ATLAS Pixel Detector July 2003 Insertion Device Costs A. Smith, LBNL 1 Insertion Device Costs Overview US Pixel Meeting July 9, 2003.

Slides:



Advertisements
Similar presentations
SCT BARREL PAR - RAL May 2003 Status of Barrel Mechanical Structures - Cylinder manufacture - Bracket and small components manufacture - Dry assembly.
Advertisements

HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
NTOF11 Hg System Design Status Van Graves Tony Gabriel, Phil Spampinato Collaboration Meeting – Princeton University Apr 2005.
ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.
HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
Conceptual Design Presentation ME 4182 Team: Guys Engineering Nathan Bessette, Rahul Bhatia, Andrew Cass, Zeeshan Saiyed, Glen Stewart YJ Chok.
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Design, Prototyping, and Production PST Progress Update September 2002.
ATLAS Frame PRR 1 W.O. Miller Feb US ATLAS Pixel Detector Global Supports PRR W.O. Miller, R. Smith, W.K. Miller, R. Baer HYTEC G. Gilchriese, E.
ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
PXL insertion 1.PXL Insertion Steps after PXL installation system is aligned 2.PXL removal steps 3.Some design details 2/3/20131 Table of contents:
Presented By: Wahaj Adil TS-1
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Interactive Xylophonic Keyboard Mini-Mozarts November 9, 2006 Gordon Farmer Michael Johnson Eric Laumann Bryan Marek Philip Moss.
ATLAS Pixel Detector October 2001 Pixel Week N. Hartman LBNL 1 PST Design Update PST CDR october 2001.
HFT PXL Mechanical July 2010 Howard Wieman LBNL 1.
M. Gilchriese Mechanics Labor and Disk Sectors US Pixel Meeting November 2001.
ATLAS Pixel Detector July 2003 ETC ‘04 E. Anderssen LBNL BPSS and Service Panels Santa Cruz, CA E Anderssen LBNL.
The STAR HFT PXL system is designed to be inserted in situ. Is housed in 2 large frame aligned with rails inside Inner Detector Support. Inserted from.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
Magnetic Material Specification and Procurement Strategy Dawn Munson 1.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
M. Gilchriese Upgrade Stave Assembly and Robotics August 3, 2007 LBNL.
ATLAS Pixel Detector Pixel Support Tube Interfaces LBNL Internal PST Review E. Anderssen, LBNL.
FEBRUARY 2003 Pixel Support Tube A. Smith LBNL 1 ATLAS Pixel Support Tube PRR: Parts Pixel Support Tube Production Readiness Review Parts Overview Alexis.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
ATLAS Pixel Detector JULY 2001 Pixel Support Tube N. Hartman LBNL 1 Pixel Support Tube Concept and Design N. Hartman, E. Anderssen, G. Gilchriese, S. Dardin.
ATLAS Pixel Detector Service Quarter Panel Update And PP1 Work July 4, 2006 Pixel Integration Meeting M Cepeda, S Dardin, K Kennedy, R Post, M Pereira,
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN.
M. Gilchriese Disk Geometry January 18, M. Gilchriese 2 ATLAS Coordinate System.
ATLAS Pixel Detector Project N. Hartman LBNL 1 Alexis Smith Intern Progress Report Neal Hartman, March 25, 2003.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
1 US Pixel Mechanics Role Global support structureIntermediate support structureLocal support structure Stave SectorDisk Barrel x (9-11) x5 x (22,40,56)
M. Gilchriese Overview of Production Plan for Pixel Global Support and Disk Support Rings M. G. D. Gilchriese Lawrence Berkeley National Laboratory February.
M. Gilchriese Sectors, Rings, Frame Assembly and Installation July 18.
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
Status of Torino-Dubna Production Aluminum Plates production: Torino: steady production ongoing, 2715 plates cut, 194 chambers=48MB1.
1 Pixel Detector General –July Evidence of galvanic corrosion in EU barrel cooling tubes. Recovery plan implemented, this problem now solved but…..
IPC-2221 Connectors and Interconnects
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
ATLAS 1 Beam Pipe Support Structure (BPSS) Services Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman, A Smith, LBNL S. Coelli,
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
ATLAS Pixel Detector Pixel Support Tube and Related November 9, 2001 Pixel Day E. Anderssen, LBNL.
ATLAS Pixel Detector July 2003 SC Pixel Meeting N. Hartman LBNL 1 Pixel Support Tube WBS Santa Cruz Cost Workshop July 9, 2003.
Part Drawings Team Flying Sheep: Mark Berkobin John Nevin John Nott Michelle Rivero Christian Yaeger.
December 1999 Frame and Assembly Planning Status E. Anderssen, D. Bintinger, M. Gilchriese and F. Goozen LBNL W. Miller Hytec, Inc.
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Cost and Production Schedule September 2002.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
Michel RAYMOND – July 1 st, 2013 Technical Support Activities in PH-ADO-PO Summary of 2013 activities.
DCal Insertion Tooling 24/02/ DCal Insertion Tooling DCal Insertion System feature following main components 1. One rotator : cylindric welded structure.
Project Close Out Insert project name Presented by: name and title Date.
ATLAS Pixel Detector Pixel Support Tube Interfaces Pixel Support Tube PRR CERN, Geneve E. Anderssen, LBNL.
M. Gilchriese WBS Pixel System DoE/NSF Review May 2003.
Sport Bike Lift Flying Sheep John Nevin Michelle Rivero Christian Yaeger John Nott Mark Berkobin.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
Cloudland Instruments Hawkeye Mechanical Design Snapshot Compiled April 8th, 2016.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Slide 1 Insert your own content.. Slide 2 Insert your own content.
RFCC Engineering Status and Plans Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Meeting March 6, 2012 March 6, 2012.
ATLAS 1 Beam Pipe Support SCT TRT Side CSide A Services and Beampipe Support Frame Services and Beampipe Support Frame Pixel Detector Composite support.
LHC Experimental Vacuum Systems Status October ‘07
Mechanics: (Tim).
Low Mass mechanical design
Hawkeye Mechanical Design Snapshot
Slide 1 Insert your own content.. Slide 1 Insert your own content.
Slide 1 Insert your own content.. Slide 1 Insert your own content.
Development of Reference Geometry DB of ATLAS Detector Reproduction of Inner Detector Kobakhidze Shota 25/04/2019.
Presentation transcript:

