group on Stage Cementing Collars TG Charge Proposal
2017 API Subcommittee 13 on Drilling, Completion and Fracturing Fluids
Task Group API 19SS Sand Screens
2017 Exploration & Production Winter Standards Meeting
API RP 17A - Discussion Points
SC-10 Oil Well Cements WG-08; Static Gel Strength Testing Phase IV
2016 Exploration & Production Standards Conference Subcommittee 10
IEEE 802 Process for Interactions with ISO/IEC JTC 1/SC 6
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
API 17H TASK GROUP January 15, 2013.
2016 Exploration & Production Summer Standards Conference
SC13TG08 Drilling Fluid Materials
API Subcommittee 13 on Drilling, Completion and Fracturing Fluids
IEEE 802 Process for Interactions with ISO/IEC JTC 1/SC 6 & 7
WG on Composite Cements: Calgary Meeting 2017
Saleh Al-Ammari SC13 Chair
Saleh Al-Ammari SC13 Chair
2016 Exploration & Production Summer Standards Conference
API Subcommittee 13 on Drilling, Completion and Fracturing Fluids
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [A Brief Overview of Draft Approval.
API Publication Types From “API Document Format and Style Manual” and “Procedures for Standards Development” the following are “standards” 1. Bulletin.
Discussion Points API RP 17A Task Group Members
API SC 10 WG15 Stage Cementing Collars
Sheung Li Task Group J Chairperson March 19, 2004
CSOEM Materials Advisory Resource Group
Presentation transcript:

January 26, 2011 TG3: Oil Mud Testing Procedures Report To SC13 Exploration & Production Winter Standards Meeting Renaissance Worthington Hotel, Fort Worth, Texas January , 2011

January 26, 2011 TG Charge: Recommend needed changes and develop test procedures for field and laboratory testing of oil- based drilling fluids (results usually published in API RP 13B-2 / ISO and RP 13I / ISO 10416) TG3: Oil Mud Testing Procedures

January 26, 2011 Marvin Pless / Baker Hughes – Chair David Dino / Elementis – Secretary Brent Estes/ Chevron Larry Mitchell / OFITE Paul Scott / ConocoPhillips Tom Shumate / Baroid Catalin Ivan / ExxonMobil Tim Wilkin / M-I TG3 Members

January 26, 2011 WG1: Oil Mud Chemical Analysis Hibernation WG2: HPHT Direct Indicating Viscometers Sent back to WG to address TG comments WG3: Particle Size Distribution Testing of OBM / SBM Held one meeting and has developed a work plan for future action SR 3 : Measurement of NAF Internal Phase Activity Modifiers To be addressed by Paul Scott TG3 Report To SC13

January 26, 2011 Particle Plugging Test Revision for Inclusion in RP13B-2 Meeting with TG4/WG2, Ceramic PPT Procedure Re-Write New procedure will be applicable to RP13B-1, RP13B-2 and 13I WG2 to submit procedure to TG4 for approval Following approval of draft in TG4, draft procedure to be distributed to TG3 members for review / approval

January 26, 2011 Background: Increased emphasis on environmental aspects of drilling fluids is driving fluid companies toward non-chloride internal phase activity modifiers for non-aqueous fluids Introduced at the 2010 winter meetings SR 3 submitted by Brent Estes to the Task Group at the 2010 summer meetings Tabled by Task Group for further refinement Measurement of NAF Internal Phase Activity Modifiers

January 26, 2011 Actions assigned for consideration prior to winter standardization conference: Limit scope of materials to be addressed Inclusion of methodology for solids calculations into SR 3 document / WG Charge Measurement of NAF Internal Phase Activity Modifiers

January 26, 2011 Interested parties met on 12/7/2010 to draft a response to the Task Group: Activity modifiers to be considered Formates Nitrates Acetates Glycol / Glycerols Agreed to include methodology for utilizing activity measurements to calculate corrected solids. Measurement of NAF Internal Phase Activity Modifiers

January 26, 2011 Proposed Work Group Charge: Develop procedure(s) for measurement of non- chloride activity modifiers in non-aqueous fluids and methodology to use those measurements in corrected solids calculations. Measurement of NAF Internal Phase Activity Modifiers