News and Miscellaneous UPO Jan. 11 2013 Didier Contardo, Jeff Spalding 1 UPO Jan. 11 2013 -Workshop on Upgrade simulations in 2013 (Jan. 17/18) -ESP in.

Slides:



Advertisements
Similar presentations
Introduction Ricardo Gonçalo HSG5 weekly meeting – 19 January 2012.
Advertisements

DOE/NSF U.S. CMS Operations Program Review Closeout Report Fermi National Accelerator Laboratory March 10, 2015 Anadi Canepa, TRIUMF Anna Goussiou, University.
1 News and Miscellaneous UPO May Didier Contardo, Jeff Spalding -Phase 2 Scope and Cost exercise.
Financial Systems Needs Assessment Project Update Monthly Research Administrators Meeting March 11, 2010.
O. Buchmueller, Imperial College, W. Smith, U. Wisconsin, October 15, 2012 Trigger Performance and Strategy Working Group Trigger Performance and Strategy.
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
Upgrading the CMS simulation and reconstruction David J Lange LLNL April CHEP 2015D. Lange.
LCFI physics studies meeting, 28 th June 05 Sonja Hillertp. 1 Report from ILC simulation workshop, DESY June Aim of workshop: preparation for Snowmass;
Status & Goals of LHC 1 1pb-1 of delivered and recorded luminosities reached! As of this morning: Delivered: 1420 nb-1 Recorded: 1245 nb-1 New record Inst.
CMS Full Simulation for Run-2 M. Hildrith, V. Ivanchenko, D. Lange CHEP'15 1.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
IS&T Project Management: How to Engage the Customer September 27, 2005.
Implementing a Calibration Management System Cory Otto Principal Metrology Engineer, Boston Scientific 10 October 2012.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
General news CLIC detector and physics meeting at LC2013, May 30 th 2013 Lucie Linssen L. Linssen, CLIC detector & physics meeting, May 30th
1 HCAL Upgrade TP simulation studies Jane Nachtman (Iowa) – for the HCAL group Trigger Upgrade meeting April 28, 2010.
1 News and Miscellaneous UPO Mar Didier Contardo, Jeff Spalding o General news o ESP and Manpower needs o Reviews o Document to RRB o DESY week.
News from the Beatenberg Trigger Workshop Ricardo Gonçalo - 18 February 2009 Higgs WG Meeting during ATLAS Week.
T. Kawamoto1 Small Wheel upgrade project Muon week, upgrade meeting T. Kawamoto.
University of Wisconsin System HRS Project Update to ITC November 19, 2010.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
2010 W EST V IRGINIA GIS C ONFERENCE Wednesday, June 9, 2010.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
CMS Upgrade Workshop, November 2008 H. W. K. Cheung (FNAL) 1 Simulation WG Summary There was no actual separate Simulation Working Group/sessions.
Detector Diagnostics Calibration Analysis Ped/LED/Laser RadDam Analysis Detector Optimization Lumi Detector Performance Monitoring DQM On/Offline Prompt.
TDAQ Upgrade Software Plans John Baines, Tomasz Bold Contents: Future Framework Exploitation of future Technologies Work for Phase-II IDR.
1 News and Miscellaneous UPO Mar Didier Contardo, Jeff Spalding o General news o ESP and Manpower needs o Cost scale for phase 2 o June Upgrade.
HCAL DPG Status1 Olga Kodolova / Frank Chlebana HCAL DPG Status Olga Kodolova for the HCAL DPG October 20, 2011.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
CLICdp achievements in 2014 and goals for 2015 Lucie Linssen, CERN on behalf of the CLICdp collaboration CLIC workshop, January 30 th
Lcsim software: status and future plans ECFA-LC DESY May 28, 2013 Norman Graf (for the sim/reco group)
