IT-3872 Refurbishment of the piping of the chilled water circuit of the Proton Synchrotron Alexandre Broche EN-CV-PJ.
Advertisements

BIDDERS’ CONFERENCE IT-3980 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Up to 10 Tons Capacity 20 March.
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
BIDDERS’ CONFERENCE IT-3980 Replacement and Supply of Electrical Overhead Travelling Cranes up to 10 Tons Capacity March 20th 2014 Handling Engineering.
M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st October 2009 ATLAS cooling Group - Thermosiphon solution for ATLAS ID cooling.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.
Pierre Bonneau EN/CV/DC
TS-CV contracts case study LHC pipelines and HVAC for Experimental Areas R. Principe, J. Inigo-Golfin.
From Research Prototype to Production
Detector Cooling Project Thermosiphon Project Status Report
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire 1CERN - 4th November 2011 Experience from Construction.
M. Battistin – 28 th May 2010EN/CV/DC1 M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop - Back-up solutions to.
RP PROCEDURE FOR FLUID ANALYSIS Detector Cooling Project - 16 th June 2011 Heinz Vincke, Nadine Conan DGS/RP..... based on EDMS document # prepared.
IT-4103/EN Bidder’s conference Technical Specification for the Design, Supply, Installation and Commissioning of an HVAC system, a Smoke Extraction system.
F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011.
Concept idea for the modular 2PACL system for the Atlas ITK 3 June 2015 Bart Verlaat 1.
IT-4082 Design, Supply, Installation and Commissioning of the ventilation of the BAF3 building Alexandre Broche EN-CV-PJ.
19 th November 2010EN/CV/DC Thermosiphon project IV review - Overall cost estimation and planning Michele Battistin Elena Perez Rodriguez 19 th November.
CALLS FOR TENDER AND MARKET SURVEYS - ROLES AND PROCEDURES L.ANNILA, K.FORAZ PART 2. ROLE OF THE COMITE DE LECTURE.
Thermosiphon Project - Condenser repair CERN – Geneva January 8 th, 2014 M. Battistin & all TS team ATLAS + EN/CV.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st September 2009 ATLAS Working Group Thermo-siphon review - Low temperature condensation.
Engineering Department ENEN ENEN IT4070/EN/LHC Design, Supply, Installation, Testing and Commissioning of an HVAC Systems the for SR8 Facility Bidder’s.
Chiller control system Lukasz Zwalinski – PH/DT.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
Thermosiphon quality management and documentation EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
The Building 180 Cryogenic infrastructure water cooling system Stefano Moccia, EN-CV Coordination meeting 26/09/14.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Cooling System Solutions
Thermosiphon project management and quality assurance EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
60kW Thermosiphon control system
EN/CV/DC IT-3673 Presentation done by Elena Perez Rodriguez For further information contact For the purchase of cooling fluids.
Michele Battistin Elena Perez Rodriguez 10 November 2010
TS-CV-Detector Cooling 22-Jan-04P. Tropea - JCOV1 Design, construction and installation of a double loop fluorocarbon 150 kW cooling plant for the CMS.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
M. Battistin, J. Botelho – 20 October 2011EN/CV/DC Detector Cooling Project V Thermosiphon Workshop - Cost and Planning Michele Battistin Jose Botelho.
17 th November 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 – November 17 th 2006 Michele Battistin (TS/CV/DC) TS/CV Detector Cooling On call and.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
Purchasing supplies at CERN Procurement Rules Someone FP-PI.
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Design of the thermosiphon Test Facilities Thermosiphon Cooling Review A. MORAUX PH Dpt / DT Group CERN SEPTEMBER.
Thermosiphon Project for ATLAS ID C 3 F 8 Evaporative Cooling - Status Report ATLAS ID Week CERN – Geneva October 28 th, 2013 M. Battistin & all TS team.
IT-3963/EN Bidder’s conference Design, supply, installation and commissioning of the cooling system for the NA62 Gigatracker Tuesday 10 December 2013 Building.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
M. Battistin –6 th July 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 6 th July 2009 DCP WP3 First thermo-siphon workshop - Low temperature condensation.
Long Pulse Klystron Modulators SML (Stacked Multi-Level) topology
PROCUREMENT RULES FOR EXPERIMENTS AT CERN Dante Gregorio CERN Procurement Service.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
M. Battistin –17 th d June 2009 DC Project 1 M. Battistin 17 th June 2009 Detector Cooling Project - WP3 Advancement status.
For more information, please contact 24/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
IT-4135/EN Supply of Air Handling Units for Industrial HVAC Projects at CERN Technical Specification Paul Pepinster / EN-CV.
Demineralised water cooling system
10 12 and 14 TR Advanced Glycol Chiller
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
IT-4189 Supply and installation of a cryogenic distribution system
Bidder’s conference – 21st May 2013
ATLAS Thermosiphon Electrical Distribution and Run Modes
Low temperature chiller Market Survey
Specifications What should it cover Goods Services Warranty
Presentation transcript:

For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez

Introduction Scope of the tender General conditions for tendering and contracting Technical requirements Design Assembly Factory tests Delivery and installation at CERN Commissioning Maintenance Quality assurance Safety Annexes Conclusion CONTENTS 14/12/2010Thermosiphon project2

Introduction This presentation will go through the technical specifications for the chiller system. These documents have been sent to all the qualified bidders after the market survey Questions will be answered at the end of the presentation. 14/12/2010Thermosiphon project3

