Next Generation Nuclear Plant Licensing Strategy William D. Reckley NRC/NRO/ARP March 12, 2009.

Slides:



Advertisements
Similar presentations
New Reactors: NRC Plans, Process, and Progress David B. Matthews Director Division of New Reactor Licensing February 28, 2008.
Advertisements

New Nuclear Plants in the United States
Albert Coons April 21, 2009 Emergency Preparedness and New Reactor Licensing Process: An Update on Where We Are Now Federal Emergency Management Agency.
“Regulatory Risk-Informed Activities and Supporting PRA Technical Acceptability” Presented to Nuclear Energy Standards Coordination Collaborative (NESCC)
PERMITTING CHALLENGES FOR THE NEW GENERATION OF NUCLEAR POWER PLANTS Ping Wan Bechtel Power Corporation Ninth Nuclear Utility Meteorological Data Users.
Nuclear Energy University Programs Small Modular Reactors August 10, 2011 Dan Ingersoll presented by Bob Hill.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Licensing Options for the First US Demonstration Fusion Power Plant S. Abdel-Khalik ARIES Meeting, San Diego (February 3, 2008) G. W. Woodruff School of.
6/23/2015 Risk-Informed Process and Tools for Permitting Hydrogen Fueling Stations Jeffrey LaChance 1, Andrei Tchouvelev 2, and Jim Ohi 3 1 Sandia National.
Report on the role of land surveyors and associated regulatory framework workshop, Vilnius, March 2006 Saulius Urbanas, NLS of Lithuania.
MPMP Power Supply 1 Nuclear Power Update for The Society of American Military Engineers September 15, 2010.
Nuclear Energy: Safety, Radiological Protection and Physical Security in the post-carbon era (Energía Nuclear: Seguridad, Protección Radiológica y Seguridad.
Office of Nuclear Energy U.S. Department of Energy
Thailand NUCLEAR POWER PROGRAM INFRASTRUCTURE AND STATUS OF IMPLEMENTATION: Regulatory Body Prof. Dr. Chaivat TOSKULKAO Secretary General Office of Atoms.
The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon) December 2, 2009 David B. Matthews, Director Division of New Reactor.
R. Brad Harvey, CCM Physical Scientist Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11th NUMUG Meeting, St. Louis, MO, October.
A Proposed Risk Management Regulatory Framework Commissioner George Apostolakis Presented at the Organization of Agreement States 2012 Annual Meeting Milwaukee,
LEGAL FRAMEWORK & REGULATORY SYSTEM f or introduction of NPP into Vietnam Le Chi Dung (VARANS, Vietnam) Vienna, December 2008.
Performance Assessment Issues in Waste Management and Environmental Protection Annual Meeting of the Baltimore-Washington Chapter of the Health Physics.
PBNC- 1 Overview of US Nuclear Energy Initiatives /06- 1 Harold McFarlane President American Nuclear Society.
1 The U.S. NRC’s Reactor Certification and Licensing Process – Meeting the Challenge? Commissioner Peter B. Lyons U.S. Nuclear Regulatory Commission 15.
Small Modular Reactor Licensing Design Specific Review Standards 11/29/20121 Joseph Colaccino Acting Deputy Director Division of Advanced Reactors and.
Configuration Management in New Reactor Construction Tom Kozak, NRO/DCIP/CAEB
RIC 2009 Rulemaking Process: “NRC and Industry Perspectives on Improving Quality, Timeliness, and Consistency in 10 CFR 50.55a “A New Approach” Jacob Zimmerman.
1 Standards Database Initial Development Tom Boyce, NRC/RES/RGDB Nuclear Energy Standards Coordination Collaborative (NESCC) March 1, 2011
1 RIC 2009 Construction Inspection Program Loren R. Plisco Region II March 11, 2009.
NRC Materials Program Cyber Security Organization of Agreement States Annual Meeting August 2015 Adelaide Giantelli Office of Nuclear Material Safety and.
Presented by Dr. Kristóf Horváth Deputy Director General Hungarian Atomic Energy Authority Based on the Guideline developed by the WG on Computer Protection.
Integrated Used Nuclear Fuel Management Regulatory Information Conference U.S. Nuclear Regulatory Commission March 11, 2009 Steven P. Kraft Senior Director.
New Nuclear Generation Ellen Ruff President, Duke Energy Carolinas.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
Plant Parameter Envelope for Early Site Permits
Milestones or Millstones Alex R. Burkart, Deputy Director Office of Nuclear Energy, Safety and Security United States Department of State.
Project Licensing Status Jim Kinsey Director, Regulatory Affairs NGNP Project.
New Reactor Construction Inspection
New Reactors: Licensing Basis and Configuration Mgmt Challenges June 22, 2010 David B. Matthews Director Division of New Reactor Licensing Office of New.
1 Current Issues in Siting Safety Reviews Michelle Hart, Sr. Reactor Engineer Division of Site and Environmental Reviews NRC Regulatory Information Conference.
ANSI-NIST Nuclear Energy Standards Coordination Collaborative David Matthews, Director, Division of New Reactor Licensing Larry Burkhart, Chief, AP1000.
1 RIC 2009 NFPA 805 Regulatory Infrastructure Development Steven A. Laur, PE Sr. Tech Adv. Risk-Informed Initiatives NRC Office of Nuclear Reactor Regulation.
Developing a Data Base Supporting Very long- term Storage of Spent Nuclear Fuel R E Einziger, Ph.D., E. Benner, and C. Regan Spent Fuel Storage & Transportation.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Argonne National Laboratory Experience and Perspectives on Environmental Remediation Karen P. Smith Environmental Science Division Argonne National Laboratory.
International Atomic Energy Agency M. El-Shanawany IAEA Technical Support & Capacity Building Programme M. El-Shanawany Department of Nuclear Safety &
IAEA International Atomic Energy Agency Milestones in the development of a national infrastructure for nuclear power The Nuclear Security dimension Technical.
International Atomic Energy Agency School for Drafting Regulations on Radiation Safety RER/9/096 Vienna, 3 May, 2010 Adriana Nicic, Regulatory Activities.
1 NRC Update R. Brad Harvey, Leta Brown US Nuclear Regulatory Commission th NUMUG Meeting, Wilmington, NC.
The Yucca Mountain Repository for Nuclear Waste June Edward F. Sproat III Director Office of Civilian Radioactive Waste Management U.S. Department.
1 RIC 2009 NRO New Reactor Design Reviews and Engineering Jennifer Dixon-Herrity USNRC/NRO/DE March 11, 2009.
Adding Nuclear Power to the Grid ASQ Energy and Environmental Conference August 28, 2006.
Milestones for Nuclear Power Infrastructure Development Establishment of A Regulatory Framework Gustavo Caruso, Section Head, Regulatory Activities Section.
IAEA International Atomic Energy Agency Technical Meeting on Regulatory Oversight of Human and Organizational Factors Vienna, Austria | December.
IAEA International Atomic Energy Agency Development of the Basis Document for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
1 IRDP Courses and Workshops ― March 2015 U.S. NRC INTERNATIONAL REGULATORY DEVELOPMENT PARTNERSHIP (IRDP) UPDATE on COURSES AND WORKSHOPS Presented by.
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
DEVELOPMENT AND MAINTENANCE OF THE TECHNICAL AND SCIENTIFIC KNOWLEDGE BASE NECESSARY FOR TSO.
New Plant Regulatory Issues Kati Austgen Washington International Representatives Meeting July 12, 2012.
United States Nuclear Regulatory Commission NRC’s Risk-Informed and Performance- Based Approach to Decommissioning DOE Workshop on Risk-Based End States.
FY 2012 Budget Press Briefing February 14, NRC FY 2012 Budget NRC Mission: License and regulate the Nation’s civilian use of byproduct, source,
THE ROLE OF TSOs IN THE NATIONAL SAFETY ORGANIZATION
LLW Forum Meeting October 16, 2017 Alexandria, Virginia
NRC Cyber Security Regulatory Overview
Research and Test Reactor Safety: The Regulatory Perspective
Adding Nuclear Power to the Grid
Plant Parameter Envelope for Early Site Permits
NRC Update Nader Mamish, Director Emergency Preparedness Directorate
William D. Reckley, Branch Chief
IAEA Technical Support & Capacity Building Programme M. El-Shanawany
TWG goals, approach and outputs
Presentation transcript:

Next Generation Nuclear Plant Licensing Strategy William D. Reckley NRC/NRO/ARP March 12, 2009

Energy Policy Act of 2005 The NRC shall have licensing and regulatory authority.... The DOE and NRC shall jointly submit...a licensing strategy for the prototype nuclear reactor... Not later than September 2011, DOE shall select the technology for high temperature hydrogen production and initial design parameters for the prototype nuclear plant... Not later than September 2021, complete construction and begin operation...

Evaluation of Licensing Options DOE/NRC working group evaluated options, including: –Construction Permit/Operating License (Part 50) –Combined License (Part 52) with and without: Design Certification (DC) Early Site Permit (ESP) DOE/NRC jointly issued recommendations in August 2008 –Recommended Combined License without DC/ESP –Recommended approach using deterministic engineering judgment and analysis complemented by PRA information

Licensing the Prototype Reactor Requires productive use of pre-application period (now to 2013) Dependent on meeting major milestones, including supporting research and code development Requires development of new regulatory infrastructure Prototype may include compensatory measures to address uncertainties in the design (e.g., caused by delayed demonstration testing)

Going Forward Assess gaps in regulations and guidance Identify and propose resolution of policy issues Identify and develop plans to resolve key technical issues Coordinate licensing and research programs

Policy & Key Technical Issues Containment vs. confinement Staffing requirements Security requirements Role of risk assessments in licensing NRC fee structure Emergency planning requirements

Policy & Key Technical Issues Source term Operating conditions System and facility interactions Prototype testing program Conditional licensing

Coordination of Licensing & Research Fuel performance and manufacturing Fission product behavior Materials qualification Separate effects and integrated tests Computer code development and validation