1 News and Miscellaneous UPO Apr Didier Contardo, Jeff Spalding News from Oct. RRB HL-LHC Pile-up for simulation Upcoming events: DESY week – Taipei.
Upgrade Result Approval: CMS and Tracker Frank and Andrea 21/5/14Pixel phase 1 MB1.
Overview of a Plan for Simulating a Tracking Trigger (Fermilab) Overview of a Plan for Simulating a Tracking Trigger Harry Cheung (Fermilab)
Peter Sharp CERN CMS Tracker Summary of the Tracking Trigger Working Group Peter Sharp 21 November 2008.
1 ILD Workshop purpose and scope Yasuhiro Sugimoto May 23,
Software Tools for Layout Optimization (Fermilab) Software Tools for Layout Optimization Harry Cheung (Fermilab) For the Tracker Upgrade Simulations Working.
General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Recent developments:  ME0 inserted into HGCAL as for other.
News and Misc Didier Contardo, Jeff Spalding UPO 3/2/12 1 UPO 2/2/12 o The MM, cost estimates and reporting o Milestones and scheduling o Chamonix Meeting.
1 Towards Phase 2 TP releases 2013 Didier Contardo, Jeff Spalding Status of current simulations studies and ongoing issues Needs for TP preparation.
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
Analysis Performance and I/O Optimization Jack Cranshaw, Argonne National Lab October 11, 2011.
W. Smith, U. Wisconsin, Upgrade MB, Sept. 9, 2011 Proposal Reviews - 1 Upgrade Peer Review Report Wesley H. Smith U. Wisconsin CMS Upgrade Peer Review.
CMS Trigger Upgrades Phase-I (1) Muon Trigger Upgrades: – CSCTF (CSC TrackFinder) – MPC (Muon Port Card) Calorimeter Trigger Upgrades: – HCAL TPG – Calorimeter.
News and Miscellaneous UPO Nov Didier Contardo, Jeff Spalding 1 UPO Nov L1-Trigger TDRs -Upcoming Proposals for Phase 1 -CMS week Dec.
R&D per l’LHC upgrade di fase 2 1 Iniziative verso la fase 2 : USA: Snowmass, (Jul 29 - Aug 6, 2013) HL-LHC Experiment ECFA Workshop, Aix-les-Bains Oct.
Lcsim software: status and future plans ECFA-LC DESY May 30, 2013 Norman Graf (for the sim/reco group)
27-Jan-2014 Upgrade Steering Group “Update on Phase 2 TP - muons” J. Hauser, UCLA  Update on progress for TP:  2 slides follow to be shown at USG02 (Upgrade.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Current Status of the Tracking Trigger Software Andrew W. Rose.
R. Croft, Exclusive Diffractive Higgs Signal at L1, Jan 2005 Diffractive Higgs Events in the L1 Trigger ( Work in progress ) Richard Croft, University.
Pixel Phase 1 Physics/Simulations (Fermilab) for the Tracker Upgrade Simulations Group Pixel Phase 1 Physics/Simulations Harry Cheung (Fermilab) for the.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Technology and R&D Summary and next steps Burkhard Schmidt.
News and Miscellaneous Didier Contardo, Jeff Spalding UPO August 03/ UPO 08/03/12.
Phase1 Tk Upgrade Maintain instructions on a twiki CMSSW_4_2_8_SLHCtk
News and Misc UPO Meeting Jan 16, 2012
ILD Technical Coordination
UPO meeting Nov. 29, 2013 D. Contardo, J. Spalding News
Tracker Upgrade Simulations Software Harry Cheung (Fermilab)
Brief summary of discussion at LCWS2010 and draft short term plan
Studies for Phase-II Muon Detector (|η| = ) – Plans
Third Workshop on GEMs for CMS
Status of Full Simulation for Muon Trigger at SLHC
TK Upgrade report.
Overview of CLAS12 Calibration
Francesco Forti University and INFN, Pisa
Technical Advisory Committee
Rule 21 Working Group 2 IN-PERSON WORKSHOP August 29, 2018
Presentation transcript:

News and Miscellaneous UPO Jan Didier Contardo, Jeff Spalding 1 UPO Jan Workshop on Upgrade simulations in 2013 (Jan. 17/18) -ESP in 2013

UPO Jan Towards phase 2 TP: preparatory work in 2013 o Prepare internal document on CMS phase 2 concept  focus for June 2013 Upgrade DESY 1)Longevity and long term performance of current detectors 2)Physics goals, and detector requirements In conjunction with ESPG and Snowmass 3)Detector concepts and preliminary performance studies 4)Targeted R&D program 5)Cost scale for Phase 2 o CMS discusses the document ~summer 2013 (ahead of ECFA workshop in Sep.) o Define phase 2 scope by end 2013 o Write Technical Proposal supported by detector performance and physics simulations (  in Physics TDR?) in 2014 Slide from CMS Week o Interim reports from the two WGs – due this month o Stand-alone documents which will become appendices of a covering note on Phase 1 detector longevity – due February -Electronics and systems (Magnus to lead a group) -Tracker (a simple note now on longevity vs temp to be updated by end of LS1) -HCAL (summary of what’s known and plans) -ECAL (summary of studies to date and projection) -Muon (based on (work for the) the Strategy Document) How to Proceed? First steps:

Proposal for Jan. 17/18 workshop UPO Jan Goals of the workshop Prepare an overall plan for upgrade simulation studies in 2013 to address 1)Longevity and long term performance of current detectors 2)Physics goals, and detector requirements In conjunction with ESPG and Snowmass 3)Detector concepts and preliminary performance studies o Define the requirements and performance studies needed : -For detector optimization -For physics studies o Define the software developments needed -Geometries -Local Reconstruction -Object reconstruction o Define the samples needed (from central production) o Coordinate the release software developments and MC productions -Establish timeline for the software developments and performance studies -Define priorities

Proposal for Jan. 17/18 workshop UPO Jan Goal of the workshop: Develop plan for upgrade simulation studies in 2013 (Note key dates in 2013: Upgrade Week DESY June 3, ECFA/Atlas/CMS Workshop September 4 (TBC)) o Studies with Phase 1 detector operating at phase 2 pile-up, including detector aging Establish reference for comparison with phase 2 detector - assess performance limitations (especially for non upgraded detectors) - tune high pile-up object reconstruction and physics analyses…  What is missing to produce MC samples o Studies with Phase 1 detector and "extended performance module(s)" To establish detector/trigger requirements (or priorities) and physics performance (parametric endcap/forward calorimetry, improved muon(?), timing in the forward region, and tracking beyond current eta range, trigger requirements…)  What are the specific goals and the software development efforts involved  Studies by May to be reported and summarized in June Upgrade Week, with the goal of including performance criteria for Phase 2 in the summer document for CMS o Studies with Phase 2 detector and new trigger concept Establish detector and physics performance at HL-LHC  Plan a common release with first implementation of new detector concept and trigger for first full/fast simulation studies – present progress in June Upgrade Week.  Results for September ECFA workshop

Proposal for Jan. 17/18 workshop agenda UPO Jan Thursday 17 Session 1: Opening (9: :00) conveners Didier/Jeff o Introduction (UC/PC) -Upgrade goals and schedule for 2013 o HL-LHC beam conditions -Assumptions for luminosity (peak, leveled, integrated), beam spot and pile-up density o Goals and schedule for physics studies in 2013 o Overview of detector concepts and context for upgrade simulation studies o Release and Production plan (Offline/PPD/Computing/Simulation) -Status of current release(s) (phase 1 detectors) -Issues for high pile-up simulations and MC production - fullsim vs fastsim... -Proposal for new release(s) and schedule -Release validation Session 2: Projects and Working Groups simulation plans for 2013 (14:00 – 18:00) conveners Lucia/Liz Address the plans for the three areas of simulation studies mentioned in previous slide, focusing on the relevant one(s) for each project and wg o ECAL - HCAL - Muons - Tracker - Forward Detector - Trigger -Status and plans (schedule/steps) for CMSSW software developments of phase 2 detector and trigger implementation in full/fast simulation (covering: detector aging, new geometry, local reconstruction, trigger primitives, L1 trigger and HLT emulation...) -Performance studies and specific MC samples associated (full/fast sim, digi/reco...) -Need for fluence/irradiation simulations...

Proposal for Jan. 17/18 workshop agenda UPO Jan Friday 18 Session 3: Data reconstruction (9:00 – 10:45) conveners Patrizia/Luca Addressing status and plans for physics object reconstruction at high pile-up with phase 1 and phase 2 detectors, specific MC sample need. o Implementation of HCAL depth segmentation in reconstruction (HCAL) o Development of track reconstruction at high pile-up for phase 1 and phase 2 detectors (TK POG) o Development of GED at high pile-up for phase 1 and phase 2 detectors (tbd) Session 4: Physics plans (11:15 – 13:00) convener Chris Addressing goals, status and plans to develop software tools and MC physics benchmark samples needed (specific or common) in three main areas : o Studies with Phase 1 detector operating at phase 2 pile-up, including detector aging o Studies with Phase 1 detector with "expended performance module" o Study with Phase 2 detector and new trigger concept Session 5: Closing session (14:00 – 16:00) conveners Didier/Jeff o Wrap-up of workshop and general discussion on next steps

ESP – discussion – plan to converge for 2013 UPO 2/2/12 7 WG conveners, Elec/Online coordinators, R&D coordinator, each responsible for estimating need and approving pledges