CHILLER UNIT(S) CHILLER UNIT(S) BRINE BRINE Scope of the tender 4 Primary water Chiller and brine : design, selection & purchase of components, refrigerants for chiller, construction, skids, installation, connection and commissioning Thermosiphon condenser and piping Thermosiphon condenser and piping Spares (1 year & h) Electrical design, functional analysis, electrical/control components, cabling and electrical/control cabinets Documenta tion and labeling Terminal blocks, PLC and software (UNICOS) Fluid for the brine

General conditions for tendering Pre-tender discussions Bidders conference - Questions and answers sent to all bidders 14/12/2010Thermosiphon project5 Technical and design P&ID, P-h diagram Dimensions and weights, general assembly drawings. Electrical power, compress air and water supply needed. MSDS for refrigerants and TDS for compressors, pumps and heat exchangers. Technical questionnaire. Reliability and risk analysis. Organization Work site organisation, preliminary schedule, project team. Working methods, protection means and test methods for commissioning. Purchase Price List. Tender form. Documents to be sent with the tender Refer to the purchase documents for more information

Adjudication of the contract Finance committee (16 march) Detailed design Functional analysis Detailed design Planning CERN approval of design Delivery Delivery of the skids at CERN. Installation Commissioning Commissioning on the by-pass. Acceptance of the equipment. Delivery schedule Thermosiphon project6 March 2011 April 2011 September 2011 October 2011 December 2011

Technical requirements Chiller units – Two circuits in cascade (high and low temperature). – Refrigerant to be chosen by contractor. 14/12/2010Thermosiphon project7 Brine circuit – Mono-phase liquid C 6 F 14. – Materials shall be compatible with fluorocarbons.

Chiller configuration I 14/12/2010Thermosiphon project8 C3F8 condenser 180 kW -70 °C liquid tank USA15 cavern Surface C6F14 brine circuit Primary water 27°C CHILLER 3 50% power for nominal operation ATLAS ID Detector UX15 cavern Back-up 50 kW -20 °C Brine circuit Redundant pumps CHILLER 2 50% power for nominal operation CHILLER 1 50% power for nominal operation

Power supply : configuration I 14/12/2010Thermosiphon project9 Standard power supply Diesel power supply 30 kW 45 kW 25 kW kW 45 kW

P&I for the configuration I 14/12/2010Thermosiphon project10

14/12/2010Thermosiphon project11 Chiller configuration II liquid tank USA15 cavern Surface C6F14 brine circuit Primary water 27°C CHILLER 4 100% power for nominal operation Redundant CHILLER 5 For emergency situation ATLAS ID Detector UX15 cavern C3F8 condenser 180 kW -70 °C Back-up 50 kW -20 °C Brine circuit Redundant pumps CHILLER 6 For emergency situation

Power supply : configuration II 14/12/2010Thermosiphon project12 Standard power supply Diesel power supply 25 kW 180 kW 20 kW 30 kW

P&I for the configuration II 14/12/2010Thermosiphon project13

Design Operation and reliability Power regulation – 20 ÷ 100% Temperature regulation – 20°C ÷ -70°C – Precision ± 1 K Compressor – MTBF > 40,000 h – MTTR < 10 h Chiller system – MTBF > 20,000 h Other Seismic requirements Sound level Reliability and risk analysis 14/12/2010Thermosiphon project14

Integration 14/12/2010Thermosiphon project15 Integration responsible: Alexander Bitadze To be approved by CERN’s safety team. Visit on site in the afternoon.

Assembly 14/12/2010Thermosiphon project16 All the components shall be pre-assembled in metallic frames (skids) – Maximum dimensions : 14m x 2.5 m x 3 m – 15 tons Control and electrical cabinets will also be pre-assembled – Space will be leaved for the PLC and the terminal blocks provided by CERN. The insulation shall be protected with an stainless steel cover.

Factory tests 14/12/2010Thermosiphon project17 The procedures and reports of all the tests shall be supplied

Delivery, installation and commissioning at CERN Delivery and installation Transport and handling of the system to CERN Point 1 (Switzerland) The installation shall be performed by the contractor. The contractor staff shall have the adequate training. CERN will provide its domain-specific training. Commissioning Done in collaboration between CERN and the supplier. CERN will provide the pre- tested program (according to the functional analysis). CERN will provide a dummy load for the tests phase. 14/12/2010Thermosiphon project18

Maintenance – Preventive maintenance plan and spare parts list provided by the contractor. – The Preventive Maintenance Plan shall be done during nominal operation at full power The chiller units shall be electrically independent including instrumentation 14/12/2010Thermosiphon project19

Quality assurance Documentation general – Documentation in English or French. – In a computer readable and editable form Labeling – The components shall be identified with labels. Technical documentation – Templates for: Technical dossier (STA), Functional analysis, spare parts and installed parts list. – Preventive Maintenance Plan shall also be provided 14/12/2010Thermosiphon project20 DescriptionFormat 2D drawingsAUTOCAD 3D drawingsCATIA Electrical drawingsMs Visio/ Tracelec / AUTOCAD Other documentsMs Word / Ms Excel / Ms Project

Safety Rules and regulations Can be consulted in the webweb CERN International and national standards Other documents Host states 14/12/2010Thermosiphon project21

Annexes Hydraulic 1. Basic P&ID 2. Technical prescriptions for piping and accessories 3. C6F14 technical characteristics and properties. 4. Technical requirements for the brine circuit. Electricity, control and regulation 5. Control and Regulation 6. Instrumen tation 7. Electricity Templates 8. Installed parts template 9. Spare parts list template 10. Purchase technical specification (STA) template. 11. Technical Dossier template. Other 12. Agenda for the bidders’ conference. 13. Price list 14/12/2010Thermosiphon project22

Conclusions An overview of the specifications for the chiller has been shown. More details can be found in the technical documents. The bidders are required to price the different options for the two configurations in the price list. 14/12/2010Thermosiphon project23