ATLAS Pixel Detector July 2003 Insertion Device Costs A. Smith, LBNL 1 Insertion Device Costs Overview US Pixel Meeting July 9, 2003

ATLAS Pixel Detector July 2003 Insertion Device Costs A. Smith, LBNL 2 Pixel Package Insertion Device Overview Rolling and Sliding Rail Riders –3-part rolling trolleys on either side of barrel Mounted to and between frame and beampipe support plate –2-part sliding riders at far ends of pixel package Mounted to beampipe support plates Mounts to PST, frame and beampipe support plate Mechanism for pulling in package Key Cost Points –FY03 costs (for prototyping) are within budget, excluding tech time –FY04 costs (for production) were not included in previous budgets

ATLAS Pixel Detector July 2003 Insertion Device Costs A. Smith, LBNL 3 Insertion device design schematic Insertion device includes –2 Sliders at far A and C sides –2 Rolling Trolleys, each between services and frame –Set of four pixel mount ramps –Frame-to-trolley mounts –Frame-to-ramp rollers –Trolley interlink Services CServices A Frame Trolleys Sliders Pixel Mount Ramps Trolley Interlink

ATLAS Pixel Detector July 2003 Insertion Device Costs A. Smith, LBNL 4 Insertion Device Key Structures Sliding surfaces 2-part Sliding Rail Rider3-part Rolling Trolley Rollers Frame Mount

ATLAS Pixel Detector July 2003 Insertion Device Costs A. Smith, LBNL 5 Insertion Device Key Structures 3 Mounting Inserts to Beampipe Support Plate 3 Mounts on Frame Endplate (distributed) Plus components for pulling in package: trolley interlink, pulley system, capstan winch

ATLAS Pixel Detector July 2003 Insertion Device Costs A. Smith, LBNL 6 Insertion Device Key Structures Pixel Mount Blocks and Rollers

ATLAS Pixel Detector July 2003 Insertion Device Costs A. Smith, LBNL 7 Insertion Device Deliverables A- and C-side Trolleys A- and C-side Sliders Pixel Mount Blocks and Rollers Insertion mechanism All interfacing mounts Insertion Device must be delivered in time for dry assembly with PST in August ’04

ATLAS Pixel Detector July 2003 Insertion Device Costs A. Smith, LBNL 8 Schedule FY03 through 2 nd quarter FY04: Prototype FY04: Production August FY04: Delivery

ATLAS Pixel Detector July 2003 Insertion Device Costs A. Smith, LBNL 9 Costs Costs do not include tech hours $30k included in FY03 budget for insertion device No previous budget for FY04 costs Some expensive prototype parts to be reused for production Total cost to complete including tech time: $98,372