Preamble Run 2 and Run 3 will see the continued exploitation of the forward physics potential of the LHC in the long straight sections (LSS) either side.

Slides:



Advertisements
Similar presentations
Mandate of Parameter and Lay out Committee (PLC) of the HL-LHC project L. Rossi HL-LHC PC.
Advertisements

The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Concept for the New Detector Chamber at the ESR Ion beam Internal Target Region  Lab *)  Flange axis Covered  range Flange size in mm A90° – 80°83°95°
Dr. José Miguel JIMENEZ LS2 Coordinator LHC Performance Workshop (Chamonix 2014) Session 8 - Long Shutdown 2 Strategy and Preparation Chair: José Miguel.
Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
Crab Cavities in IR1 and IR5 Some considerations on tunnel integration What will be the situation in the tunnel after the LHC IR Phase-1 Upgrade. What.
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
Machine Detector Interface for the HL (MDI) CERN, April 15, 2011 Austin Ball, Helmut Burkhardt, Marzio Nessi.
Construction and Installation of the CLIC Experimental Area
The new MEF Group S. Baird 12 th December The new MEF Group Mandate for the MEF Group MEF structure Support for LHC experiments Formal meetings/committees.
FP420 Vacuum Ray Veness. Contents o What is FP420? o How would it be installed in the LHC? o What would it look like? o What are the issues/interest for.
Forward physics pertinent ECRs Mike Lamont, Samy Chemli.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
Roles Committees Meetings
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Experimental equipment interacting with beam operation D. Macina TS/LEA Many thanks to my colleagues both from the experiments and the machine for their.
LS2 Other LHC Experiments Mike Lamont Thanks to: Michael Rijssenbeek (AFP) Joachim Baechler (TOTEM) Karl-Heinz Hiller (ALFA)
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
Agenda : CLIC Civil Engineering and Services (CES) WG.
Status Report – Injection Working Group Working group to find strategy for more efficient start-up of injectors and associated facilities after long stops.
Technical Support Activities in PH-ADO-PO
Requirements from the experiments D. Macina (EN/MEF) Conceptual Design Review LHC Phase II Collimation, CERN April Many thanks for input and discussion.
ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.
MEF - Machines & Experimental Facilities Linac4 project EN/MEF roles & responsibilities EN/MEF group meeting October J.Coupard1.
Technology Department LSS2 modifications Impact on the vacuum systems LTEX - 18/01/2011 Eric PAGE – TE-VSC.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Upgrade projects and APT update DT-LHCb coordination meeting 28 September 2015.
Accelerator and Technology sector organization from January, 1st, 2014 Frédérick Bordry 18 th November 2013.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
Michel RAYMOND – July 1 st, 2013 Technical Support Activities in PH-ADO-PO Summary of 2013 activities.
HL-LHC Organization: Now and post HiLumi
The integration of 420 m detectors into the LHC
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
BRANs at HL-LHC Sune Jakobsen (BE-BI-PM) 1st HL-LHC WP13 Project Meeting
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Long.
R ADIATION P ROTECTION ASPECTS LSS1 LHC f RE - INSTALLATION Cristina Adorisio (CERN - DGS/RP) LTEX Meeting – May 10 th, 2012.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
TE-CRG Activities D. Delikaris, TE-CRG.
1 st LTEX meeting Protecting the experimental caverns and personnel from a "sector 34 like" incident: work planned in the LHC tunnel Prepared by M GASTAL.
Beampipe Installation Status Ray Veness For the Beampipe team in AT/VAC and TS-MME.
DT Technical Space Overview December 2012 M.Capeans, A.Catinaccio PH-DT.
Michel RAYMOND – December 7 th, 2012 Technical Support Activities in PH-ADO-PO Statement of 2012 activities Schedule & Organization on LS1.
Dr. José Miguel JIMENEZ LS2 Project Leader, CERN 1 LS2 Days 30 th September2015.
Dubna Feb 2011 AB Baseline planning - from now to 2020 ~60 months of p-p running - 4 weeks of Heavy Ion Collisions every year (8 runs) - Annual year-end.
1 st of April st LS2C LS2 Committee Mandate and Organization 2 Chairman:Jose Miguel JIMENEZ Deputy:Jean-Philippe.
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
Follow-Ups and Project Structure R2E Meeting September 8th Project / Study Group / RadWG R2E Mitigation Project:  Responsible of development and implementation.
Integration of forward physics detectors into the LSS of the LHC D. Macina (TS/LEA) Technical Support 2004 Workshop.
LIU Configuration Management EDMS Documentation, Layout and ECRs This presentation follows the LIU-PSB specific presentation done on 9 th October 2014.
Operations Coordination Team Maria Girone, CERN IT-ES GDB, 11 July 2012.
29 October 2015 B. Di Girolamo. B. Di Girolamo – Collider-Experiments Day – 5 th HiLumi Annual Meeting 2 Collider-Experiments Interactions There is a.
Mandate Priorities Other tasks Membership Forthcoming reports to CTC
News and Introduction from CERN June 15th, 2005
TAXS and TAXN ABSORBERS - OVERVIEW
Installation of an Instrument on a CERN machine
LHC schedule.
Beam Delivery Systems and the Machine-Detector Interface Terms of Reference for the CLIC-ILC Collaboration Working Group B. Parker (BNL), D. Schulte.
Long Shutdown for the LHC: Vacuum Beam Pipes
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
LS2 LHC forward experiments
Upgrade Strategy for the Experimental Vacuum Systems
LS2 session J.M Jimenez, J.-P. Tock, K. Foraz 24/11/2017
Disabling Rules.
LHC SPS PS Impedance working group update 3rd July 2013 HL-LHC:
LHC LUMINOSITY (RATE) MONITORS
Radiation Working Group RADWG
Presentation transcript:

Preamble Run 2 and Run 3 will see the continued exploitation of the forward physics potential of the LHC in the long straight sections (LSS) either side of all experiment interaction points. – This will include operation of existing facilities, upgrades to these, and potentially new installations. A limited number of upgrades of the experiment beam pipes, and associated devices (e.g. TAS) will also take place during this period. The LTEX WG is stopped but the FWD installation is still fully supported by EN-MEF with a change in the organization. – Daniela Macina LMC 178 Directorate (Miguel Jimenez) foresees need for a forum to oversee activities previously coordinated by LHC Tunnel Experiments study group (LTEX) and the LHC Experimental Beampipes (LEB). 1

Objectives Provide a forum for discussing the planned operation of forward physics facilities situated in the LSS of the LHC experiments Provide a forum for discussing the plans for forward physics facilities upgrades planned in the period up to LS3. Act as an oversight body to check the compatibility and possible interference during installation and operations Define priorities and follow-up consolidation activities and upgrades of the LHC forward physics experiments during technical stops and long shutdown 2 (LS2). 2

Mandate 1/2 The working group is responsible for coordinating the activities related to the experimental detectors installed or to be installed in the LSS of the LHC. This responsibility is limited to activities planned to take place before LS3. The mandate covers all topics required to ensure the installation and operation of all modified or new beam-related components and their associated supports, alignment, and access equipment. This includes checks of apertures, impedance, specifications and follow-up of R&D and design. 3

Mandate 2/2 The mandate extends to beam vacuum related issues of new physics experiments to be installed before LS3 in the LHC long straight sections (LSS). The working group is also responsible for coordinating the activities related to experimental detector components installed or to be installed within the vacuum sector between Q1 and Q1 including issues related to the TAS and TAN absorbers. – This responsibility is limited to activities planned to take place before LS3. Where the components are foreseen to be in place during the HL-LHC era, compatibility checks pertinent to Run 2 and Run 3 shall be performed. The HL- LHC project team shall be responsible for HL-LHC related compatibility checks. 4

Tunnel Region Experiments Working Group (TREX) 5 Chair: Mike Lamont Deputy Chair: Mark Gallilee Technical Secretary: Francisco Sanchez-Galan Reporting line: – LMC, – HL-LHC technical coordination – LPC as required

LTEX/LEB membership 6

Membership - experiments 7 Provisional

Membership 8 3 e-groups have been created: trex-members; trex-alternates; trex-info Provisional

Incoming Qualification of new VELO with lower diameter LHCf run 2015 CMS ZDC crane TOTEM upgrade - progress Access to the forward detectors storage areas 9