Extended Pid in PHENIX (assembly and integration ) 7/28/03 CDR review 07/28/2003, presented by E.Kistenev.

Slides:



Advertisements
Similar presentations
Integration & Information Marc and Qian. USTC Laser Pulse TrainLaser Signal from Barrel TOF Counter.
Advertisements

September 2006Dirk Wiedner / Installation1 3-D Rackwizard How to keep track of cables to the detector.
7/28/03P. Kroon AEROGEL Assembly of Cells into 80-cell Array: –8 cells wide by 10 cells high mm high (Y) by 2077 mm wide (Z) by about 335 mm deep.
Update on FMS Repair Stephen Trentalange STAR Management Meeting October 31,
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
July 28, Mechanical Design of the Cell - M. Konno, Univ. of Tsukuba 1 1.Introduction Requirements 2.Details description Design parameters, Cell Design.
(2003/Jul/28) Phenix Aerogel Upgrade ReviewSusumu SATO1 Contents: [1] Heat: (at PMT Base) [2] Fire: (from Material) [3] Electrical: (at HV connector) [4]
HBD Tasks Outline Thomas K Hemmick. New News  Second good QE result from Bob.  New quotes on reduced Glove Box:  $39,000 will not work (air lock too.
C. Bromberg 1 Michigan State University Feb. 8, 2004 RPC Monolithic Detector l Most absorber shipped direct to the site äShipping minimized äHeavy (~20.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
E-MAS Cooled Optical Bench (COB) System Overview Nov. 15, 2010 Roy W. Esplin Mike Watson Dave McLain Monte Frandsen.
P. 1Mario Deile – TOTEMino: Infrastructure Status and Schedule Mario Deile Zone 2.Gas system 3.Cabling 4.Cooling water 5.Counting-Room 6.Safety.
Reaction Plane Detector Safety Review Abigail Bickley, for the RxnP Group University of Colorado June 22, 2006 All data sheets can be found at:
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
ECAL Monitoring System Ivan Korolko (ITEP Moscow) PRR, September 2004.
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Reaction Plane Detector Safety Review Abigail Bickley, for the RxnP Group University of Colorado June 22, 2006.
CEDAR PMT Array DCS (Tim). Summary Summary of DCS monitored parameters based on original scheme – Major part of heat dissipation in electronics / PMTs.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
Commissioning of the ECAL A-side Irina Machikhiliyan, Reference data samples: #45498 PM HV nominal, LED LV = nominal, 5K of 5 TAE events, LED.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
M. Bonesini - MICE Inst Meeting M. Bonesini INFN Milano TOF installation plans.
7/28/2003DC/EC Review Aerogel Read out Electronics K. Ozawa, N. Kurihara, M. Inaba, H. Masui T. Sakaguchi, T. Matsumoto.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
PHENIX WEEKLY PLANNING 2/2/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 11/2/06 Don Lynch. 11/2/06 Weekly Planning Meeting 2 New Detectors TOF West HBD RXNP MPC North.
Robert Pak, FVTX Annual Review Nov Mechanical Integration WBS Robert Pak Brookhaven National Laboratory.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 3/23/06 Don Lynch. MPC Electronics MPC rack installed without cards. Cards to be installed As available and as access time is available.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
PHENIX WEEKLY PLANNING 10/20/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
PHENIX WEEKLY PLANNING 10/12/06 Don Lynch. 10/12/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
PHENIX WEEKLY PLANNING 10/26/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Cables Ian Crotty 8 May 2012 Cables for the RE4 Upscope in CMS News. The HV cables are in the Integration DB (INB/904) The Hv order is confirmed. Need.
Technical Support /16/08 PHENIX WEEKLY PLANNING 10/16/2008 Don Lynch.
Masahiro Konno for the Aerogel groupDC Meeting, Apr/14/04 1 Status of Aerogel Reconstruction –Track association implemented in CGL. –Raw data (ADC, TDC)
PHENIX WEEKLY PLANNING 3/30/06 Don Lynch. This Week MPC air flow started BLM source test HBD transparency monitor hutch work and cable tray 1 st MPC Card.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Meeting CERN 28 Nov A.B.Lodge - RAL 1 ECAL CMS ECAL Mechatronics Task Force Meeting.. CMS ECAL Mechatronics Scheme Applicability to EE Meeting held.
RICH Readout Plans F. Bucci, M. Piccini on behalf of the RICH WG.
LKr status R. Fantechi.
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
HF Test station at P5 A.Mestvirishvili.
F.Guber, A.Ivashkin INR, Moscow
Presentation transcript:

Extended Pid in PHENIX (assembly and integration ) 7/28/03 CDR review 07/28/2003, presented by E.Kistenev

Retaining PHENIX edge at High P T (1) coverage 4 m 2; (2) cell size 11x22 cm 2; (3) geometry 10 x 16 cells. TOF Aerogel Needs ToF backing to deliver on promises

Construction readiness ItemCurrent ReadinessCompletion Aerogel50% availableearly September PMT’savailable Boxes50% availableAugust pc-boardsIn Tsukuba Mech. componentsKnown problems: Side plates, HV protectors, lid extractors, lid holders. Purging systemNeeds strawman design and component ordering (Ruga/Pisani/Mike/Carter) Preamps~available, missing details of the box&mechanics design Cabling (LV/signal)understood and ordered/available Cabling (HV)options known&understood, still looking for chip solution InfrastructureSee P.Kroon’s talk

Aerogel Counters -build laminate container; -load aerogel into container; -assemble lid (pc board + lid itself); -install PMT’s, LED, gas connectors and solder all internal leads; -test assembled lid in the black box. - install side bars onto the counter box; - load container container; - install lid; - test assembled counter for light leaks. Repair leaks …..

Building Arrays -A-frame -array skeleton;

Cabling: trays; preamp boxes; HV&signal cables; Gas connections: -manifold; -distribution lines; System test: -purge; -raise HV; -trigger LED’s; -test for the signals on preamp input/output using scope, check for the light leaks; Live support

Job coordinator/chief tech in the Assembly Area: Mike Lenz Clean Area8/11/03 Storage Area8/11/03 Components in Storage8/18/03 Work benches available8/11/03 All personnel at BNL8/18/03 Work planning meeting8/18/03 Counters for the first Array ready9/8/03 A-frame ready9/10/03 First (North) Array ready9/19/03 Logistics

Racks: Symmetrical configuration North&South; Narrow racks are sufficient to run Aerogel component; LV crate HV crate Aerogel (RICH) FEM & Interconnects LED drivers Wide rack are for the ToF component & Trigger Gas: N2 is the boil-off from the LN2 tank. Heating is due to the long transfer lines (is winter is of concern, do we need to control gas temperature?). Flowmeter (limit ~ few x 100 lph) in the gas house, same for the filter. Integration in PHENIX

Goals September 19 th First Aerogel Array ready for Installation. October 1 st North Aerogel Array installed; North Aerogel Rack fully tested and installed (request from JH – FEM to 1008 now); October 10 th North Aerogel Detector is in Big Partition. K-K- ++ e+e+  D+D+ D0D0 _ K+K+ -- oo  